CurbScoop
CurbScoopBuildingsGravesend1802 OCEAN PARKWAY

1802 OCEAN PARKWAY

Brooklyn· Gravesend· built 1926class D4BBL 3066810415

1802 OCEAN PARKWAY is a 113-unit building in Gravesend, Brooklyn, built in 1926.

8 units are on the market here right now.

City records show 8 DOB permits and 68 open violations on file.

Units (res)
113
Floors
6.0
Lot ft²
26,750 ft²
Bldg ft²
105,000 ft²
Assessed
$5.50M
DOF total
Comps L5y
0

Active sale listings (8)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1802 OCEAN PARKWAY #C9
Brooklyn · built 1926
Gravesend$193K$276700 ft²1 bd · 1 ba-129
235 HPD-C6 DOBbedbug
363.1Source
1802 OCEAN PARKWAY #F9
Brooklyn · built 1926
Gravesend$290K$414700 ft²1 bd · 1 ba-58
235 HPD-C6 DOBbedbug
363.1Source
1802 OCEAN PARKWAY #D18
Brooklyn · built 1926
Gravesend$399K-0 ft²2 bd · 1 ba-149
235 HPD-C6 DOBbedbug
363.1Source
1802 OCEAN PARKWAY #B9
Brooklyn · built 1926
Gravesend$299K$427700 ft²1 bd · 1 ba-82
235 HPD-C6 DOBbedbug
363.1Source
1802 OCEAN PARKWAY #B15
Brooklyn · built 1926
Gravesend$299K$427700 ft²1 bd · 1 ba-82
235 HPD-C6 DOBbedbug
363.1Source
1802 OCEAN PARKWAY #F7
Brooklyn · built 1926
Gravesend$299K$427700 ft²1 bd · 1 ba-82
235 HPD-C6 DOBbedbug
363.1Source
1802 OCEAN PARKWAY #B7
Brooklyn · built 1926
Gravesend$299K$427700 ft²1 bd · 1 ba-82
235 HPD-C6 DOBbedbug
363.1Source
1802 OCEAN PARKWAY #F15
Brooklyn · built 1926
Gravesend$299K$427700 ft²1 bd · 1 ba-82
235 HPD-C6 DOBbedbug
363.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005, 2012 HMC & § 309 MDL: ABATE THE NUISANCE CONSISTING OF EXCESSIVE STORAGE OF MATERIAL CONSISTING OF BOXES AND HOUSEHOLD ITEMS IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Sep 11, 2026 · #D1 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT D1, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Sep 11, 2026 · #D1 · VIOLATION OPEN
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Sep 11, 2026 · #D1 · VIOLATION OPEN
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Sep 11, 2026 · #D1 · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Sep 11, 2026 · #D1 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELECTRICAL OUTLET AT SOUTH WALL IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Sep 11, 2026 · #D1 · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Sep 11, 2026 · #D1 · VIOLATION OPEN
  • B
    § 27-2033.3(E) CORRECT FAILURE TO MAINTAIN REQUIRED RECORDS REGARDING INTERNET CAPABLE TEMPERATURE REPORTING DEVICES AND SUBMIT SUCH RECORDS TO THE DEPARTMENT UPON REQUEST. DATA REQUESTED FOR THE PERIOD OF APRIL 2026
    Jul 9, 2026 · VIOLATION OPEN
  • B
    § 27-2033.3(E) CORRECT FAILURE TO MAINTAIN REQUIRED RECORDS REGARDING INTERNET CAPABLE TEMPERATURE REPORTING DEVICES AND SUBMIT SUCH RECORDS TO THE DEPARTMENT UPON REQUEST. DATA REQUESTED FOR THE PERIOD OF MAY 2026
    Jul 9, 2026 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BULKHEAD DOOR AT WEST SECTION , 6th STORY
    May 22, 2026 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT C11, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
    May 22, 2026 · #C11 · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASTELINE UNDERNEATH THE SINK IN THE KITCHEN LOCATED AT APT E19, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
    May 21, 2026 · #E19 · VIOLATION OPEN
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT SOUTH WALL IN THE BATHROOM LOCATED AT APT E19, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
    May 21, 2026 · #E19 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TRIM AT 2ND WINDOW FROM EAST AT SOUTH IN THE 5th ROOM FROM NORTH LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT E19, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
    May 21, 2026 · #E19 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TRIM AT DOOR IN THE ENTRANCE LOCATED AT APT E19, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
    May 21, 2026 · #E19 · VIOLATION OPEN
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER WINDOW SASH AT FIRE ESCAPE WINDOW IN THE 5th ROOM FROM NORTH LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT E19, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
    May 21, 2026 · #E19 · VIOLATION OPEN
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE VESTIBULE AT PUBLIC HALL, 1st STORY
    May 21, 2026 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ROOM ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT E19, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
    May 21, 2026 · #E19 · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT THE CEILING IN THE KITCHEN LOCATED AT APT E19, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
    May 21, 2026 · #E19 · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WINDOW RECESS AT 2ND WINDOW FROM EAST AT SOUTH IN THE 5th ROOM FROM NORTH LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR UNKEYED PLASTER AT THE CEILING IN THE BATHROOM LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT D17, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 21, 2026 · #D17 · VIOLATION OPEN
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT E19, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
    May 21, 2026 · #E19 · VIOLATION OPEN
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL WALL IN THE 2nd PRIVATE HALLWAY LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st DOOR FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE 2nd PRIVATE HALLWAY LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER PLATE FOR ELECTRIC OUTLET AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL WALL, NORTH WALL, EAST WALL, SOUTH WALL, WEST WALL, CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st DOOR FRAME FROM WEST AT NORTH WALL, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT B17, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 19, 2026 · #B17 · VIOLATION OPEN
DOB permits (last 30)
  • PL-
    JOSEPH FERRIGNO PLUMBING/HEATING
  • FS-
    STAR INDUSTRIAL SERVICE CO INC
  • EQ-
    J & G GNRL CONTRACT INC
  • OT-
    MASCON RESTORATION LLC
  • OT-
    GOLDEN EAGLE CONSTRUCTION CO.
  • OT-
    FAST TRACK ELECTRIC CORP
  • PL-
  • EQ-
    J & G GNRL CONTRACT CORP
DOB violations
  • May 3, 2023BENCH-FAILURE TO BENCHMARK NONE
  • Apr 13, 2022AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Oct 9, 2021E-ELEVATOR ELEVATORREQUIRED
  • Apr 14, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2018E-ELEVATOR ELEVATORREQUIRED
  • Dec 21, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 21, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2009E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 24, 2008E-ELEVATOR ELEVATORREQUIRED
  • Nov 24, 2008E-ELEVATOR ELEVATORREQUIRED
  • Nov 7, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 7, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jul 26, 2000E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 16, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 1, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Apr 25, 1991LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Nov 21, 1988E-ELEVATOR ELEVATORREQUIRED
  • Nov 21, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Gravesend

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3066810415

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
8 active sale listings in the current corpus · latest record Jul 4, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
8 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
955 violations in the current corpus · latest record Sep 11, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
28 violations in the current corpus · latest record Jun 29, 2023

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Gravesend market page.