CurbScoop
CurbScoopBuildingsBay Ridge6801 SHORE ROAD

6801 SHORE ROAD

Brooklyn· Bay Ridge· built 1952class D4BBL 3058590015
Open listing source

6801 SHORE ROAD is a 106-unit building in Bay Ridge, Brooklyn, built in 1952.

3 units are on the market here right now.

City records show 20 DOB permits and 80 open violations on file.

Units (res)
106
Floors
6.0
Lot ft²
33,450 ft²
Bldg ft²
109,620 ft²
Assessed
$5.20M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
6801 SHORE ROAD #5B
Brooklyn · built 1952
Bay Ridge$449K$619725 ft²1 bd · 1 ba-161
8 HPD-C18 DOBbedbug
28.9Source
6801 SHORE ROAD #2N
Brooklyn · built 1952
Bay Ridge$290K$446650 ft²1 bd · 1 ba-271
8 HPD-C18 DOBbedbug
28.9Source
6801 SHORE ROAD #5U
Brooklyn · built 1952
Bay Ridge$499K$4991,000 ft²2 bd · 1 ba-280
8 HPD-C18 DOBbedbug
28.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CORRODED STEEL LINTEL ,1ST WINDOW FROM EAST AT FRONT AREAWAY, 3rd STORY, SECTION ''NORTHEST ''
    Apr 3, 2022 · VIOLATION DISMISSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · NOV CERTIFIED LATE
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · VIOLATION DISMISSED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE FOYER LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVER AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 3, 2022 · #3D · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REPLACE WITH STANDARD WIRE GLASS THE PRESENT GLASS AT LOWER SASH WINDOW AT EAST WALL NEXT TO THE MAIL BOX AT PUBLIC HALL, 1st STORY
    Feb 3, 2021 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REFIT DOOR IN THE ENTRANCE LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 14, 2019 · #1L · INVALID CERTIFICATION
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 14, 2019 · #1L · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX. 10 SQ. FEET AND EAST WALL APPRX. 5 SQ. FEET IN THE 1st ROOM FROM EAST LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 29, 2019 · #6L · VIOLATION CLOSED
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX. 10 SQ. FEET AND EAST WALL APPRX. 5 SQ. FEET IN THE 1st ROOM FROM EAST LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 13095635 ISSUED 29-MAY-19 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE §27-2017.3a(5)(a) or (b).
    May 29, 2019 · #6L · INVALID CERTIFICATION
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 29, 2019 · #6L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING , EAST AND NORTH WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 29, 2019 · #6L · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 29, 2019 · #6L · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 29, 2019 · #6L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1L, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    May 8, 2019 · #1L · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Apr 26, 2019 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''L-U'', AT EAST
    Apr 26, 2019 · #6L · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Apr 26, 2019 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Apr 26, 2019 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Apr 26, 2019 · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK THROUGH CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 18, 2019 · #6L · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING ON WALL AT PUBLIC HALL, 1st STORY
    Apr 18, 2019 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 18, 2019 · #6L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 13, 2019 · #6L · CERTIFICATION POSTPONMENT GRANTED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6L, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 13, 2019 · #6L · CERTIFICATION POSTPONMENT DENIED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, CEILING, EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''1'', 1st FROM WEST AT NORTH
    Dec 3, 2018 · #3D · NOV SENT OUT
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''1'', 1st FROM WEST AT NORTH
    Dec 3, 2018 · #3D · NOV SENT OUT
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 3;
    Dec 3, 2018 · VIOLATION DISMISSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''1'', 1st FROM WEST AT NORTH
    Dec 3, 2018 · #3D · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''1'', 1st FROM WEST AT NORTH
    Dec 3, 2018 · #3D · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL, CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''1'', 1st FROM WEST AT NORTH
    Dec 3, 2018 · #3D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''1'', 1st FROM WEST AT NORTH
    Dec 3, 2018 · #3D · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL, CEILING, EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''1'', 1st FROM WEST AT NORTH
    Dec 3, 2018 · #3D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2T, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 19, 2018 · #2T · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Oct 19, 2018 · NOV SENT OUT
DOB permits (last 30)
  • PL-
    CAPE PLUMBING INC
  • OT-
    DEJESUS STUCCO & GENERAL
  • OT-
    PHOENIX COMBUSTION CORP
  • BL-
    ABILENE INC
  • FB-
    ABILENE INC.
  • FS-
    ABILENE INC
  • PL-
    BMC PLG CORP
  • OT-
    GC SOLUTIONS NY INC
  • OT-
    MOHAMMED INAYAT
  • SP-
    NATIONAL PLBGING AND HEATING COR
  • OT-
    WINDHAM RESTORATION CORP
  • EQ-
    POWERS BRIDGING & SCAFF
  • OT-
    GC SOLUTIONS NY INC
  • SP-
    CROOM PLUMBING & HEATING CORP.
  • OT-
    MEGNA HOME IMPROVEMENTS
  • OT-
    MOHAMMED INAYAT
  • EQ-
    PARSONS CONSTRUCTION INC
  • SP-
    SPARCO PLBG & HTG CORP
  • EQ-
    POWERS BRIDGING & SCAFFOL
  • OT-
    BILTMORE GENERAL CONST.
DOB violations
  • Apr 13, 2020E-ELEVATOR ELEVATORREQUIRED
  • Apr 13, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 11, 2017C-CONSTRUCTION OTHER OPTIONAL
  • Dec 1, 2016EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Dec 1, 2016EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jun 1, 2016EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED
  • Jun 1, 2016EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED
  • Apr 29, 2016E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2016E-ELEVATOR ELEVATORREQUIRED
  • Nov 2, 2015BENCH-FAILURE TO BENCHMARK NONE
  • Oct 1, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 1, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 1, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2015BENCH-FAILURE TO BENCHMARK NONE
  • Jun 10, 2015EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jun 10, 2015EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • May 2, 2015BENCH-FAILURE TO BENCHMARK NONE
  • Sep 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 1, 2014BENCH-FAILURE TO BENCHMARK NONE
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jul 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Dec 19, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 19, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Oct 8, 2010VCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jun 7, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Apr 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 21, 2008LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 6, 2006LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Bay Ridge

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3058590015

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jul 27, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
20 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
46 violations in the current corpus · latest record Aug 5, 2022

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
47 violations in the current corpus · latest record Sep 1, 2020

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Bay Ridge market page.