CurbScoop
CurbScoopBuildingsCarnegie Hill1150 5 AVENUE

1150 5 AVENUE

Manhattan· Carnegie Hill· built 1924class D4BBL 1016020001
Open listing source

1150 5 AVENUE is a 74-unit building in Carnegie Hill, Manhattan, built in 1924.

1 unit is on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
74
Floors
15.0
Lot ft²
15,138 ft²
Bldg ft²
163,969 ft²
Assessed
$19.6M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1150 5 AVENUE #3B/2B
Manhattan · built 1924
Carnegie Hill$8.99M-0 ft²5 bd · 5 ba-55
6 HPD-C11 DOBbedbug
21.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR north wall and ceiling IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ceiling and south wall IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT NORTHEAST
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR missing IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE slopping wood floor IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2026 ADM CODE REPLACE WITH NEW THE DEFECTIVE FLUSH PIPE OF WATER CLOSET ,,, IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). missing IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... aprox 20sq ft 6 sq ft at ceiling 12 sq ft at north wall IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK at ceiling and north wall IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE METAL BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ceiling IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 16, 2020 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Aug 21, 2019 · VIOLATION CLOSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Aug 21, 2019 · VIOLATION CLOSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Aug 21, 2019 · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Aug 21, 2019 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Aug 21, 2019 · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Aug 21, 2019 · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Aug 21, 2019 · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION STANDING BARREL WASTE STOPPER TO TUB IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILING IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2018 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN BATHROOM IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Apr 5, 2017 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES IN BATHROOM IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Apr 5, 2017 · #3E · VIOLATION CLOSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES IN BATHROOM IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Apr 5, 2017 · #3E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE REFRIGERATOR DOOR GASKET IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Apr 5, 2017 · #3E · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Dec 6, 2016 · #3E · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 24, 2016 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC FLOOR TILES AT SOUTH BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Oct 14, 2015 · #4C · VIOLATION CLOSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Oct 14, 2015 · VIOLATION CLOSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL, 1st STORY
    Oct 14, 2015 · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Oct 14, 2015 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 14, 2015 · VIOLATION CLOSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 9; WG TO REPAIR = 0; WG TO REPLACE = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Oct 14, 2015 · #4C · VIOLATION DISMISSED
DOB permits (last 30)
  • OTOct 12, 2004
    TIERRA LIMITED
  • PLOct 16, 2003
    HARVARD HTG AND PLBG
  • EQJan 6, 2000
    HOISTING AND SCAFFOLDING
  • PLAug 1, 1997
    JOHN CATANIA PLG
  • PLDec 31, 1996
    PREFERRED MECHANICAL INC
  • OTDec 17, 1996
    SHEENAN & SCOTT CONSTRUCTION
  • MH-
    HAMILTON AIR COMPANY, INC
  • EQ-
    PHEONIX 132 SUTTON STREET
  • PL-
    MACREDDIN PLBG & HTG INC
  • OT-
    PRODIGY CONSTRUCTION INC
  • EQ-
    PHOENIX 132 SUTTON STREET
  • OT-
    JR GRECH CONSTRUCTION CORP
  • PL-
    GRAHAM PLUMBING CO., INC
  • PL-
    ABR PLBG&HTG CONTR INC
  • OT-
    EURO GROUP DESIGN GROUP
  • OT-
    OPTIMUM CONSTRUCTION, INC
  • PL-
    SPARTUM PLG & HTG
  • OT-
    CONSTRUCTIONS DEVELOPMENT SYSTEM
  • OT-
    RATIONAL BUILDING
  • MH-
    HAMILTON AIR COMPANY, INC
  • EQ-
    XINOS CONSTRUCTION CORP
  • OT-
    VBS ASSOCIATES LLC
  • OT-
    MAXI CONST.
  • MH-
    GATEWAY ENTERPRISES INC
  • OT-
    GATEWAY ENTERPRISE
  • PL-
    S.K. PIPING & HEATING COR
  • PL-
    PETER PLUMBING ASSOC. INC
  • MH-
    NORTH RIVER CONST.,INC..
  • OT-
    NORTH RIVER CONST.,INC..
  • EQ-
    HOISTING AND SCAFFOLDING
DOB violations
  • Dec 1, 2024EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Mar 3, 2019P-PLUMBING NONE
  • Nov 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Dec 2, 2016E-ELEVATOR ELEVATORREQUIRED
  • Dec 2, 2016E-ELEVATOR ELEVATORREQUIRED
  • Dec 2, 2016E-ELEVATOR ELEVATORREQUIRED
  • Dec 2, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Nov 1, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 1, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 1, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 1, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 27, 2009LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Apr 2, 2007LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Nov 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2005LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Dec 10, 2002E-ELEVATOR ELEVATORREQUIRED
  • Dec 10, 2002E-ELEVATOR ELEVATORREQUIRED

More buildings in Carnegie Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1016020001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 10, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
299 permits in the current corpus · latest record Oct 12, 2004

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
57 violations in the current corpus · latest record Mar 3, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
58 violations in the current corpus · latest record Jun 16, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Carnegie Hill market page.