CurbScoop
DealsManhattan860 WEST 181 STREET

860 WEST 181 STREET

Manhattan· Hudson Heights· built 1923class D4BBL 1021770175
Open listing source
Units (res)
66
Floors
6.0
Lot ft²
13,625 ft²
Bldg ft²
60,780 ft²
Assessed
$2.35M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
860 WEST 181 STREET #8
Manhattan · built 1923
Hudson Heights$525K-0 ft²2 bd · 1 ba-162
2 HPD-Cbedbug
9.7Source
860 WEST 181 STREET #54
Manhattan · built 1923
Hudson Heights$490K-0 ft²1 bd · 1 ba-54
2 HPD-Cbedbug
9.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER LOCATED AT APT C, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2012 · #C · VIOLATION CLOSED
  • B
    § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2012 · #C · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Nov 22, 2004 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 6, 1st STORY, 5th APARTMENT FROM NORTH AT EAST
    Sep 25, 2003 · #6 · NOV SENT OUT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 26, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Sep 25, 2003 · #26 · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED ON APT. DOOR IN THE ENTRANCE LOCATED AT APT 26, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Sep 25, 2003 · #26 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 6, 1st STORY, 5th APARTMENT FROM NORTH AT EAST
    Sep 25, 2003 · #6 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6, 1st STORY, 5th APARTMENT FROM NORTH AT EAST
    Sep 25, 2003 · #6 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING 1 STY PUBLIC HALL.
    Sep 4, 1999 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER.
    Sep 4, 1999 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING.
    Sep 4, 1999 · NOV SENT OUT
  • C
    § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING NORTH ROOM 3 STY 2 FROM SOUTH AT EAST APT 35 WHITE 927 0694 ER1. LOCATED AT APT 35
    Feb 28, 1989 · #35 · NOV SENT OUT
DOB permits (last 30)
  • SPAug 17, 1990
    D & L PLUMBING & HEATING
  • OT-
    E&J ALL SEASONS CONSTRUCT
  • OT-
    SELF
  • OT-
    L & Z RESTORATION CORP
  • EQ-
    INTERSYSTEMS CORPORATION
  • PL-
    AMD &.ASSOCIATES INC
  • OT-
    WESTCHESTER CUSTOM KITCHE
  • MH-
    WESTCHESTER CUSTOM KITCHE
  • PL-
    SANITARY PLBG & HTG CORP
  • OT-
    S&O CONSTRUCTION ENTERPRI
  • EQ-
    S&O CONSTRUCTION ENTERPRI
  • PL-
    NATIONAL PLG AND HTG CORP
  • OT-
    L & Z RESTORATION CORP
  • OT-
    BLUE LAKE CONSTRUCTION CORP
  • OT-
    ARKARA CONST. CO.
  • SP-
    D & L PLUMBING & HEATING
  • OT-
    S&O CONSTRUCTION ENTERPRI
  • AL-
    WEST GATE HOUSE ,INC.
  • EQ-
    EVEREST SCAFFOLDING INC.
  • OT-
    BEST BUILDING GROUP CORP
  • PL-
    P.S.I. MECHANICAL
  • OT-
    SKYLINE RESTORATION INC
  • EQ-
    S&O CONSTRUCTION ENTERPRI
  • OT-
    S&O CONSTRUCTION ENTERPRI
  • OT-
    S&O CONSTRUCTION ENTERPRI
  • PL-
    BARNETT PLBG & HTG CORP
  • OT-
    L & Z RESTORATION CORP