493 HANCOCK STREET
Brooklyn· built 2004class A5BBL 3016540048
Units (res)
1
Floors
3.0
Lot ft²
1,800 ft²
Bldg ft²
3,423 ft²
Assessed
$84K
DOF total
Comps L5y
1
median $2.40M
Transaction history (1)
Every recorded deed for this tax lot.
| Recorded | Unit | Type | Price |
|---|---|---|---|
| May 21, 2026 | - | DEED | $2.40M |
Building risk + activity
HPD violations (last 40)
- B§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORYJan 20, 2009 · #2FL · NOV SENT OUT
- B§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORYJan 20, 2009 · #2FL · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING BASEBOARD HEATER COVER AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORYJan 20, 2009 · #2FL · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORYJan 20, 2009 · #2FL · NOV SENT OUT
- B§ 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE UNDER SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORYOct 3, 2008 · #2 · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE OUTTER GLASS PANE AT WINDOW IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORYOct 3, 2008 · #2 · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORYOct 3, 2008 · #2 · NOV SENT OUT
- B§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... ON NORTH WALL APPOXIMATELY 25 SQ FT. IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORYOct 3, 2008 · #2 · NOV SENT OUT
- B§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 3, 2008 · #2 · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALL AND CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORYSep 12, 2008 · #2FL · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF WATER LEAK WHEN RAIN AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORYSep 12, 2008 · #2FL · NOV SENT OUT
- B§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORYSep 12, 2008 · #2FL · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE WHOLE SLIDING WINDOW IN SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2FL, 2nd STORYSep 12, 2008 · #2FL · NOV SENT OUT
- A§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORYSep 12, 2008 · #2FL · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJul 21, 2008 · #2FL · NOT COMPLIED WITH
- B§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJul 21, 2008 · #2FL · NOT COMPLIED WITH
- B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJul 21, 2008 · #2FL · NOT COMPLIED WITH
- B§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE GLASS PANE WINDOW IN THE 5th ROOM FROM NORTH LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJul 21, 2008 · #2FL · NOT COMPLIED WITH
DOB permits (last 30)
- EQ-ANJOS INTERNATIONAL CORP
- NB-ANJOS INTERNATIONAL CORP
- EQ-JETO GENERAL CONSTRUCTION
- NB-JETO GENERAL CONSTRUCTION
- PL-THE PLBG COPMPANY INC
- EQ-JR HOME CONSTRUCTION CORP.
- NB-JR HOME CONSTRUCTION CORP