CurbScoop
CurbScoopBuildings308 WEST 133RD STREET

308 WEST 133RD STREET

Manhattan· built 2016class RMBBL 1019587502

308 WEST 133RD STREET is a 46-unit building in Manhattan, built in 2016.

6 units are on the market here right now.

City records show 1 DOB permit and 36 open violations on file.

Units (res)
46
Floors
11.0
Lot ft²
15,794 ft²
Bldg ft²
38,254 ft²
Assessed
$5.47M
DOF total
Comps L5y
0

Active sale listings (6)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
308 WEST 133 STREET #5B
Manhattan · built 2016
-$565K$914618 ft²1 bd · 1 ba-55
4 HPD-C1 DOBbedbug
12.8Source
308 WEST 133 STREET #4C
Manhattan · built 2016
-$616K$876703 ft²studio · 1 ba-50
4 HPD-C1 DOBbedbug
12.8Source
308 WEST 133 STREET #9C
Manhattan · built 2016
-$1000K$1,166858 ft²2 bd · 2 ba-51
4 HPD-C1 DOBbedbug
12.8Source
308 WEST 133 STREET #6A
Manhattan · built 2016
-$933K$940993 ft²2 bd · 2 ba-55
4 HPD-C1 DOBbedbug
12.8Source
308 WEST 133 STREET #8D
Manhattan · built 2016
-$805K$1,022788 ft²1 bd · 2 ba-55
4 HPD-C1 DOBbedbug
12.8Source
308 WEST 133 STREET #7E
Manhattan · built 2016
-$715K$1,010708 ft²1 bd · 1 ba-55
4 HPD-C1 DOBbedbug
12.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 6th STORY
    Feb 20, 2023 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST WALL AT PUBLIC HALL, 5th STORY
    Feb 20, 2023 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST WALL AT PUBLIC HALL, 6th STORY
    Feb 20, 2023 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 5th STORY
    Feb 20, 2023 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 9, 2022 · #11C · VIOLATION CLOSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 9, 2022 · #11C · VIOLATION WILL BE REINSPECTED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 5th ROOM FROM NORTH LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 9, 2022 · #11C · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 9, 2022 · #11C · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 9, 2022 · #11C · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Sep 2, 2022 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Sep 2, 2022 · VIOLATION WILL BE REINSPECTED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Sep 2, 2022 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 2, 2022 · #5C · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Sep 2, 2022 · VIOLATION WILL BE REINSPECTED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING
    Jul 1, 2022 · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT APT3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 1, 2022 · #APT3A · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT APT3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 1, 2022 · #APT3A · VIOLATION CLOSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING.
    Jul 1, 2022 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 9D, 9th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 11, 2022 · #9D · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 9D, 9th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 11, 2022 · #9D · VIOLATION CLOSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 10, 2022 · VIOLATION DISMISSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 2 SQ. FT. IN THE FOYER LOCATED AT APT 2A, 2nd STORY, APARTMENT AT SOUTH
    Mar 6, 2022 · #2A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION AT CEILING, IN THE 2nd BATHROOM LOCATED AT APT 2A, 2nd STORY, APARTMENT AT SOUTH
    Mar 6, 2022 · #2A · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 2A, 2nd STORY, APARTMENT AT SOUTH
    Mar 6, 2022 · #2A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL, IN THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd STORY, APARTMENT AT SOUTH
    Mar 6, 2022 · #2A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 9D, 9th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 2, 2022 · #9D · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 9D, 9th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 2, 2022 · #9D · VIOLATION DISMISSED
  • B
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Dec 3, 2021 · #6E · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AT WASHER CLOSET AT WEST LOCATED AT APT 9C, 9th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 1, 2021 · #9C · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY
    Apr 1, 2021 · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING 1 SQ FT AT NORTH 2 CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 9C, 9th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 14117158 ISSUED 01-APR-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Apr 1, 2021 · #9C · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING 1 SQ FT AT NORTH 2 CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 9C, 9th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 1, 2021 · #9C · VIOLATION CLOSED
DOB permits (last 30)
  • OT-
    KEVO CONSTRUCTION INC
DOB violations
  • Feb 3, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Nov 2, 2020BENCH-FAILURE TO BENCHMARK NONE
  • Aug 2, 2020BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2020BENCH-FAILURE TO BENCHMARK NONE

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1019587502

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
6 active sale listings in the current corpus · latest record Aug 26, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
1 permit in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
32 violations in the current corpus · latest record Jul 30, 2024

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
4 violations in the current corpus · latest record Apr 7, 2021

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.