CurbScoop
CurbScoopBuildingsFlatbush330 LENOX ROAD

330 LENOX ROAD

Brooklyn· Flatbush· built 1964class D4BBL 3048530035
Open listing source

330 LENOX ROAD is a 118-unit building in Flatbush, Brooklyn, built in 1964.

1 unit is on the market here right now.

City records show 15 DOB permits and 80 open violations on file.

Units (res)
118
Floors
6.0
Lot ft²
30,025 ft²
Bldg ft²
112,518 ft²
Assessed
$4.72M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
330 LENOX ROAD #4E
Brooklyn · built 1964
Flatbush$425K$451942 ft²1 bd · 1 ba-47
41 HPD-C21 DOBbedbug
79.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE KITCHEN LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    May 21, 2026 · #LL2 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE 4th ROOM FROM EAST LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    May 21, 2026 · #LL2 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    May 21, 2026 · #LL2 · VIOLATION OPEN
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 31, 2026 · #LL2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 12, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 12, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 12, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 12, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 12, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 12, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT LL2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 12, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE FOYER LOCATED AT BSMT-APT LL2, 1st BSMT-APT FROM WEST AT NORTH
    Aug 30, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE 2nd BEDROOM FROM EAST AT NORTH LOCATED AT BSMT-APT LL2
    Aug 30, 2025 · #LL2 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 1, 2025 · #3E · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 1, 2025 · #3E · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, SOUTH AND WEST WALLS IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 1, 2025 · #3E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVER AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 1, 2025 · #3E · NOT COMPLIED WITH
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 1, 2025 · #3E · NOT COMPLIED WITH
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK STAND INSTALLED AT LUNDRY ROOM DOOR AT LAUNDRY ROOM, 2nd STORY
    May 1, 2025 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR DOOR AT COMPACTOR CLOSET, 2nd STORY
    May 1, 2025 · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE OVEN DOOR AT RANGE IN THE KITCHEN LOCATED AT APT 3T, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 5, 2024 · #3T · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3T, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 5, 2024 · #3T · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT FIRE ESCAPE WINDOW IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3T, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 5, 2024 · #3T · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASH BASIN CABINET IN THE BATHROOM LOCATED AT APT 3T, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 5, 2024 · #3T · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3T, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 5, 2024 · #3T · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR AT PUBLIC HALL, 3rd STORY
    Jun 5, 2024 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE AT LAUNDRY ROOM, 6th STORY
    Mar 19, 2024 · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK STAND AT BOILER ROOM AT BASEMENT STORY
    Mar 19, 2024 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 1SQFT WOODEN BASEBOARD IN THE KITCHEN LOCATED AT APT 2K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 6, 2023 · #2K · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... OBSERVED APPROX 2SQFT OF MOLD AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 6, 2023 · #2A · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR APPROX 3SQFT AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 6, 2023 · #2A · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... OBSERVED APPROX 2SQFT OF MOLD AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16143595 ISSUED 06-AUG-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Aug 6, 2023 · #2A · DEFECT LETTER ISSUED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 14, 2022 · #4H · NOTICE OF ISSUANCE SENT TO TENANT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Jul 21, 2020 · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT BSMT-APT LL1, 1st BSMT-APT FROM EAST AT SOUTH
    Feb 17, 2020 · #LL1 · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APROX = 12 SQ FT IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT BSMT-APT LL1, 1st BSMT-APT FROM EAST AT SOUTH
    Feb 17, 2020 · #LL1 · VIOLATION CLOSED
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APROX = 12 SQ FT IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT BSMT-APT LL1, 1st BSMT-APT FROM EAST AT SOUTH ORIGINAL VIOLATION 13606753 ISSUED 17-FEB-20 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE §27-2017.3a(5)(a) or (b).
    Feb 17, 2020 · #LL1 · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT BSMT-APT LL1, 1st BSMT-APT FROM EAST AT SOUTH
    Feb 17, 2020 · #LL1 · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT LL1, 1st BSMT-APT FROM EAST AT SOUTH
    Feb 17, 2020 · #LL1 · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT LL1, 1st BSMT-APT FROM EAST AT SOUTH
    Feb 17, 2020 · #LL1 · NOV SENT OUT
DOB permits (last 30)
  • OTJan 4, 2002
    STAR INDUSTRIAL SERVICES CO INC
  • FS-
    STAR INDUSTRIAL SERVICES CO INC
  • OT-
    DIRECT CONTRACTING INC
  • OT-
    EMPIRE REST & MGMT CORP
  • BL-
    POSITIVE PLUMBING & HEATING CORP
  • FB-
    POSITIVE PLUMBING & HEATING CORP
  • PL-
    POSITIVE PLUMBING & HEATING CORP
  • OT-
    STAR INDUSTRIAL SERVICES CO INC
  • OT-
    DIRECT CONTRACTING CORP.
  • OT-
    INTER RENOVATION INC
  • OT-
    INTER RENOVATION INC
  • OT-
    CALELLA CONSTRUTION CORP.
  • MH-
    CASELLA CONSTRUCTON CORP.
  • OT-
    INTER RENOVATION INC
  • FS-
    POSITIVE PLUMBING & HEATING CORP
DOB violations
  • Jun 23, 2024EARCX-FAILURE TO SUBMIT EER NONE
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Feb 18, 2019FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Mar 21, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 4, 2016E-ELEVATOR ELEVATORREQUIRED
  • Dec 4, 2016E-ELEVATOR ELEVATORREQUIRED
  • Dec 6, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 6, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2013EARCX-FAILURE TO SUBMIT EER NONE
  • Nov 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 16, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 26, 2010E-ELEVATOR ELEVATORREQUIRED
  • May 26, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 31, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 27, 2008E-ELEVATOR ELEVATORREQUIRED
  • Oct 27, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 1, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2007LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 6, 2006LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Dec 3, 2004E-ELEVATOR ELEVATORREQUIRED
  • Dec 3, 2004E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2004LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 2, 2003E-ELEVATOR ELEVATORREQUIRED
  • Jun 2, 2003E-ELEVATOR ELEVATORREQUIRED
  • Mar 19, 2003LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 25, 2002C-CONSTRUCTION OTHER OPTIONAL
  • Apr 10, 2002E-ELEVATOR ELEVATORREQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 7, 2000LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Flatbush

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 9, 2026

Stable property ID: nyc:bbl:3048530035

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 20, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 9, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
15 permits in the current corpus · latest record Jan 4, 2002

Pipeline completed Sep 9, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
236 violations in the current corpus · latest record May 21, 2026

Pipeline completed Sep 9, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
50 violations in the current corpus · latest record Jun 23, 2024

Pipeline completed Sep 9, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Flatbush market page.