CurbScoop
DealsBrooklyn122 ASHLAND PLACE

122 ASHLAND PLACE

Brooklyn· Downtown Brooklyn· built 1958class D4BBL 3020610040
Open listing source
Units (res)
184
Floors
15.0
Lot ft²
77,523 ft²
Bldg ft²
187,667 ft²
Assessed
$11.9M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
122 ASHLAND PLACE #12D
Brooklyn · built 1958
Downtown Brooklyn$649K-0 ft²1 bd · 1 ba-29
5 HPD-Cbedbug
13.9Source
122 ASHLAND PLACE #12L
Brooklyn · built 1958
Downtown Brooklyn$999K-0 ft²2 bd · 2 ba-36
5 HPD-Cbedbug
13.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS CEILING AND TRIMS IN THE KITCHEN LOCATED AT APT 6J, 6th STORY, 6th APARTMENT FROM SOUTH AT WEST
    Jul 24, 2025 · #6J · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6J, 6th STORY, 6th APARTMENT FROM SOUTH AT WEST
    Jul 24, 2025 · #6J · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT VESTIBULE ENTRANCE DOOR , 1st STORY
    Jul 21, 2025 · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Jul 21, 2025 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE MISSING AT 1ST FIRE DOOR FROM EAST AT PUBLIC HALL, 1st STORY
    Jul 21, 2025 · NOV SENT OUT
  • C
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES IN BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 6th APARTMENT FROM SOUTH AT WEST
    May 15, 2025 · #6J · NOV SENT OUT
  • C
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES IN BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 6th APARTMENT FROM SOUTH AT WEST
    May 15, 2025 · #6J · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT LUNDRY ROOM DOOR AT LAUNDRY ROOM
    Apr 3, 2025 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 12L, 12th STORY, 4th APARTMENT FROM WEST AT NORTH
    Apr 6, 2024 · #12L · NOV SENT OUT
  • A
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 12L, 12th STORY, 4th APARTMENT FROM WEST AT NORTH
    Apr 6, 2024 · #12L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 12L, 12th STORY, 4th APARTMENT FROM WEST AT NORTH
    Apr 6, 2024 · #12L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd BATHROOM FROM NORTH AT CENTER LOCATED AT APT 12L, 12th STORY, 4th APARTMENT FROM WEST AT NORTH
    Apr 6, 2024 · #12L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 12L, 12th STORY, 4th APARTMENT FROM WEST AT NORTH
    Apr 6, 2024 · #12L · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 12L, 12th STORY, 4th APARTMENT FROM WEST AT NORTH
    Apr 6, 2024 · #12L · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT CLOSET DOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 12L, 12th STORY, 4th APARTMENT FROM WEST AT NORTH
    Apr 6, 2024 · #12L · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 21, 2023 · VIOLATION DISMISSED
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WINDOW OPENINGS SEALED WITH MASONRY NORTHWEST & SOUTHWEST AT NORTH.
    Sep 20, 1999 · NOV SENT OUT
DOB permits (last 30)
  • MHJul 29, 2003
    ACE INSTALLERS CORP
  • OTJul 29, 2003
    ACE INSTALLERS CORP
  • OT-
    MODERN CONCEPTS RENOV INC
  • AL-
    UNIVERS. TOWER ASSOC.DBA ROTHER.
  • PL-
    STELLMAR PLG MECH CORP
  • EQ-
    ROCKLEDGE SCAFFOLD CORP
  • EQ-
    DJM RESTORATION INC
  • OT-
    SIBRIZZI FUEL OIL
  • FS-
    SIBRIZZI FUEL OIL
  • OT-
    UNIVERSITY TOWERS ASSOC.
  • EQ-
    ROCKLEDGE SCAFFOLD CORP
  • OT-
    DJM RESTORATION INC
  • OT-
    UNIVERSITY TOWERS ASSOC
  • OT-
    INTEGRATED CONST SVCS INC
  • OT-
    HIGHRISE CONSTRUCTION
  • OT-
    ACE INSTALLERS CORP
  • MH-
    ACE INSTALLERS CORP
  • OT-
    INTEGRATED CONST SVCS INC
  • OT-
    UNIVERSITY TOWERS ASSOC
  • EQ-
    DORIEL SCAFFOLDING INC
  • EQ-
    DORIEL SCAFFOLDING INC
  • OT-
    HIGHRISE CONSTRUCTION
  • OT-
    H CONRACTING CORP
  • OT-
    INTEGRATED CONST SVCS INC
  • EQ-
    XINOS CONSTRUCTION CORP
  • PL-
    GEORGE BASSOLINO PLUMBING
  • FB-
    EFFICIENT COMB&COOLING CO
  • FS-
    EFFICIENT COMB&COOLING CO
  • OT-
    SCHNELL CONTRACTING SERVICES L
  • PL-
    STELLMAR PLUMBING & MECH CORP.