CurbScoop
CurbScoopBuildingsMorningside Heights516 WEST 112 STREET

516 WEST 112 STREET

Manhattan· Morningside Heights· built 1990class RMBBL 1018837502
Open listing source

516 WEST 112 STREET is a 71-unit building in Morningside Heights, Manhattan, built in 1990.

1 unit is on the market here right now.

City records show 30 DOB permits and 50 open violations on file.

Units (res)
71
Floors
19.0
Lot ft²
20,184 ft²
Bldg ft²
67,313 ft²
Assessed
$5.25M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
520 WEST 112 STREET #4B
Manhattan · built 1990
Morningside Heights$475K$731650 ft²1 bd · 1 ba-165
2 HPD-C20 DOBbedbug
19.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING
    Apr 20, 2024 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING.
    Apr 20, 2024 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
    Apr 20, 2024 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER.
    Apr 20, 2024 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING
    Apr 20, 2024 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Apr 20, 2024 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL
    Apr 20, 2024 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING AT MAILROOM AT PUBLIC HALL, 1st STORY
    Apr 20, 2024 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT MAIL ROOM AT PUBLIC HALL, 1st STORY
    Apr 20, 2024 · NOV SENT OUT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT MAIL ROOM CEILING AT PUBLIC HALL, 1st STORY
    Apr 20, 2024 · VIOLATION CLOSED
DOB permits (last 30)
  • OTJan 10, 2002
    COLUMBIA UNIVERSITY
  • EQ-
    ROCLKEDGE SCAFFOLD
  • OT-
    JRR CONTRACTING INC
  • OT-
    COLUMBIA UNIVERSITY
  • MH-
    COLUMBIA UNIVERSITY
  • OT-
    COLUMBIA UNIVERSITY
  • PL-
    ABSOLUTE PLBG & HTG CORP
  • OT-
    COLUMBIA UNIVERSITY
  • PL-
    ABSOLUTE PLBG & HTG CORP
  • OT-
    BREND RENOVATION CORP
  • PL-
    ABSOLUTE PLBG & HTG CORP
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • PL-
    ALAFORGIANNIS PLUMB HEAT ICN.
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    COLUMBIA UNIVERSITY
  • MH-
    COLUMBIA UNIVERSITY
  • MH-
    COLUMBIA UNIVERSITY
  • OT-
    COLUMBIA UNIVERSITY
  • OT-
    JRR CONTRACTING INC
  • OT-
    JRR CONTRACTING INC
  • OT-
    COLUMBIA UNIVERSITY
DOB violations
  • Jan 22, 2025AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 22, 2024FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Feb 13, 2019FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Oct 17, 2018E-ELEVATOR ELEVATORREQUIRED
  • Oct 17, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 14, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 14, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Jan 1, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Aug 30, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 13, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 13, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 12, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 12, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2006E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2006LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Morningside Heights

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1018837502

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jan 5, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
68 permits in the current corpus · latest record Jan 10, 2002

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
10 violations in the current corpus · latest record Jun 3, 2024

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
56 violations in the current corpus · latest record Jan 22, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Morningside Heights market page.