CurbScoop
CurbScoopBuildingsManhattan Valley418 CENTRAL PARK WEST

418 CENTRAL PARK WEST

Manhattan· Manhattan Valley· built 1902class R4BBL 1018377501
Open listing source

418 CENTRAL PARK WEST is an 88-unit building in Manhattan Valley, Manhattan, built in 1902.

1 unit is on the market here right now.

City records show 30 DOB permits and 69 open violations on file.

Units (res)
88
Floors
10.0
Lot ft²
11,808 ft²
Bldg ft²
72,427 ft²
Assessed
$8.99M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
418 CENTRAL PARK WEST #106
Manhattan · built 1902
Manhattan Valley$1.95M$1,4211,372 ft²2 bd · 2 ba-144
35 HPD-C4 DOBbedbug
61.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ATCEILING,EAST, AND WEST WALL IN THE KITCHEN LOCATED AT APT 47, 4th STORY
    Jul 31, 2025 · #47 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 47, 4th STORY
    Jul 31, 2025 · #47 · NOV SENT OUT
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WINDOW SASH FIRST WINDOW FROM EAST AT SOUTH IN THE 6th ROOM FROM NORTH LOCATED AT APT 25, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 21, 2024 · #25 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 25, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 21, 2024 · #25 · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 22, 2024 · #85 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. EAST WALL IN THE FOYER LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. SOUTH WALL, CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) NORTH WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE FOYER LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION DISMISSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, NORTH WALL, WEST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) SOUTH WALL IN THE FOYER LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) EAST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION DISMISSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, EAST WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 21, 2024 · #85 · VIOLATION CLOSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 85, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 14, 2024 · #85 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 48, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 20, 2023 · #48 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT HOPPER DOOR AT COMPACTOR CLOSET, 4th STORY
    Mar 17, 2023 · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    May 24, 2021 · #3 · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    May 24, 2021 · #3 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND CEILING IN THE 4th BATHROOM FROM NORTH LOCATED AT APT 68, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jun 10, 2020 · #68 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 68, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jun 10, 2020 · #68 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 68, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jun 10, 2020 · #68 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 68, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 28, 2020 · #68 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 68, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 28, 2020 · #68 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 68, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 28, 2020 · #68 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE KITCHEN LOCATED AT APT 47, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 7, 2019 · #47 · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 47, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 7, 2019 · #47 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 47, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 7, 2019 · #47 · NOT COMPLIED WITH
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORY
    Jul 27, 2018 · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL AND WINDOW FRAME IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 25, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 27, 2018 · #25 · VIOLATION DISMISSED
DOB permits (last 30)
  • OTDec 10, 2008
    TWO-TONE CONTRACTING CORP
  • EQSep 27, 2005
    BREND RENOVATION CORP.
  • EQAug 14, 1991
    COLGATE SCAFFOLDING
  • OT-
    TWO-TONE CONTRACTING CORP
  • MH-
    TWO-TONE CONTRACTING CORP
  • OT-
    ADRIATIC PLUMBING & HEATI
  • OT-
    TWO-TONE CONTRACTING CORP
  • OT-
    TAURUS CONSTRUCTION CORP
  • MH-
    TAURUS CONSTRUCTION CORP
  • OT-
    GREEN ARMY MEN LLC
  • OT-
    I & M CONSTRUCTION LLC
  • MH-
    I & M CONSTRUCTION LLC
  • OT-
    I & M CONSTRUCTION LLC
  • EQ-
    COLGATE SCAFFOLDING
  • OT-
    GARFIELD CONSTRUCTION
  • PL-
    PLUMBING & HTG DOCTOR INC
  • OT-
    BREND RENOVATION CORP
  • EQ-
    BREND RENOVATION CORP.
  • OT-
    BERDYNAK CONSTRUCTION COR
  • PL-
    F & T MECHANICAL INC
  • OT-
    GRYPHON_CONSTRUCTION LTD.
  • PL-
    PETER MICELI PLUMBING
  • PL-
    HAC PLMB & HTNG INC
  • PL-
    PETER MICELI PLUMBING
  • OT-
    L + M LARJO COMPANY, INC.
  • OT-
    COLOR AGE STORIES INC
  • PL-
    BHI INC
  • OT-
    L & M LARJO CO.,INC.
  • OT-
    MARCO POLO DESIGN CORP
  • OT-
    ADRIATIC PLUMBING & HEATI
DOB violations
  • Aug 4, 2020E-ELEVATOR ELEVATORREQUIRED
  • Aug 4, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 29, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 29, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Nov 30, 2007LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Sep 26, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 26, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 21, 2006E-ELEVATOR ELEVATORREQUIRED
  • Sep 21, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2006LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Apr 12, 2005E-ELEVATOR ELEVATORREQUIRED
  • Apr 12, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 13, 2004LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 19, 2003LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 8, 2002L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Manhattan Valley

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:1018377501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 3, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
128 permits in the current corpus · latest record Dec 10, 2008

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
166 violations in the current corpus · latest record Aug 5, 2025

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
29 violations in the current corpus · latest record Aug 4, 2020

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Manhattan Valley market page.