CurbScoop
CurbScoopBuildingsUpper West Side240 WEST 98 STREET

240 WEST 98 STREET

Manhattan· Upper West Side· built 1923class RMBBL 1018697503

240 WEST 98 STREET is a 165-unit building in Upper West Side, Manhattan, built in 1923.

3 units are on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
165
Floors
15.0
Lot ft²
27,753 ft²
Bldg ft²
243,410 ft²
Assessed
$31.9M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
241 WEST 97 STREET #2K
Manhattan · built 1923
Upper West Side$1.79M$1,2201,471 ft²3 bd · 2 ba-69
46 HPD-C13 DOBbedbug
83.2Source
240 W 98th St #1011D
Manhattan · built 1923
Upper West Side$3.00M$1,4072,132 ft²5 bd · 3 ba-128
46 HPD-C13 DOBbedbug
83.2Source
241 WEST 97 STREET #4L
Manhattan · built 1923
Upper West Side$1.40M$1,2171,150 ft²2 bd · 1 ba-24
46 HPD-C13 DOBbedbug
83.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE PERMANENTLY INSTALLED AT DOOR AT SOUTH LEADING TO MAILBOX AREA AT PUBLIC HALL, 1st STORY
    Oct 22, 2024 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st PRIVATE HALLWAY FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT UPPER SASH AT WEST WINDOW IN THE 5th ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND SOUTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Oct 22, 2024 · VIOLATION DISMISSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICKSTAND PERMANENTLY INSTALLED AT BUILDING ENTRANCE DOOR , 1st STORY
    Oct 22, 2024 · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING, SOUTH AND EAST WALLS IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, WEST AND SOUTH WALLS IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT UPPER SASH AT SOUTH 1 WINDOW IN THE 6th ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 22, 2024 · VIOLATION DISMISSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICKSTAND PERMANENTLY INSTALLED AT VESTIBULE DOOR , 1st STORY
    Oct 22, 2024 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT UPPER SASH AT WINDOW IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING, SOUTH AND EAST WALLS IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 17365409 ISSUED 22-OCT-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Oct 22, 2024 · #5G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 HMC: REFIT UPPER SASH AT SOUTH WINDOW IN THE 5th ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATOR THAN 10 SQFT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WOOD WINDOW SASHES COMPONENTS,HEADER,JAMBS. STOOL,AND CASINGS AT 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WOOD WINDOW SASHES COMPONENTS,HEADER,JAMBS. STOOL,AND CASINGS AT WINDOW AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER AND LOWER SASHES 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). ADDITIONAL ONE NEEDED WITHIN 15 FEET OF SLEEPING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WOOD WINDOW SASHES COMPONENTS,HEADER,JAMBS. STOOL,AND CASINGS AT WINDOW AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WOOD WINDOW SASHES COMPONENTS,HEADER,JAMBS. STOOL,AND CASINGS IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WOOD WINDOW SASHES COMPONENTS,HEADER,JAMBS. STOOL,AND CASINGS AT WINDOW AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIREDOOR AT NORTH WALL IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER AND LOWER SASHS WINDOW AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER AND LOWER WINDOW PANES AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER AND LOWER SASHS AT WINDOW AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER AND LOWER SASHES AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER AND LOWER SASHES AT WINDOW AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER AND LOWER SASHS WINDOW AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''CENTER''
    Sep 22, 2024 · #5G · VIOLATION DISMISSED
DOB permits (last 30)
  • EQMar 28, 2016
    EVEREST SCAFFOLDING INC
  • FP-
    MASTER FIRE PREV. SYS INC
  • PL-
    ACCURATE MECHANICAL INC
  • OT-
    WEINREB MANAGEMENT LLC
  • MH-
    WEINREB MANAGEMENT LLC
  • OT-
    DYR-EX GENERAL CONTRC INC
  • OT-
    AMAX BUILDERS INC
  • OT-
    AUBREY FRIEDMAN
  • OT-
    WEINREB MANAGEMENT
  • PL-
    L.L.G. PLBG & HTG INC
  • PL-
    L&J PLG & HTG CO OF NY IN
  • OT-
    VLAD RESTORATION LTD
  • PL-
    DELL MECHANICAL CORP
  • OT-
    FIVE STAR EURO CONSTRUCTI
  • OT-
    NEW YORK CONSTRUCTION ASS
  • PL-
    H.K. MECHANICAL SVC CORP
  • OT-
    WE ARE SIGNS & AWNINGS IN
  • PL-
    PETER MICELI PLUMBING
  • OT-
    JELM CONTRACTOR CORP
  • EQ-
    JELM CONTRACTOR CORP
  • PL-
    ADRIATIC PLBG & HTG CORP
  • OT-
    ETNA CONTRACTING INC
  • OT-
    ETNA CONTRACTING INC
  • OT-
    ETNA CONTRACTING INC
  • PL-
    METROPOLITAN PLBG AND HTG
  • MH-
    USMAN G. BHUTTA
  • OT-
    USMAN G. BHUTTA
  • PL-
    DELL MECHANICAL CORP
  • AL-
    J&C BOINIM CORP
  • EQ-
    BIG Z BUILDERS INC
DOB violations
  • Feb 22, 2022FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Feb 22, 2022FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jun 29, 2020EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Sep 4, 2018P-PLUMBING NONE
  • Jul 7, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 13, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 13, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 13, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 11, 2018C-CONSTRUCTION OTHER OPTIONAL
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1018697503

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jul 21, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
274 permits in the current corpus · latest record Mar 28, 2016

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
275 violations in the current corpus · latest record Jun 5, 2025

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
92 violations in the current corpus · latest record Feb 22, 2022

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.