516 WEST 112 STREET
Units (res)
71
Floors
19.0
Lot ft²
20,184 ft²
Bldg ft²
67,313 ft²
Assessed
$5.25M
DOF total
Comps L5y
0
Active sale listings (1)
| Address | Neighborhood | Price | $/ft² | Sqft | Beds/Baths | vs comp | DOM | Risk | Score | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 520 WEST 112 STREET #4B Manhattan · built 1990 | Morningside Heights | $485K | $746 | 650 ft² | 1 bd · 1 ba | - | 144 | 2 HPD-Cbedbug | 9.0 | Source |
Transaction history (0)
Every recorded deed for this tax lot.
No recorded transactions for this BBL yet.
Building risk + activity
HPD violations (last 40)
- C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSINGApr 20, 2024 · NOV SENT OUT
- A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING.Apr 20, 2024 · NOV SENT OUT
- A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.Apr 20, 2024 · NOV SENT OUT
- A§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER.Apr 20, 2024 · NOV SENT OUT
- A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSINGApr 20, 2024 · NOV SENT OUT
- A§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.Apr 20, 2024 · NOV SENT OUT
- A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALLApr 20, 2024 · NOV SENT OUT
- B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING AT MAILROOM AT PUBLIC HALL, 1st STORYApr 20, 2024 · NOV SENT OUT
- A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT MAIL ROOM AT PUBLIC HALL, 1st STORYApr 20, 2024 · NOV SENT OUT
- C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT MAIL ROOM CEILING AT PUBLIC HALL, 1st STORYApr 20, 2024 · VIOLATION CLOSED
DOB permits (last 30)
- OTJan 10, 2002COLUMBIA UNIVERSITY
- EQ-ROCLKEDGE SCAFFOLD
- OT-JRR CONTRACTING INC
- OT-COLUMBIA UNIVERSITY
- MH-COLUMBIA UNIVERSITY
- OT-COLUMBIA UNIVERSITY
- PL-ABSOLUTE PLBG & HTG CORP
- OT-COLUMBIA UNIVERSITY
- PL-ABSOLUTE PLBG & HTG CORP
- OT-BREND RENOVATION CORP
- PL-ABSOLUTE PLBG & HTG CORP
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- PL-ALAFORGIANNIS PLUMB HEAT ICN.
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-COLUMBIA UNIVERSITY
- MH-COLUMBIA UNIVERSITY
- MH-COLUMBIA UNIVERSITY
- OT-COLUMBIA UNIVERSITY
- OT-JRR CONTRACTING INC
- OT-JRR CONTRACTING INC
- OT-COLUMBIA UNIVERSITY