CurbScoop
CurbScoopBuildingsManhattan Valley441 CENTRAL PARK WEST

441 CENTRAL PARK WEST

Manhattan· Manhattan Valley· built 1930class D4BBL 1018400029

441 CENTRAL PARK WEST is a 120-unit building in Manhattan Valley, Manhattan, built in 1930.

2 units are on the market here right now.

City records show 30 DOB permits and 60 open violations on file.

Units (res)
120
Floors
19.0
Lot ft²
15,137 ft²
Bldg ft²
201,723 ft²
Assessed
$17.5M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
444 CENTRAL PARK WEST #16C
Manhattan · built 1930
Manhattan Valley$1.25M-0 ft²1 bd · 1 ba-63
1 HPD-C13 DOBbedbug
14.2Source
444 CENTRAL PARK WEST #18/19G
Manhattan · built 1930
Manhattan Valley$2.50M-0 ft²2 bd · 2 ba-144
1 HPD-C13 DOBbedbug
14.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2024 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 25, 2022 · #18F · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 25, 2022 · #18F · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 25, 2022 · #18F · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 25, 2022 · #18F · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 25, 2022 · #18F · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH AT NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 25, 2022 · #18F · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 25, 2022 · #18F · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Aug 25, 2022 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Aug 25, 2022 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Aug 25, 2022 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE KITCHEN LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 12, 2015 · #18F · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 12, 2015 · #18F · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 12, 2015 · #18F · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT VESTIBULE CEILING , 1st STORY
    May 12, 2015 · VIOLATION DISMISSED
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT VESTIBULE CEILING , 1st STORY
    May 12, 2015 · VIOLATION DISMISSED
  • C
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE WASH BASIN IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 3, 2013 · #4B · VIOLATION CLOSED
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 3, 2013 · #4B · VIOLATION CLOSED
  • B
    SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 3, 2013 · #4B · VIOLATION CLOSED
DOB permits (last 30)
  • MHJul 6, 2016
    PONICHTERA CONTRACTING IN
  • PLJun 14, 2012
    SENID PL & HTG CORP
  • OTJul 7, 2008
  • OTNov 1, 2006
    PREMIUM CONSTRUCTION CORP
  • OTApr 28, 1997
    J.E. ACTIVITIES INC.
  • OT-
    TROTH CONTRACTING INC
  • EQ-
    YORK SCAFFOLDING EQUIPMENT CORP.
  • OT-
    ELITE RESTORATION
  • OT-
    J.E.ACTIVITIES,INC.
  • OT-
    KAY WATERPROOFING CORP
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    POLCON CONSTRUCTION AND R
  • OT-
    POLCON CONSTRUCTION AND R
  • MH-
    POLCON CONSTRUCTION AND R
  • PL-
    ORBIT PLBG & HTG INC
  • PL-
    TAK PLUMBING & HEATING CO
  • EQ-
    OUTDOOR INSTALLATIONS LLC
  • OT-
    F.S. BUILDERS
  • PL-
    ALIENT PLBG & HTG INC
  • OT-
    ELITE RESTORATION
  • OT-
    INTERMASTER CORP
  • OT-
    NATIONAL MICROWAVE CONTRCTRS.INC
  • OT-
    HUDSON WOODWORKERS LLC
  • PL-
    ANTENUCCI MEC. INC.
  • OT-
    HUDSON WOODWORKERS LLC
  • PL-
    P.S.I. MECHANICAL
  • PL-
    A.R.L. PLUMBING & HTG LLC
  • OT-
    CONTINENTAL CONSTRUCTION
  • OT-
    A W R GROUP INC
  • OT-
    ALPHACRAFT CONSTRUCTION I
DOB violations
  • Nov 1, 2023FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Feb 21, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Nov 4, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 4, 2021E-ELEVATOR ELEVATORREQUIRED
  • Aug 12, 2020E-ELEVATOR ELEVATORREQUIRED
  • Aug 12, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 8, 2016C-CONSTRUCTION OTHER OPTIONAL
  • Apr 22, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 30, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 23, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 23, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 23, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 4, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 26, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2010VCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 7, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 7, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 7, 2010E-ELEVATOR ELEVATORREQUIRED

More buildings in Manhattan Valley

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1018400029

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Apr 9, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
214 permits in the current corpus · latest record Jul 6, 2016

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
20 violations in the current corpus · latest record Apr 8, 2024

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
85 violations in the current corpus · latest record Feb 3, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Manhattan Valley market page.