CurbScoop
CurbScoopBuildingsUpper West Side825 WEST END AVENUE

825 WEST END AVENUE

Manhattan· Upper West Side· built 1928class RMBBL 1018897501
Open listing source

825 WEST END AVENUE is a 105-unit building in Upper West Side, Manhattan, built in 1928.

3 units are on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
105
Floors
16.0
Lot ft²
15,832 ft²
Bldg ft²
166,833 ft²
Assessed
$20.6M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
825 WEST END AVENUE #1I
Manhattan · built 1928
Upper West Side$499K-0 ft²studio · 1 ba-300
15 HPD-C4 DOBbedbug
34.4Source
825 WEST END AVENUE #1I
Manhattan · built 1928
Upper West Side$435K-0 ft²studio · 1 ba-266
15 HPD-C4 DOBbedbug
34.4Source
825 WEST END AVENUE #3DE
Manhattan · built 1928
Upper West Side$3.65M$1,1723,114 ft²5 bd · 4 ba-457
15 HPD-C4 DOBbedbug
34.4Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 17, 2026 · #2D · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERATIVE BELL, BUZZER,INTERCOM SYSTEM FROM 1ST FLOOR PUBLIC HALL VESTIBULE TO THE PANEL AT EAST WALL IN THE FOYER LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 17, 2026 · #2D · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE POWER OUTLET AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 17, 2026 · #2D · NOV SENT OUT
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 5, 2025 · #11C · VIOLATION CLOSED
  • A
    § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION .. IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 2, 2025 · #2D · NOV SENT OUT
  • A
    § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION . IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 30, 2025 · #2D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 30, 2025 · #2D · NOV CERTIFIED LATE
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER RETURN AT WEST WALL IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 30, 2025 · #2D · NOV CERTIFIED LATE
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 30, 2025 · #2D · NOV CERTIFIED LATE
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL AT CLOSET (EAST) IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC WALL TILES AT WEST IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV CERTIFIED LATE
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV CERTIFIED LATE
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ. FT. AT WEST AND NORTH WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · DEFECT LETTER ISSUED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV CERTIFIED LATE
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 19, 2025 · #2D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 31, 2025 · #2D · CERTIFICATION POSTPONMENT DENIED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 31, 2025 · #2D · CERTIFICATION POSTPONMENT DENIED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 31, 2025 · #2D · CERTIFICATION POSTPONMENT DENIED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE CLOSET AT EAST IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 31, 2025 · #2D · CERTIFICATION POSTPONMENT DENIED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 31, 2025 · #2D · CERTIFICATION POSTPONMENT DENIED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 31, 2025 · #2D · CERTIFICATION POSTPONMENT DENIED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 31, 2025 · #2D · CERTIFICATION POSTPONMENT DENIED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 31, 2025 · #2D · CERTIFICATION POSTPONMENT DENIED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 3rd BATHROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER SASH AT 1ST WINDOW FROM EAST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER SASH AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTERBALANCE AT UPPER SASH AT WINDOW AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER SASH AT 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
  • B
    § 27-2053 ADM CODE PROVIDE DWELLING WITH A JANITOR OR RESPONSIBLE PERSON OR JANITORIAL SERVICE.
    Jul 27, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH AND WEST WALLS IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT WEST AND NORTH WALLS IN THE 3rd BATHROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT WEST WALL IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTERBALANCE UPPER SASH 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET IN THE ENTRANCE LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET UNDER SINK IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER WINDOW SASH AT WEST WALL IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 27, 2024 · #4C · NOV CERTIFIED LATE
DOB permits (last 30)
  • MHJun 6, 2016
    HITE CONSTRUCTION INC
  • EQJan 29, 2014
    EMPIRE SCAFFOLDING SYSTEM
  • OTSep 20, 1996
    MATILDA CONSTR. CO
  • OTNov 22, 1994
    TOWER BUILDING RESTORATION
  • OT-
    ZOOM CONTRACTING INC
  • OT-
    ATLAS REMODELING CORP
  • PL-
    G & L PLUMBING CO, INC
  • PL-
    INS DYNAMICS INC
  • OT-
    JAP RESTORATION INC
  • PL-
    M. FARBMAN & SONS, INC
  • PL-
    MAGNUM PLBG. & HTG CORP.
  • OT-
    SOHOME WORK INC
  • PL-
    DYCKMAN PLBG AND HTG INC
  • EQ-
    EMPIRE SCAFFOLDING SYSTEM
  • PL-
    SALSONS MECH. CONSTR. CORP.
  • OT-
    INS DYNAMICS INC
  • EQ-
    EMPIRE SCAFFOLDING SYSTEMS INC
  • EQ-
    EMPIRE SCAFFOLDING SYSTEM
  • PL-
    S.O.S. PLBG & HTG LTD
  • PL-
    RITE WAY PLBG & HTG CORP
  • PL-
    RETCON MECHANICAL CORP
  • OT-
    SOHOME WORK INC
  • PL-
    JMW PLUMBING, INC
  • PL-
    M&M PLBG & HTG INC
  • OT-
    TOWER BLDG SERVICES,INC
  • OT-
    HITE INTERIORS INC
  • PL-
    A. M. PLUMBING COMPANY
  • PL-
    L&J PLG & HTG CO OF NY IN
  • OT-
    HITE CONSTRUCTION INC
  • OT-
    BUILD IT! INNOVATIVE CREA
DOB violations
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Aug 21, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Feb 21, 2022FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Feb 21, 2022FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jul 1, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 24, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 24, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 24, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 24, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 29, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 29, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 8, 2013AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 11, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 11, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 11, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 11, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 19, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 19, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 8, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 8, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 8, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 8, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2009E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1018897501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jul 28, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
188 permits in the current corpus · latest record Jun 6, 2016

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
262 violations in the current corpus · latest record Apr 20, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
50 violations in the current corpus · latest record Jul 20, 2023

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.