CurbScoop
CurbScoopBuildingsCentral Harlem2070 5 AVENUE

2070 5 AVENUE

Manhattan· Central Harlem· built 1880class C0BBL 1017250137
Open listing source

2070 5 AVENUE is a 3-unit building in Central Harlem, Manhattan, built in 1880.

CurbScoop has 1 recorded sale on this tax lot, most recently $2.37M on Aug 11, 2026.

1 of those closed in the last five years, at a median of $2.37M.

1 unit is on the market here right now.

City records show 8 DOB permits and 21 open violations on file.

Units (res)
3
Floors
4.0
Lot ft²
1,425 ft²
Bldg ft²
4,943 ft²
Assessed
$203K
DOF total
Comps L5y
1
median $2.37M

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
2070 FIFTH AVENUE #1
Manhattan · built 1880
Central Harlem$2.40M$4625,200 ft²10 bd · 8 ba+1.3%75
1 HPD-Cbedbug
8.9Source

Transaction history (1)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
Sep 9, 2026-DEED$2.37M

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 29, 2026 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2024 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING., 1st STORY
    Oct 13, 2016 · NOV CERTIFIED LATE
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. , 1st STORY
    Oct 13, 2016 · NOV CERTIFIED LATE
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL , 1st STORY
    Oct 13, 2016 · NOV CERTIFIED LATE
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL , 1st STORY
    Oct 13, 2016 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER., 1st STORY
    Oct 13, 2016 · NOV CERTIFIED LATE
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY
    Oct 13, 2016 · NOV CERTIFIED LATE
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL , 1st STORY
    Oct 13, 2016 · NOV CERTIFIED LATE
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 12, 2013 · #1 · NOV SENT OUT
  • B
    § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 12, 2013 · #1 · NOV SENT OUT
DOB permits (last 30)
  • AL-
    TOMASZ CONST CORP
  • PL-
    ADVANCE PLUMBING & HTG
  • AL-
    TOMASZ CONST CORP
  • MH-
    TOMASZ CONSTR. CORP.
  • OT-
    JUBILEE GENERAL CONSTRUCTION
  • OT-
    TOMASZ CONST CORP
  • PL-
  • AL-
    G.T. GENERAL CONSTRUCTION INC.
DOB violations
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 7, 2000LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 16, 1999LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Central Harlem

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1017250137

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Mar 12, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
1 recorded deed in the current corpus · latest record Sep 9, 2026

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
8 permits in the current corpus

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
11 violations in the current corpus · latest record May 6, 2026

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
10 violations in the current corpus · latest record Aug 27, 2004

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Central Harlem market page.