CurbScoop
CurbScoopBuildings330 WEST 145 STREET

330 WEST 145 STREET

Manhattan· built 2001class RMBBL 1020517501
Open listing source

330 WEST 145 STREET is a 77-unit building in Manhattan, built in 2001.

3 units are on the market here right now.

City records show 17 DOB permits and 44 open violations on file.

Units (res)
77
Floors
8.0
Lot ft²
19,542 ft²
Bldg ft²
104,739 ft²
Assessed
$9.07M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
330 WEST 145 STREET #311
Manhattan · built 2001
-$495K$811610 ft²1 bd · 1 ba-136
1 HPD-C6 DOBbedbug
11.8Source
330 WEST 145 STREET #602
Manhattan · built 2001
-$629K-0 ft²2 bd · 2 ba-101
1 HPD-C6 DOBbedbug
11.8Source
330 WEST 145 STREET #503
Manhattan · built 2001
-$849K-0 ft²3 bd · 2 ba-160
1 HPD-C6 DOBbedbug
11.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 17, 2025 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 16, 2021 · VIOLATION DISMISSED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 4th BATHROOM FROM EAST AT NORTH LOCATED AT APT 313, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jul 29, 2017 · #313 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT CLOSET IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 313, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jul 29, 2017 · #313 · VIOLATION CLOSED
  • C
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CASCADING WATER SOUTH WALL IN THE BATHROOM LOCATED AT APT 313, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jul 29, 2017 · #313 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE BATHROOM LOCATED AT APT 313, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jul 29, 2017 · #313 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE 4th BATHROOM FROM EAST AT NORTH LOCATED AT APT 313, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jul 29, 2017 · #313 · VIOLATION CLOSED
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE 2nd BATHROOM LOCATED AT APT 313, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 8, 2017 · #313 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM LOCATED AT APT 313, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 8, 2017 · #313 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM LOCATED AT APT 313, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 8, 2017 · #313 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE 2nd BATHROOM LOCATED AT APT 313, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 8, 2017 · #313 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 313, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 8, 2017 · #313 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 313, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 8, 2017 · #313 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st BATHROOM LOCATED AT APT 313, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 8, 2017 · #313 · VIOLATION CLOSED
  • A
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT EAST WALL IN THE 1st BATHROOM LOCATED AT APT 313, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 8, 2017 · #313 · VIOLATION CLOSED
DOB permits (last 30)
  • SG-
    LADDER 3 CORP
  • SG-
    LADDER 3 CORP
  • SG-
    LADDER 3 CORP
  • PL-
    RIGHTWAY PLBG & HTG, INC
  • SG-
    NATIONAL MAINTENANCE INC
  • SG-
    NATIONAL MAINTENANCE INC
  • SG-
    NATIONAL MAINTENANCE INC
  • OT-
    GREAT NORTH INTERIORS
  • MH-
    GREAT NORTH INTERIORS
  • OT-
    QUALITY BUILDING CONSTRUT
  • EQ-
    GCC CONTRACTING GROUP INC
  • PL-
    PAR PLUMBING CO., INC.
  • SP-
    SIRINA FIRE PROTECTION CORP
  • EQ-
    GCC CONTRACTING GROUP INC
  • EQ-
    DUANE READE
  • OT-
    DUANE READE
  • MH-
    DUANE READE
DOB violations
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Oct 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Oct 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 3, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 3, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 17, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 4, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 4, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 3, 2013AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 4, 2012LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 1, 2011E-ELEVATOR ELEVATORREQUIRED
  • Feb 1, 2011E-ELEVATOR ELEVATORREQUIRED
  • Apr 12, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 12, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 20, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1020517501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record May 22, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
17 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
15 violations in the current corpus · latest record Dec 24, 2025

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
29 violations in the current corpus · latest record Jul 11, 2023

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.