CurbScoop
CurbScoopBuildingsHomecrest1717 EAST 18 STREET

1717 EAST 18 STREET

Brooklyn· Homecrest· built 1957class D4BBL 3068010001
Open listing source

1717 EAST 18 STREET is a 103-unit building in Homecrest, Brooklyn, built in 1957.

4 units are on the market here right now.

City records show 13 DOB permits and 65 open violations on file.

Units (res)
103
Floors
6.0
Lot ft²
28,000 ft²
Bldg ft²
105,000 ft²
Assessed
$2.74M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1717 EAST 18 STREET #4F
Brooklyn · built 1957
Homecrest$299K-0 ft²1 bd · 1 ba-175
5 HPD-C3 DOBbedbug
16.1Source
1717 EAST 18 STREET #2T
Brooklyn · built 1957
Homecrest$429K$454945 ft²2 bd · 1 ba-50
5 HPD-C3 DOBbedbug
16.1Source
1717 EAST 18 STREET #4P
Brooklyn · built 1957
Homecrest$310K$367844 ft²1 bd · 1 ba-147
5 HPD-C3 DOBbedbug
16.1Source
1717 EAST 18 STREET #5B
Brooklyn · built 1957
Homecrest$450K-0 ft²2 bd · 1 ba-21
5 HPD-C3 DOBbedbug
16.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 1S, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 18, 2024 · #1S · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1S, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 18, 2024 · #1S · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 6SQ.FT, AND WEST WALL APPROX 6SQ.FT IN THE BATHROOM LOCATED AT APT 1S, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 18, 2024 · #1S · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 16 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT 1S, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Jan 28, 2024 · #1S · DEFECT LETTER ISSUED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1S, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Jan 28, 2024 · #1S · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1S, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Jan 28, 2024 · #1S · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR WEST AT SOUTH SECTION AT PUBLIC HALL
    Jan 28, 2024 · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICKSTAND AT VESTIBULE DOOR AT PUBLIC HALL
    Jan 28, 2024 · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL
    Jan 22, 2022 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER-PLATE FOR ELECTRICAL LIGHT SWITCH AT SOUTH WALL ABOVE COUNTERTOP IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, APARTMENT AT EAST
    Dec 11, 2019 · #3C · NOV SENT OUT
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES NO GAS SUPPLY FOR COOKING AT RANGE IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 5, 2019 · #2A · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Feb 20, 2019 · NOT COMPLIED WITH
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Feb 20, 2019 · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Feb 20, 2019 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Feb 20, 2019 · NOT COMPLIED WITH
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Feb 20, 2019 · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Feb 20, 2019 · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Feb 20, 2019 · VIOLATION CLOSED
  • B
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING & EAST WALL (APPROX. 3 SQ. FT.) IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Feb 21, 2014 · #6E · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Feb 21, 2014 · #6E · NOV SENT OUT
  • B
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING, NORTH WALL, & EAST WALL (APPROX. 10 SQ. FT.) IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Feb 21, 2014 · #6E · NOV SENT OUT
  • A
    SECTION 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT WEST SIDE OF BUILDING AT 1st FIRE ESCAPE FROM NORTH
    Feb 9, 2014 · NOV SENT OUT
  • B
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT EAST WALL (APPROXIMATELY 4 SQUARE FEET) IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
    Jun 30, 2013 · #2C · VIOLATION CLOSED
  • C
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
    Jun 30, 2013 · #2C · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH AND EAST WALL IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
    Jun 30, 2013 · #2C · VIOLATION CLOSED
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
    Jun 30, 2013 · #2C · VIOLATION CLOSED
  • B
    SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH
    Jun 30, 2013 · #2C · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE FOYER LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 17, 2011 · #2C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE FOYER LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 17, 2011 · #2C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Mar 29, 2011 · #2C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE FOYER LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Mar 29, 2011 · #2C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Mar 29, 2011 · #2C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMPNESS PENETRATING CEILING AND WEST WALL IN THE FOYER LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM EAST AT SOUTH
    Mar 29, 2011 · #2C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMPNESS PENETRATING CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Mar 29, 2011 · #2C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    May 14, 2004 · #2E · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC-TILE AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    May 14, 2004 · #2E · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CERAMIC TILE BATHTUB 6 STY 2 FROM NORTHWEST APT 6B BATHROOM. LOCATED AT APT 6B
    Aug 11, 1988 · #6B · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE GROUT AROUND BATHTUB 6 STY 2 FROM NORTHWEST APT 6B BATHROOM. LOCATED AT APT 6B
    Aug 11, 1988 · #6B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SHUT OFF VALVES RADIATORS 6 STY 2 FROM NORTHWEST APT 6B THRU OUT. LOCATED AT APT 6B
    Aug 11, 1988 · #6B · NOV SENT OUT
  • B
    SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES 6 STY 2 FROM NORTHWEST APT 3B THRU OUT EAST SECTION. LOCATED AT APT 3B
    Aug 11, 1988 · #3B · NOV SENT OUT
DOB permits (last 30)
  • PL-
    DOMESSTIC PLUMBING
  • EQ-
    EVEREST SCAFFOLDING INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    INTER RENOVATION INC
  • OT-
    HALIOTIS CONSTRUCTION INC
  • PL-
    PARKSET PLUMBING COMPANY
  • BL-
    PARKSET PLUMBING COMPANY
  • FB-
    PARKSET PLUMBING COMPANY
  • FS-
    PARKSET PLUMBING COMPANY
  • OT-
    SKYLINE RESORATION INC
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    IRIS DEVELOPMENT CORPORATION
  • OT-
    MOHAMMAD WALAYAT
DOB violations
  • Feb 22, 2024FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Oct 18, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 18, 2013E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jun 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2009E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 13, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 13, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2007L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Aug 9, 2005E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2005E-ELEVATOR ELEVATORREQUIRED
  • Nov 10, 2003C-CONSTRUCTION OTHER OPTIONAL
  • Sep 4, 2002E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2002E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2002L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Oct 30, 2001E-ELEVATOR ELEVATORREQUIRED
  • Oct 30, 2001E-ELEVATOR ELEVATORREQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 1, 2000E-ELEVATOR ELEVATORREQUIRED
  • Aug 1, 2000E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 1988E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Homecrest

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3068010001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Aug 10, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
13 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
50 violations in the current corpus · latest record Sep 24, 2024

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
25 violations in the current corpus · latest record Feb 22, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Homecrest market page.