CurbScoop
CurbScoopBuildingsUpper West Side371 CENTRAL PARK WEST

371 CENTRAL PARK WEST

Manhattan· Upper West Side· built 1961class R4BBL 1018337502

371 CENTRAL PARK WEST is a 412-unit building in Upper West Side, Manhattan, built in 1961.

3 units are on the market here right now.

City records show 30 DOB permits and 50 open violations on file.

Units (res)
412
Floors
19.0
Lot ft²
102,811 ft²
Bldg ft²
323,725 ft²
Assessed
$29.5M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
372 CENTRAL PARK WEST #10G
Manhattan · built 1961
Upper West Side$895K$1,546579 ft²studio · 1 ba-26
1 HPD-C5 DOB
5.0Source
372 CENTRAL PARK WEST #11B
Manhattan · built 1961
Upper West Side$1.10M$1,310840 ft²1 bd · 1 ba-27
1 HPD-C5 DOB
5.0Source
372 CENTRAL PARK WEST #9A
Manhattan · built 1961
Upper West Side$1.20M-0 ft²1 bd · 1 ba-47
1 HPD-C5 DOB
5.0Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT EAST WALL IN THE BATHROOM LOCATED AT APT 20D, 20th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 2, 2020 · #20D · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REFIT SASH AT CENTER WINDOW SASH AT WEST IN THE 1st ROOM FROM NORTH LOCATED AT APT 20D, 20th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 2, 2020 · #20D · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    Aug 30, 2018 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Aug 30, 2018 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Aug 30, 2018 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Aug 30, 2018 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Aug 30, 2018 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Aug 30, 2018 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORY
    Aug 30, 2018 · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 20D, 19th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 3, 2007 · #20D · NOV SENT OUT
DOB permits (last 30)
  • PLApr 29, 2009
    C &Z MECHANICAL P & H INC
  • OTNov 5, 1998
    FARMERY,INC.
  • OTApr 13, 1998
    MICHAEL H. INGRAM
  • ALDec 1, 1997
    APL CONTRACTING GROUP INC
  • OT-
    BLUEBERRY BUILDERS LLC
  • MH-
    ELITE CONSTRUCTION
  • OT-
  • OT-
    GOLDEN I CONSTRUCTION INC
  • OT-
    LAN RENOVATION LLC
  • MH-
    GOLDEN I CONSTRUCTION INC
  • OT-
    HAMILTON AIR
  • OT-
    INCEPTION CONTRACTING &
  • PL-
    SATELLITE PLG
  • PL-
    ARISTA PLBG & HTG CORP
  • PL-
    GO PRO PLBNG AND HTG CO I
  • OT-
    BULLET CONSTRUCTION
  • OT-
    EM & EM CHIMNEY AND MASON
  • OT-
    PREMCO CONTR CORP
  • AL-
    PREMCO CONTR CORP
  • OT-
    BENJAMIN.BRKLJACA
  • OT-
    PLAQUE CONTRACTING CORP
  • OT-
    DNA CONSTRUCTION CORP
  • OT-
    DREW CONSTRUCTION CO INC
  • OT-
    THEODORE GARCIA GENERAL CONTRACT
  • MH-
    THEODORE GARCIA GENERAL CONTRACT
  • PL-
    WALTER J GRANDE PLG HTG
  • PL-
    SATELLITE PLUMBING
  • OT-
    SJB INTER.. INC
  • MH-
    SJ B INTER. INC.
  • OT-
    OLIVE CONTRACTING CORP
DOB violations
  • Aug 1, 2024FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • May 3, 2024BENCH-FAILURE TO BENCHMARK NONE
  • Feb 21, 2024FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Nov 10, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 10, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 10, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 10, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 27, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 15, 2010AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 7, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 7, 2010E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1018337502

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jun 4, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
172 permits in the current corpus · latest record Apr 29, 2009

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
10 violations in the current corpus · latest record Dec 3, 2020

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
64 violations in the current corpus · latest record Aug 12, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.