CurbScoop
CurbScoopBuildingsFort George137 NAGLE AVENUE

137 NAGLE AVENUE

Manhattan· Fort George· built 1920class C1BBL 1021730023
Open listing source

137 NAGLE AVENUE is a 26-unit building in Fort George, Manhattan, built in 1920.

CurbScoop has 1 recorded sale on this tax lot, most recently $435K on Jun 26, 2026.

1 of those closed in the last five years, at a median of $435K.

City records show 8 DOB permits and 46 open violations on file.

Units (res)
26
Floors
5.0
Lot ft²
5,250 ft²
Bldg ft²
18,500 ft²
Assessed
$589K
DOF total
Comps L5y
1
median $435K

Transaction history (1)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
Jul 10, 2026-DEED$435K

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
    Mar 14, 2026 · NOV CERTIFIED ON TIME
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 14, 2026 · #42 · CIV14 MAILED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 14, 2026 · #42 · CIV14 MAILED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 52, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Dec 12, 2024 · #52 · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 3 IN THE ENTIRE APARTMENT LOCATED AT APT 52, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Dec 12, 2024 · #52 · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 52, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Dec 12, 2024 · #52 · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 52, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Sep 26, 2024 · #52 · NOTICE OF ISSUANCE SENT TO TENANT
  • A
    § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONENTS AT ALL STORIES BALCONIES SOUTH FIRE ESCAPE AT FRONT INNER COURT
    Sep 19, 2024 · NOT COMPLIED WITH
  • B
    § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER UNIT PROTRUDING MORE THAN 4 INCHESS FROM WINDOW SILL AT 2ND AND 3RD STORY BALCONY AT FRONT INNER COURT AT SOUTH
    Sep 19, 2024 · VIOLATION DISMISSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT EAST FIRE DOOR AT PUBLIC HALL, 1st STORY
    Sep 19, 2024 · VIOLATION CLOSED
  • A
    § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONENTS AT ALL STORIES BALCONIES FIRE ESCAPE AT FRONT
    Sep 19, 2024 · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 22, 2024 · #54 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE KITCHEN LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 22, 2024 · #54 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 22, 2024 · #54 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 22, 2024 · #54 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND EAST WALL. IN THE 2nd ROOM FROM NORTH LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 22, 2024 · #54 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 22, 2024 · #54 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 22, 2024 · #54 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 22, 2024 · #54 · VIOLATION DISMISSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jan 23, 2024 · #42 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM AT BASEMENT
    Jan 23, 2024 · VIOLATION DISMISSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 31, 2023 · #51 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 31, 2023 · #51 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 31, 2023 · #51 · VIOLATION DISMISSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING ( APPROX 5 SQFT ) IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16131885 ISSUED 31-JUL-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Jul 31, 2023 · #51 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 31, 2023 · #51 · VIOLATION DISMISSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING ( APPROX 5 SQFT ) IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 31, 2023 · #51 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROVIDE HANDLE AT ROOF DOOR TO ALLOW ENTRY TO BUILDING FROM ROOF AT 1st PUBLIC HALL BULKHEAD FROM NORTH
    Feb 18, 2023 · VIOLATION DISMISSED
  • B
    § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL AT 1st PUBLIC HALL BULKHEAD FROM NORTH
    Feb 18, 2023 · VIOLATION DISMISSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK PREVENTING RE-ENTRY TO BUILDING FROM ROOF AT 1st PUBLIC HALL BULKHEAD FROM NORTH
    Feb 18, 2023 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BULKHEAD LEADING TO ROOF
    Jan 19, 2023 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AT RIOOM NORTH 3 AT BASEMENT
    Jan 19, 2023 · VIOLATION DISMISSED
  • B
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2022 · #42 · VIOLATION CLOSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2022 · #42 · NOT COMPLIED WITH
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2022 · #42 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 42, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2022 · #42 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT VESTIBULE AT PUBLIC HALL, 1st STORY
    Sep 2, 2022 · VIOLATION WILL BE REINSPECTED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 44, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 24, 2022 · #44 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, EAST WALL IN THE KITCHEN LOCATED AT APT 44, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 24, 2022 · #44 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT 44, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 24, 2022 · #44 · VIOLATION WILL BE REINSPECTED
DOB permits (last 30)
  • BL-
    MICHAEL S. KAPLAN
  • FB-
    MICHAEL S. KAPLAN
  • PL-
    IRWIN FRIEDMAN & SON INC
  • BL-
    MICHAEL S. KAPLAN
  • FB-
    MICHAEL S. KAPLAN
  • PL-
    IRWIN FRIEDMAN & SON INC
  • FB-
    JACK PICCININNI INC.
  • FS-
    JACK PICCININNI INC.
DOB violations
  • Oct 28, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 27, 2020IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
  • Oct 5, 2016AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 2, 2011AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 6, 2006LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Fort George

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1021730023

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
0 active sale listings in the current corpus

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
1 recorded deed in the current corpus · latest record Jul 10, 2026

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
8 permits in the current corpus

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
264 violations in the current corpus · latest record Apr 14, 2026

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
6 violations in the current corpus · latest record Jan 25, 2022

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Fort George market page.