CurbScoop
CurbScoopBuildingsDowntown Brooklyn9 CHAPEL STREET

9 CHAPEL STREET

Brooklyn· Downtown Brooklyn· built 2022class R4BBL 3001187501

9 CHAPEL STREET is a 27-unit building in Downtown Brooklyn, Brooklyn, built in 2022.

4 units are on the market here right now.

City records show 11 DOB permits and 22 open violations on file.

Units (res)
27
Floors
12.0
Lot ft²
4,960 ft²
Bldg ft²
31,761 ft²
Assessed
$7.13M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
9 CHAPEL STREET #5C
Brooklyn · built 2022
Downtown Brooklyn$1.70M$1,4561,164 ft²2 bd · 2 ba-92
11 HPD-Cbedbug
22.1Source
9 CHAPEL STREET #6C
Brooklyn · built 2022
Downtown Brooklyn$1.75M$1,5031,164 ft²2 bd · 2 ba-291
11 HPD-Cbedbug
22.1Source
9 CHAPEL STREET #5
Brooklyn · built 2022
Downtown Brooklyn$1.70M$1,4561,164 ft²2 bd · 2 ba-74
11 HPD-Cbedbug
22.1Source
9 CHAPEL STREET #11A
Brooklyn · built 2022
Downtown Brooklyn$3.50M$1,7831,962 ft²3 bd · 3 ba-61
11 HPD-Cbedbug
22.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    May 11, 2026 · VIOLATION DISMISSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 2, 2026 · #2C · VIOLATION CLOSED
  • A
    §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX MISSING AT PUBLIC HALL
    Mar 2, 2026 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL
    Mar 2, 2026 · VIOLATION CLOSED
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SLIT HEATING UNIT AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 2, 2026 · #2C · INVALID CERTIFICATION
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL
    Mar 2, 2026 · VIOLATION CLOSED
  • A
    §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS MISSING
    Mar 2, 2026 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL
    Mar 2, 2026 · VIOLATION CLOSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 2, 2026 · #2C · NOV CERTIFIED LATE
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL
    Mar 2, 2026 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL
    Mar 2, 2026 · INVALID CERTIFICATION
  • A
    § 27-2049 ADM CODE POST AND MAINTAIN A STREET NUMBER ON THE FRONT OF THE DWELLING PLAINLY VISIBLE FROM THE SIDEWALK.
    Mar 2, 2026 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 24, 2026 · #2C · VIOLATION CLOSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 24, 2026 · #2C · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR AT NORTH AT PUBLIC HALL, 2nd STORY
    Feb 16, 2026 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR AT COMPACTOR CLOSET, 1st STORY
    Feb 16, 2026 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT COMPACTOR CLOSET, 1st STORY
    Feb 16, 2026 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT COMPACTOR CLOSET, 1st STORY
    Feb 16, 2026 · VIOLATION DISMISSED
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CHALKING AT ALL WALLS IN BATHTUB IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 7, 2026 · #2C · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT ALL WALLS AT PUBLIC HALL AT CELLAR
    Feb 7, 2026 · VIOLATION CLOSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 7, 2026 · #2C · VIOLATION CLOSED
  • C
    § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 25, 2026 · #2C · VIOLATION CLOSED
DOB permits (last 30)
  • FO-
    K S K CONSTRUCTION GROUP
  • FO-
    K S K CONSTRUCTION GROUP
  • FO-
    K S K CONSTRUCTION GROUP
  • FO-
    K S K CONSTRUCTION GROUP
  • FO-
    K S K CONSTRUCTION GROUP
  • FO-
    K S K CONSTRUCTION GROUP
  • NB-
    K S K CONSTRUCTION GROUP
  • NB-
    K S K CONSTRUCTION GROUP
  • NB-
    K S K CONSTRUCTION GROUP
  • NB-
    K S K CONSTRUCTION GROUP
  • NB-
    K S K CONSTRUCTION GROUP

More buildings in Downtown Brooklyn

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3001187501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jul 1, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
11 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
22 violations in the current corpus · latest record May 21, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Downtown Brooklyn market page.