CurbScoop
CurbScoopBuildingsBushwick68 BEAVER STREET

68 BEAVER STREET

Brooklyn· Bushwick· built 2007class RMBBL 3031377501

68 BEAVER STREET is an 88-unit building in Bushwick, Brooklyn, built in 2007.

1 unit is on the market here right now.

City records show 5 DOB permits and 59 open violations on file.

Units (res)
88
Floors
7.0
Lot ft²
16,150 ft²
Bldg ft²
138,761 ft²
Assessed
$12.1M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
86 BEAVER STREET #3G
Brooklyn · built 2007
Bushwick$450K$513877 ft²2 bd · 1 ba-75
23 HPD-C6 DOBbedbug
43.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Dec 5, 2025 · #2B · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Dec 5, 2025 · #2B · NOV SENT OUT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Dec 5, 2025 · #2B · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT B3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Dec 1, 2025 · #B3B · NOV SENT OUT
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
    Dec 1, 2025 · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 13, 2025 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR WALKING AREA IN THE FOYER LOCATED AT APT 6F, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    May 5, 2025 · #6F · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT BUILDING FRONT TO RETURN BUZZER AT EAST WALL IN THE FOYER LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 16, 2024 · #6F · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Dec 16, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Nov 17, 2024 · #2B · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Nov 17, 2024 · #2B · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Nov 17, 2024 · #2B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR WALKING AREA IN THE 4th ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR WALKING AREA IN THE 1st ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT DOOR AT COMPACTOR CLOSET, 6th STORY
    Apr 29, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
    Apr 29, 2024 · #6D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILINGAND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
    Apr 29, 2024 · #6D · NOV SENT OUT
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT CERAMIC TILES AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BROKEN GLASS PANE AT UPPER SASH WINDOW IN THE 4th ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
    Apr 29, 2024 · #6D · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 17, 2024 · VIOLATION DISMISSED
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE THE VISIBLE BLACK STAIN OFF THE CERAMIC TILE JOINTS AND COULKING ON THE WALLS AROUND THE. BATHTUB IN THE 1st BATHROOM FROM EAST LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2024 · #6F · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2024 · #6F · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2024 · #6F · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE (BLINKING) ELECTRICAL LIGHT FIXTURE AT THE CEILING IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2024 · #6F · VIOLATION CLOSED
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE (INOPERATIVE) MORTISE LOCK ON THE DOOR IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2024 · #6F · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2024 · #6F · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 25, 2024 · #2A · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT COMPACTOR CLOSET, 6th STORY
    Jan 25, 2024 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 25, 2024 · #2A · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT COMPACTOR DOOR AT COMPACTOR CLOSET, 6th STORY
    Jan 25, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CELLING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 25, 2024 · #2A · NOV SENT OUT
DOB permits (last 30)
  • OT-
    ZAMAN CONSTRUCTION CORP
  • EQ-
    ROCK GROUP NY CORP
  • EQ-
    1 R.S. CORP
  • OT-
    ZAMAN CONSTRUCTION CORP
  • OT-
    ZAMAN CONSTRUCTION CORP
DOB violations
  • Oct 8, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 19, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 18, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 17, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Dec 9, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 30, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 30, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2013BENCH-FAILURE TO BENCHMARK NONE
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Jan 1, 2012BENCH-FAILURE TO BENCHMARK NONE

More buildings in Bushwick

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 9, 2026

Stable property ID: nyc:bbl:3031377501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Mar 29, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 9, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
5 permits in the current corpus

Pipeline completed Sep 9, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
84 violations in the current corpus · latest record Jan 14, 2026

Pipeline completed Sep 9, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
19 violations in the current corpus · latest record Jun 10, 2022

Pipeline completed Sep 9, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Bushwick market page.