49 EAST 96 STREET
Units (res)
75
Floors
19.0
Lot ft²
10,183 ft²
Bldg ft²
141,058 ft²
Assessed
$13.9M
DOF total
Comps L5y
0
Active sale listings (2)
| Address | Neighborhood | Price | $/ft² | Sqft | Beds/Baths | vs comp | DOM | Risk | Score | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 49 EAST 96 STREET #17A Manhattan · built 1939 | Carnegie Hill | $1.88M | - | 0 ft² | 2 bd · 2 ba | - | 21 | 1 HPD-Cbedbug | 7.8 | Source | |
| 49 EAST 96 STREET #4B Manhattan · built 1939 | Carnegie Hill | $950K | - | 0 ft² | 2 bd · 1 ba | - | 88 | 1 HPD-Cbedbug | 7.8 | Source |
Transaction history (0)
Every recorded deed for this tax lot.
No recorded transactions for this BBL yet.
Building risk + activity
HPD violations (last 40)
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 4, 2025 · VIOLATION DISMISSED
- A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORYMay 25, 2024 · VIOLATION DISMISSED
- A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYMay 25, 2024 · VIOLATION DISMISSED
- A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYMay 25, 2024 · VIOLATION DISMISSED
- C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORYMay 25, 2024 · VIOLATION DISMISSED
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Apr 1, 2024 · VIOLATION DISMISSED
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Mar 15, 2023 · VIOLATION DISMISSED
DOB permits (last 30)
- OTOct 10, 2018DL RESTORATION & BUILDERS
- OTNov 20, 2009GREAT BAY CONTRACTING INC
- PLNov 15, 2007CORIOLIS EFFECT INC
- MHMar 14, 2006HITE CONSTRUCTION INC
- PLDec 31, 1997PRONTO PLBG & HTG CORP
- ALOct 4, 1991KANO CONSTRUCTION
- PL-ADRIATIC PLBG & HTG CORP
- OT-AKI RENOVATIONS GROUP, IN
- PL-ORBIT PLBG & HTG INC
- MH-MOUNTAIN AIR MECH. INC.
- OT-MOUNTAIN AIR MECH. INC.
- PL-FOUR STAR MECH.
- PL-AMD &.ASSOCIATES INC
- PL-CC CONTROLLED PLBG CO INC
- PL-RIGID PLBG
- PL-QMB PLUMBING & HEATING IN
- MH-CUBICULUM HOME INC
- OT-CUBICULUM HOME INC
- FB-CONTROLLED COMBUSTION
- PL-EP PLG CO
- PL-ADRIANO PLMBG & HTG CORP
- OT-CM RENOVATION
- MH-CM RENOVATION
- OT-BULTRA,INC
- MH-BULTRA,INC
- OT-HITE CONSTRUCTION INC
- MH-HITE CONSTRUCTION INC
- MH-INTERIOR TRANSFORMATION INC
- OT-INTERIOR TRANSFORMATION INC
- EQ-VERTICAL SCAFFOLD LLC