CurbScoop
CurbScoop›Buildings›Bushwick›1408 BUSHWICK AVENUE

1408 BUSHWICK AVENUE

Brooklyn· Bushwick· built 1925class C1BBL 3034380042

1408 BUSHWICK AVENUE is an 8-unit building in Bushwick, Brooklyn, built in 1925.

CurbScoop has 1 recorded sale on this tax lot, most recently $1.15M on Aug 5, 2026.

1 of those closed in the last five years, at a median of $1.15M.

1 unit is on the market here right now.

City records show 6 DOB permits and 53 open violations on file.

Units (res)
8
Floors
4.0
Lot ft²
1,575 ft²
Bldg ft²
5,040 ft²
Assessed
$527K
DOF total
Comps L5y
1
median $1.15M

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1408 BUSHWICK AVENUE #MULTI-FAMILY
Brooklyn · built 1925
Bushwick$1.40M-0 ft²16 bd · 8 ba+21.3%275
60 HPD-C8 DOBbedbugrodent
123.4Source

Transaction history (1)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
Aug 19, 2026-DEED$1.15M

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    May 4, 2026 · NOV SENT OUT
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AT PUBLIC HALL, 2nd STORY
    Mar 27, 2026 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 4th STORY
    Feb 9, 2026 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 2nd STORY
    Feb 9, 2026 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 1st STORY
    Feb 9, 2026 · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 18, 2025 · VIOLATION DISMISSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL WALL IN THE FOYER LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 25, 2025 · #2R · DEFECT LETTER ISSUED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL, 1st CLOSET FROM SOUTH AT WEST WALL CEILING IN THE FOYER LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 25, 2025 · #2R · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW AT WEST WALL IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 20, 2025 · #2R · NOV SENT OUT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 20, 2025 · #2R · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING IN THE FOYER LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 20, 2025 · #2R · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN CLOSET AT NKRTH WALL IN THE FOYER LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 20, 2025 · #2R · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT WALL CABINET DOOR AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 20, 2025 · #2R · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE FOYER LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 20, 2025 · #2R · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY
    Jul 8, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORY
    Jul 8, 2024 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY
    Jun 18, 2024 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORY
    Jun 18, 2024 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE DOOR , 1st STORY
    May 8, 2024 · NOV SENT OUT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 8, 2024 · #2R · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT VESTIBULE DOOR , 1st STORY
    May 8, 2024 · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 9, 2024 · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 2, 2024 · #2R · NOTICE OF ISSUANCE SENT TO TENANT
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 2, 2024 · #2R · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 2, 2024 · #2R · NOV SENT OUT
  • B
    § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FRONT YARD
    Mar 2, 2024 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SUBFLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 2, 2024 · #2R · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SUBFLOOR NEAR BATHROOM IN THE PRIVATE HALLWAY LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 2, 2024 · #2R · NOV SENT OUT
  • C
    SECTION 27-2005, 2044 HMC:PROVIDE APPROVED ONE-HOUR FIRE RESISTANCE RATED SELF-CLOSING DOOR AT ALL OPENINGS TO PUBLIC HALL, OTHER THAN APARTMENT MAIN ENTRANCE DOOR FIRE DOOR AT NORTH AT PUBLIC HALL, 4th STORY
    Dec 4, 2023 · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 4, 2023 · #4R · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 4, 2023 · #4R · NOV SENT OUT
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FREE STANDING RADIATOR AT PUBLIC HALL, 2nd STORY
    Dec 4, 2023 · VIOLATION CLOSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 25, 2023 · #2F · NOV SENT OUT
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT 1ST STORY PUBLIC HALL TO BASEMENT
    Nov 25, 2023 · NOV SENT OUT
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 24, 2023 · #4R · NOV SENT OUT
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
    Nov 24, 2023 · NOV SENT OUT
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 24, 2023 · #4R · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LEADING TO BOILER ROOM LOCKED AT PUBLIC HALL, 1ST STORY AT BOILER ROOM
    Nov 20, 2023 · NOV SENT OUT
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 2nd ROOM FROM EAST LOCATED AT APT 3F , 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 20, 2023 · #3F · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE W00DEN FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 6, 2023 · #2R · NOV SENT OUT
DOB permits (last 30)
  • General ConstructionMay 2, 2022
    SPLEN CONSTRUCTION INC
  • OT-
    COS CONSTRUCTION INC
  • PL-
    VILLAGE P & H NY INC
  • OT-
    SMVP MGMT INC
  • PL-
    TOP PLUMBING GROUP,INC
  • OT-
    SAFETY PRO CONSTRUCTION
DOB violations
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 23, 2024LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 1, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 19, 2003LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 1, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 16, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 1, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Bushwick

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:3034380042

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Oct 28, 2025

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
1 recorded deed in the current corpus · latest record Aug 19, 2026

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
6 permits in the current corpus · latest record Jun 6, 2022

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
246 violations in the current corpus · latest record Jul 6, 2026

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
13 violations in the current corpus · latest record Nov 14, 2025

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Bushwick market page.