CurbScoop
CurbScoopBuildingsCarnegie Hill9 EAST 96 STREET

9 EAST 96 STREET

Manhattan· Carnegie Hill· built 1926class D4BBL 1016020009
Open listing source

9 EAST 96 STREET is a 47-unit building in Carnegie Hill, Manhattan, built in 1926.

1 unit is on the market here right now.

City records show 30 DOB permits and 39 open violations on file.

Units (res)
47
Floors
16.0
Lot ft²
7,317 ft²
Bldg ft²
73,125 ft²
Assessed
$7.46M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
9 EAST 96 STREET #PH
Manhattan · built 1926
Carnegie Hill$5.50M$2,1482,560 ft²4 bd · 4 ba-480
6 DOBbedbug
9.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 16B, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jan 21, 2015 · #16B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 3rd BATHROOM FROM NORTH AT EAST LOCATED AT APT 16B, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jan 21, 2015 · #16B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE BATHROOM FROM NORTH LOCATED AT APT 16B, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jan 21, 2015 · #16B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 16B, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jan 21, 2015 · #16B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 16B, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jan 21, 2015 · #16B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE 4th ROOM FROM NORTH AT CENTER LOCATED AT APT 16B, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jan 21, 2015 · #16B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 3rd BATHROOM FROM NORTH AT WEST LOCATED AT APT 16B, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jan 21, 2015 · #16B · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 14B, 14th STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 2, 2007 · #14B · NOV SENT OUT
  • B
    D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING CHAIN DOOR GUARD 15 STY SOUTH APT 15A AT ENTRANCE DOOR. , SECTION '' ''
    Aug 22, 1997 · #15A · NOV SENT OUT
  • A
    SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SKYLIGHTS REMOVE REAR OF BLDG EXTERIOR.
    Aug 22, 1997 · NOT COMPLIED WITH
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 15 STY SOUTH APT 16A 2 ROOM FROM WEST AT SOUTH. , SECTION '' ''
    Aug 22, 1997 · #16A · NOT COMPLIED WITH
  • A
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BATHTUB BARREL STOPPER 14 STY FRONT EAST APT 14B SOUTHEAST BATHROOM. , SECTION '' ''
    Jul 19, 1995 · #14B · NOV SENT OUT
  • B
    D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE SASHES AT ALL STY FIRE STAIR.
    Jul 19, 1995 · NOV SENT OUT
DOB permits (last 30)
  • PLAug 20, 2014
    ORBIT PLBG & HTG INC
  • OTJan 22, 2004
    TOWER BUILDING GROUP
  • PLJan 12, 2001
    R & A HEATING& CONTRACTING
  • OTJan 9, 1995
    L.& M.MARJO CO INC
  • PLDec 29, 1994
    BELMAR PLUMBING & HEATING
  • OT-
    ZORIC CONSTRUCTION
  • PL-
    PAL-MAR PLBG & HTG INC
  • OT-
    L & Z RESTORATION CORP
  • OT-
    GREAT BAY CONTRACTING INC
  • OT-
    PUMA CONSTRUCTION CORP
  • PL-
    JULIAN PLBG & HTG CORP
  • EQ-
    L & Z RESTORATION CORP
  • OT-
    VAN GOGH PAINTING CORP
  • OT-
    GREENPOINT WOODWORKING
  • PL-
    R & A HEATING& CONTRACTING
  • OT-
    GREAT BAY CONTRACTING INC
  • PL-
    MCCREADY AND RICE PLBG
  • PL-
    M&A PLUMBING
  • OT-
    PIZZO BROTHERS INC
  • OT-
    SGC CONTRACTING CORP
  • MH-
    SGC CONTRACTING CORP
  • OT-
    MONACO GROUP USA INC
  • OT-
    RICHARDSON & LUCAS,INC.
  • OT-
    MONACO GROUP USA INC
  • OT-
    STANDARD WATERPROOFING C
  • PL-
    ADRIATIC PLBG & HTG CORP
  • PL-
    PSEC PLBG & HTG CORP
  • OT-
    CASPER & GAMBINI ENTPRS C
  • AL-
    ALL CONSTRUCTION LCORP
  • OT-
    NOVA RESTORATION ,INC.
DOB violations
  • May 15, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 5, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2016C-CONSTRUCTION OTHER OPTIONAL
  • Dec 22, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 22, 2015E-ELEVATOR ELEVATORREQUIRED
  • Nov 4, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 4, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2013C-CONSTRUCTION OTHER OPTIONAL
  • Aug 20, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Dec 10, 2002E-ELEVATOR ELEVATORREQUIRED
  • Dec 10, 2002E-ELEVATOR ELEVATORREQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 12, 1999E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 1999E-ELEVATOR ELEVATORREQUIRED
  • Apr 7, 1992LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jul 12, 1991E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 1990E-ELEVATOR ELEVATORREQUIRED
  • May 11, 1990E-ELEVATOR ELEVATORREQUIRED
  • May 11, 1990E-ELEVATOR ELEVATORREQUIRED

More buildings in Carnegie Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1016020009

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Feb 21, 2025

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
132 permits in the current corpus · latest record Aug 20, 2014

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
13 violations in the current corpus · latest record Jan 26, 2015

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
26 violations in the current corpus · latest record Nov 6, 2024

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Carnegie Hill market page.