CurbScoop

2770 BROADWAY

Manhattan· Manhattan Valley· built 2004class RMBBL 1018787501

2770 BROADWAY is a 64-unit building in Manhattan Valley, Manhattan, built in 2004.

1 unit is on the market here right now.

City records show 17 DOB permits and 17 open violations on file.

Units (res)
64
Floors
20.0
Lot ft²
10,197 ft²
Bldg ft²
121,068 ft²
Assessed
$21.8M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
272 West 107th Street #11C
Manhattan · built 2004
Manhattan Valley$3.50M$1,5982,187 ft²4 bd · 2 ba-63
6 DOBbedbug
9.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
None.
DOB permits (last 30)
  • PL-
    UNITED PLUMBING INC
  • OT-
    WADE RAY & ASSOC CONST IN
  • OT-
    T FOX CONTRACTING INC
  • PL-
    HERTLER NADILE P & H, INC
  • OT-
    JEPOL CONSTRUCTION INC
  • OT-
    ADRIATIC PLUMBING & HEATI
  • OT-
    VECTRA CONSTRUCTION CORP
  • OT-
    SMD CONSTRUCTION INC
  • PL-
    ORION PLUMBING & HTG CORP
  • SP-
    ORION PLUMBING & HTG CORP
  • SP-
    FULTON PLBG & HTG CORP
  • SG-
    NEW YORK SIGN CONTRACTOR
  • OT-
    CLEARVIEW BLDG SVCS. INC
  • MH-
    I.I. CONTRACTING CO., INC
  • OT-
    I.I. CONTRACTING CO., INC
  • OT-
    VECTRA CONSTRUCTION CORP
  • OT-
    SWISS MANAGEMENT LTD
DOB violations
  • Feb 22, 2023FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jun 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Aug 25, 2020E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jul 6, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2018E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 30, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 2, 2006E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 2006E-ELEVATOR ELEVATORREQUIRED

More buildings in Manhattan Valley

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1018787501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jun 29, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
17 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
17 violations in the current corpus · latest record Apr 23, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Manhattan Valley market page.