554 4 AVENUE
Units (res)
40
Floors
11.0
Lot ft²
7,909 ft²
Bldg ft²
39,222 ft²
Assessed
$5.87M
DOF total
Comps L5y
0
Active sale listings (1)
| Address | Neighborhood | Price | $/ft² | Sqft | Beds/Baths | vs comp | DOM | Risk | Score | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 554 4 AVENUE #4D Brooklyn · built 2017 | Gowanus | $875K | $1,202 | 728 ft² | 1 bd · 1 ba | - | 55 | 6 HPD-Cbedbug | 12.4 | Source |
Transaction history (0)
Every recorded deed for this tax lot.
No recorded transactions for this BBL yet.
Building risk + activity
HPD violations (last 40)
- I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.Nov 19, 2025 · VIOLATION DISMISSED
- I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.Nov 26, 2024 · VIOLATION DISMISSED
- I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.Nov 20, 2023 · VIOLATION DISMISSED
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Mar 17, 2023 · VIOLATION DISMISSED
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Feb 18, 2022 · VIOLATION DISMISSED
- A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 SQ.FT AT PUBLIC HALL, 8th STORYSep 26, 2021 · VIOLATION CLOSED
- A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 SQ.FT AT PUBLIC HALL, 6th STORYSep 26, 2021 · VIOLATION CLOSED
- A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 2 SQ.FT AT PUBLIC HALL, 4th STORYSep 26, 2021 · VIOLATION CLOSED
- C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING ENTRANCE DOOR , 1st STORYSep 26, 2021 · NOV SENT OUT
- B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 SQ.FT AT PUBLIC HALL, 9th STORY ORIGINAL VIOLATION 14582815 ISSUED 26-SEP-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).Sep 26, 2021 · DEFECT LETTER ISSUED
- C§ 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT THE BUILDING ENTRANCE DOOR , 1st STORYSep 26, 2021 · NOV SENT OUT
- B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 2 SQ.FT AT PUBLIC HALL, 4th STORY ORIGINAL VIOLATION 14582812 ISSUED 26-SEP-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).Sep 26, 2021 · DEFECT LETTER ISSUED
- B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 SQ.FT AT PUBLIC HALL, 8th STORY ORIGINAL VIOLATION 14582814 ISSUED 26-SEP-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).Sep 26, 2021 · DEFECT LETTER ISSUED
- A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING , 1st STORYSep 26, 2021 · NOV SENT OUT
- A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 7th STORYSep 26, 2021 · NOV SENT OUT
- A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 7th STORYSep 26, 2021 · NOV SENT OUT
- A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 SQ.FT AT PUBLIC HALL, 9th STORYSep 26, 2021 · VIOLATION CLOSED
- B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 SQ.FT AT PUBLIC HALL, 6th STORY ORIGINAL VIOLATION 14582813 ISSUED 26-SEP-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).Sep 26, 2021 · NOT COMPLIED WITH
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Apr 5, 2021 · VIOLATION DISMISSED
- A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM SOUTH AT WESTAug 2, 2020 · #7D · NOV SENT OUT
- B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AT PUBLIC HALL, 7th STORYAug 2, 2020 · NOV SENT OUT
- A§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM SOUTH AT WESTAug 2, 2020 · #7D · NOV SENT OUT
- C§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT UNIT5A, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTAug 2, 2020 · #UNIT5A · NOV SENT OUT
- B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 7th STORYAug 2, 2020 · NOV SENT OUT
- A§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORYJul 29, 2020 · NOV SENT OUT
- A§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORYJul 29, 2020 · NOV SENT OUT
- A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYJul 29, 2020 · NOV SENT OUT
- A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDJul 29, 2020 · NOV SENT OUT
- A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORYJul 29, 2020 · NOV SENT OUT
- A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, APARTMENT AT WESTJul 29, 2020 · #5D · NOV SENT OUT
- A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORYJul 29, 2020 · NOV SENT OUT
- A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYJul 29, 2020 · NOV SENT OUT
- B§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING RAILING AT STAIR FROM 1ST TO 2ND FLOOR (DUPLEX APT) LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 11, 2017 · #3 · VIOLATION DISMISSED
- B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 11, 2017 · #3 · VIOLATION DISMISSED
- B§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 11, 2017 · #3 · VIOLATION DISMISSED
- B§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PRIVATE HALL STAIRS LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 13, 2016 · #3 · VIOLATION CLOSED
- B§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 13, 2016 · #3 · VIOLATION CLOSED
- B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 13, 2016 · #3 · VIOLATION CLOSED
- B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND NORTH WALL OF PRIVATE HALL STAIRS LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 13, 2016 · #3 · VIOLATION CLOSED
- ISECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.Oct 6, 2015 · VIOLATION CLOSED
DOB permits (last 30)
- NB-DAWNY CONSTRUCTION LTD
- NB-ABM CONSTRUCTION 1 INC
- NB-DVIR MOG 18 INC
- NB-DVIR MOG 18 INC
- NB-ABM CONSTRUCTION 1 INC
- EQ-ABM CONSTRUCTION 1 INC
- FO-DAWNY CONSTRUCTION LTD
- FO-DAWNY CONSTRUCTION LTD
- NB-DAWNY CONSTRUCTION LTD
- NB-DAWNY CONSTRUCTION LTD
- EQ-DAWNY CONSTRUCTION LTD
- EQ-DAWNY CONSTRUCTION LTD
- PL-THE BIG IC LLC
- NB-ABM CONSTRUCTION 1 INC
- EQ-DVIR MOG 18 INC
- NB-DVIR MOG 18 INC
- FO-DVIR MOG 18 INC
- FO-DVIR MOG 18 INC
- PL-THE PLBG & HTG SPECIALIST
- PL-BRANCH PLUMBING LLC
- PL-BRANCH PLUMBING LLC