CurbScoop
CurbScoopBuildingsGREENPOINT29 HURON STREET

29 HURON STREET

Brooklyn· GREENPOINT· built 2020BBL 3025200001

29 HURON STREET is a condo building in GREENPOINT, Brooklyn, built in 2020.

1 unit is on the market here right now.

City records show 10 DOB permits and 29 open violations on file.

Units (res)
-
Floors
-
Lot ft²
-
Bldg ft²
-
Assessed
-
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
29 HURON STREET #9FE
Brooklyn · built 2020
GREENPOINT$2.55M$1,8531,376 ft²3 bd · 2 ba-43
17 DOB
8.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
None.
DOB permits (last 30)
  • DM-
    XOLLE DEMO LLC
  • SD-
    METRO FIRE PROTECTION INC
  • SD-
    METRO FIRE PROTECTION INC
  • BL-
    FORWARD MECHANICAL CORP
  • OT-
    LEEDING BUILDERS GROUP LL
  • BL-
    FORWARD MECHANICAL CORP
  • SD-
    METRO FIRE PROTECTION INC
  • PL-
    ENOBRAC PLUMBING, INC
  • PL-
    ENOBRAC PLUMBING, INC
  • MH-
    DEVEN LITHOGRAPHERS INC.
DOB violations
  • Jun 5, 2023C-CONSTRUCTION OTHER OPTIONAL
  • Jun 5, 2023C-CONSTRUCTION OTHER OPTIONAL
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Feb 16, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Feb 2, 2018BENCH-FAILURE TO BENCHMARK NONE
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 2, 2017BENCH-FAILURE TO BENCHMARK NONE
  • Sep 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2017BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2017BENCH-FAILURE TO BENCHMARK NONE
  • Dec 1, 2016EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jun 3, 2013BENCH-FAILURE TO BENCHMARK NONE
  • Oct 1, 2012EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Jan 1, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Dec 13, 2011EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Oct 8, 2010VCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 25, 2009E-ELEVATOR ELEVATORREQUIRED
  • Feb 27, 2009LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Oct 17, 2008E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2008LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Apr 2, 2007LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Nov 15, 2006E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2005LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Nov 19, 2004LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Mar 28, 2001E-ELEVATOR ELEVATORREQUIRED
  • Jul 26, 1990E-ELEVATOR ELEVATORREQUIRED

More buildings in GREENPOINT

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:3025200001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 5, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
10 permits in the current corpus

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
29 violations in the current corpus · latest record Feb 13, 2024

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the GREENPOINT market page.