CurbScoop
CurbScoopBuildingsGreenwood643 5TH AVENUE

643 5TH AVENUE

Brooklyn· Greenwood· built 2022class D7BBL 3008790007

643 5TH AVENUE is a 21-unit building in Greenwood, Brooklyn, built in 2022.

13 units are on the market here right now.

City records show 12 DOB permits and 37 open violations on file.

Units (res)
21
Floors
7.0
Lot ft²
5,017 ft²
Bldg ft²
25,489 ft²
Assessed
$2.50M
DOF total
Comps L5y
0

Active sale listings (13)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
643 5 AVENUE #4A
Brooklyn · built 2022
Greenwood$716K$1,200597 ft²1 bd · 1 ba-24
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #6B
Brooklyn · built 2022
Greenwood$701K$1,200584 ft²1 bd · 1 ba-24
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #5C
Brooklyn · built 2022
Greenwood$511K$1,200426 ft²studio · 1 ba-25
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #6D
Brooklyn · built 2022
Greenwood$876K$1,200730 ft²2 bd · 2 ba-6
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #6B
Brooklyn · built 2022
Greenwood$701K$1,200584 ft²1 bd · 1 ba-6
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #3A
Brooklyn · built 2022
Greenwood$716K$1,200597 ft²1 bd · 1 ba-413
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #3B
Brooklyn · built 2022
Greenwood$701K$1,200584 ft²1 bd · 1 ba-413
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #6D
Brooklyn · built 2022
Greenwood$876K$1,200730 ft²2 bd · 2 ba-24
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #3D
Brooklyn · built 2022
Greenwood$876K$1,200730 ft²2 bd · 2 ba-413
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #6C
Brooklyn · built 2022
Greenwood$968K$1,204804 ft²2 bd · 2 ba-164
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #3C
Brooklyn · built 2022
Greenwood$511K$1,200426 ft²studio · 1 ba-413
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #5C
Brooklyn · built 2022
Greenwood$511K$1,200426 ft²studio · 1 ba-7
25 HPD-C1 DOB
38.4Source
643 5 AVENUE #4A
Brooklyn · built 2022
Greenwood$716K$1,200597 ft²1 bd · 1 ba-6
25 HPD-C1 DOB
38.4Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    SECTION 27-2005 ADMIN. CODE: REFIT WINDOW FRONT WEST REAR ROOM, EAST WINDOW 2ND STORY APT.
    Mar 25, 2004 · NOV SENT OUT
  • C
    SECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES KITCHEN RANGE AT 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES KITCHEN AND BATHROOM 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES KITCHEN AND BATHROOM FIXTURES INCLUDING WATER CLOSET 2 STORY APT. ER-1.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES KITCHEN AND BATHROOM FIXTURES 2 STORY APT. ER-1.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET 2ND STORY APT ER-2.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING WINDOW PANE LOWER SASH FRONT NORTH WEST ROOM, 2ND STORY APT. #1. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2018 ADMIN. CODE: ABATE THE NUISNACE CONSISTING OF RODENTS 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING CENTER NORTH WEST ROOM, 2ND STORY APT #1. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING BATHROOM 2ND STORY APT #1. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING WINDOW PANE LOWER SASH FRONT SOUTHWEST ROOM, 2ND STORY APT. #1. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET BATHROOM 2ND STORY APT. #1. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: PROVIDE GAS TO STOVE KITCHEN, 2ND STORY APT. #1. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • A
    SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING OF CENTER SOUTHROOM--2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • A
    SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING OF 2ND STY. PUBLIC HALL
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR BATHROOM CEILING AT 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEIING AT 1ST ROOM OFF KITCHEN AT NORTH 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT 2ND STORY PUBLIC HALL.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING WINDOW GLASS FRONT ROOM SOUTH LOWER SASH CENTER WINDOW AT 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING WINDOW GLASS FRONT ROOM NORTH LOWER SASH AT 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES KITCHEN AND WASH BASIN AT 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES KITCHEN AND WASH BASIN AT BATHROOM 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES GAS RANGE KITCHEN, 2ND STORY APT. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES KITCHEN AND BATHROOM, 2ND STORY APT. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES KITCHEN AND BATHROOM, 2ND STORY APT. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE ROTTED SUPPORT POSTS MAIN BEAM CELLAR CENTER. ER-1
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET BATHROOM, 2ND STORY APT. 1.
    Mar 24, 2004 · NOV SENT OUT
  • A
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILINGS 2ND STORY APT THROUGHOUT.
    Mar 24, 2004 · NOV SENT OUT
  • A
    SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING OF KITCHEN 2ND STORY APT.
    Mar 24, 2004 · NOV SENT OUT
  • C
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING THROU-OUT 2ND STORY APT #2
    Jul 10, 2003 · NOV SENT OUT
DOB permits (last 30)
  • NB-
    MKB CONSTRUCTION USA LLC
  • DM-
    MASTER WORKS CONTRACTOR I
  • PL-
    ALL ABOUT PLBG & HTG INC
  • DM-
    5D ARCHITECT AND ENGINEER
  • AL-
    OWNER
  • DM-
    BROOKLYN AZ INC
  • FO-
    MKB CONSTRUCTION USA LLC
  • FO-
    MKB CONSTRUCTION USA LLC
  • NB-
    MKB CONSTRUCTION USA LLC
  • NB-
    MKB CONSTRUCTION USA LLC
  • PL-
    RRP PLUMBING CORP
  • PL-
    RRP PLUMBING CORP
DOB violations
  • Oct 4, 2023AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 6, 2021C-CONSTRUCTION OTHER OPTIONAL
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 1, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 8, 1991C-CONSTRUCTION OTHER OPTIONAL

More buildings in Greenwood

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3008790007

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
13 active sale listings in the current corpus · latest record Aug 14, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
12 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
30 violations in the current corpus · latest record Jun 4, 2008

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
7 violations in the current corpus · latest record Jul 17, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Greenwood market page.