205 WILSON AVENUE
Brooklyn· built 1931class C2BBL 3032570003
Units (res)
6
Floors
3.0
Lot ft²
2,500 ft²
Bldg ft²
4,875 ft²
Assessed
$603K
DOF total
Comps L5y
2
median $7.56M
Transaction history (2)
Every recorded deed for this tax lot.
| Recorded | Unit | Type | Price |
|---|---|---|---|
| May 29, 2026 | - | DEED | $7.56M |
| May 29, 2026 | - | DEED | $21 |
Building risk + activity
HPD violations (last 40)
- C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTDec 10, 2025 · #1B · VIOLATION DISMISSED
- B§ 27-2005 HMC: REFIT BOTTOM OF VESTIBULE DOORDec 11, 2024 · VIOLATION DISMISSED
- I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.Nov 14, 2022 · VIOLATION DISMISSED
- A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILE IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTHJul 27, 2021 · #1A · VIOLATION DISMISSED
- C§ 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT ENTRANCE LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTHJul 27, 2021 · #1A · VIOLATION CLOSED
- A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYMar 1, 2020 · VIOLATION CLOSED
- C§ 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT VESTIBULE AT PUBLIC HALL, 1st STORYMar 1, 2020 · VIOLATION CLOSED
- C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 1, 2018 · #1B · VIOLATION CLOSED
- A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 1, 2018 · #1B · VIOLATION DISMISSED
- C§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 1, 2018 · #1B · VIOLATION CLOSED
- B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 1, 2018 · #1B · VIOLATION DISMISSED
- B§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 1A, 1st STORY, APARTMENT AT NORTHSep 26, 2014 · #1A · VIOLATION DISMISSED
- B§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 1A, 1st STORY, APARTMENT AT NORTHSep 26, 2014 · #1A · VIOLATION DISMISSED
- A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION BASE RADIATOR IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, APARTMENT AT SOUTHMay 23, 2014 · #1B · VIOLATION DISMISSED
- B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, APARTMENT AT SOUTHMay 23, 2014 · #1B · VIOLATION CLOSED
- B§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS INCANDESCENT LIGHT REQUIRED; LIGHT FIXTURE PRESENT. AT FRONT AREAWAYMay 15, 2014 · VIOLATION CLOSED
DOB permits (last 30)
- PLApr 22, 1998F&G PLUMBINGH AND HEATING CORP
- BL-BONAFIDE F.O. CO. INC.
- FB-BONAFIDE F.O. CO. INC.
- PL-F&G PLUMBINGH AND HEATING CORP
- EQ-CHEEVER DEVELOPMENT CORP.
- AL-CHEEVER DEVELOPMENT CORP
- EQ-CHEEVER DEVELOPMENT CORP.
- EQ-CHEEVER DEVELOPMENT CORP.
- MH-MASCON RESTORATION INC.
- OT-MASCON RESTORATION INC.
- MH-D/B/A B & A GENERAL CONTRACTING
- OT-D/B/A B & A GENERAL CONTRACTING
- AL-CHEEVER DEVELOPMENT CORP