CurbScoop
CurbScoopBuildingsWest Harlem29 CONVENT AVENUE

29 CONVENT AVENUE

Manhattan· West Harlem· built 1910class C6BBL 1019680058

29 CONVENT AVENUE is a 24-unit building in West Harlem, Manhattan, built in 1910.

3 units are on the market here right now.

City records show 23 DOB permits and 66 open violations on file.

Units (res)
24
Floors
5.0
Lot ft²
4,234 ft²
Bldg ft²
15,430 ft²
Assessed
$643K
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
29 CONVENT AVENUE #21
Manhattan · built 1910
West Harlem$299K$642466 ft²1 bd · 1 ba-103
11 HPD-C19 DOBbedbug
32.1Source
29 CONVENT AVENUE #24
Manhattan · built 1910
West Harlem$275K$773355 ft²1 bd · 1 ba-248
11 HPD-C19 DOBbedbug
32.1Source
29 CONVENT AVENUE #11
Manhattan · built 1910
West Harlem$279K$565494 ft²1 bd · 1 ba-163
11 HPD-C19 DOBbedbug
32.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 21, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 11, 2025 · #21 · NOV SENT OUT
  • C
    § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 21, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 11, 2025 · #21 · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 21, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 11, 2025 · #21 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE FOYER , THE KITCHEN , THE 4th ROOM FROM NORTH, THE BATHROOM LOCATED AT APT 21, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 11, 2025 · #21 · NOV CERTIFIED LATE
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 21, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18083345 ISSUED 11-JUL-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b).
    Jul 11, 2025 · #21 · NOV CERTIFIED LATE
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, BASEBOARD AT EAST WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 21, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 11, 2025 · #21 · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 24, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 28, 2025 · #24 · NOV SENT OUT
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 24, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 28, 2025 · #24 · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 24, 5th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17789472 ISSUED 28-MAR-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Mar 28, 2025 · #24 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 24, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 28, 2025 · #24 · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 24, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 28, 2025 · #24 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LIGHT FIXTURE AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS AT EAST,SOUTH AND NORTH WALLS IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUB FLOOR IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE ( MISSING RADIATOR ) IN THE 2nd ROOM FROM EAST LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Mar 22, 2021 · #10 · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE FOYER LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE FOYER LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTHWALL IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE TWO ELECTRICAL OUTLETS AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX. 13 SQUARE FEET AT CEILING IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX PAPER SIGN PRESENT AT PUBLIC HALL, 1st STORY
    Dec 31, 2020 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM PAPER SIGN PRESENT AT PUBLIC HALL, 1st STORY
    Dec 31, 2020 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Dec 31, 2020 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Dec 31, 2020 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Dec 31, 2020 · #10 · NOV SENT OUT
DOB permits (last 30)
  • OT-
    URBAN HABITAT
  • PL-
    THOMAS J OGRADY PLUMB
  • OT-
    PSG CONSTRUCTION CO. INC.
  • FS-
    PRECISION/CLEVIE STEWART
  • EQ-
    CS BRIDGE CORP
  • EQ-
    COLGATE SCAFF & EQUIP CO
  • EQ-
    CS BRIDGE CORP
  • PL-
    DEROZA-WATSON PLBG & HTG
  • EQ-
    CS BRIDGE CORP
  • EQ-
    COLGATE SCAFFOLDING & EQ CORP
  • OT-
    SR MAINTENANCE INC
  • OT-
    REEM CONSTRUCTION CORP
  • PL-
    EMPIRE PLUMBING INC
  • OT-
    MICHAEL DEFINIS ALL PRO C
  • OT-
    CERINA GENERAL CONTR INC
  • PL-
    GO PRO PLBNG AND HTG CO I
  • OT-
    CERINA GENERAL CONTR INC
  • EQ-
    COLGATE SCAFFOLDING & EQ CORP
  • OT-
    FANTASY CONSTRUCTION INC
  • PL-
    DEROZA-WATSON PLBG & HTG
  • OT-
    MICHAEL DEFINIS ALL PRO C
  • OT-
    ST MARKS PLUMBING/HEATING CO INC
  • PL-
    ST MARKS PLUMBING/HEATING CO INC
DOB violations
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 1, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 6, 2006LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 19, 2003LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 7, 2000LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 16, 1999LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 16, 1999LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in West Harlem

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1019680058

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record May 20, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
23 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
105 violations in the current corpus · latest record Jan 8, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
26 violations in the current corpus · latest record Nov 8, 2019

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the West Harlem market page.