CurbScoop
CurbScoopBuildingsYorkville60 EAST END AVENUE

60 EAST END AVENUE

Manhattan· Yorkville· built 1973class D4BBL 1015790023
Open listing source

60 EAST END AVENUE is a 123-unit building in Yorkville, Manhattan, built in 1973.

1 unit is on the market here right now.

City records show 30 DOB permits and 40 open violations on file.

Units (res)
123
Floors
42.0
Lot ft²
24,374 ft²
Bldg ft²
345,242 ft²
Assessed
$43.0M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
60 EAST END AVENUE #21A
Manhattan · built 1973
Yorkville$1.80M-0 ft²2 bd · 2 ba-510
5 DOBbedbug
9.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
None.
DOB permits (last 30)
  • PLNov 17, 2000
    WW & SONS PLBG & HTG INC
  • PLMar 25, 1998
    AM PLBG CO
  • PL-
    CC CONTROLLED PLBG CO INC
  • OT-
    POLER CONTRACTING INC
  • EQ-
    PHEONIX 132 SUTTON STREET
  • OT-
    BANNER CONSTRUCTION CORP
  • PL-
    PSG PLG CO
  • PL-
    HAG PLUMBING & HTG, INC
  • OT-
    NOVA CONTRACTINR CORP.
  • OT-
    POWER CONSULT.
  • PL-
    FIVE STAR P&H CO,INC
  • OT-
    ZOOM CONTRACTING INC
  • OT-
    ZOOM CONTRACTING INC
  • MH-
    CENTRAL ABSORPTION
  • OT-
    CENTRAL ABSORPTION
  • MH-
    BANNER CONSTRUCTION CORP
  • OT-
    KAY WATERPROOFING
  • PL-
    DONATO, INC
  • MH-
    PETER COSOLA INC.
  • MH-
    PRIME THERMACO
  • OT-
    PRIME THERMACO
  • OT-
  • PL-
    H.A.G PLUMBING & HTG INC
  • OT-
    GDC
  • MH-
    GDC
  • PL-
    GARDNER CONTR. DBA HOFFMAN
  • OT-
    A & Z CONSTRUCTION SERVICES
  • MH-
    A & Z CONSTRUCTION SERVICES
  • MH-
    VALLEY CONSTRUCTION SVCS*
  • FS-
    C C CONTROLLED COMBUSTION
DOB violations
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Oct 17, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 7, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 24, 2018P-PLUMBING NONE
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Oct 23, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 23, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Oct 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Oct 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Sep 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 18, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 18, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 29, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 29, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 21, 2009E-ELEVATOR ELEVATORREQUIRED

More buildings in Yorkville

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1015790023

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Feb 19, 2025

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
186 permits in the current corpus · latest record Nov 17, 2000

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
56 violations in the current corpus · latest record Sep 23, 2022

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Yorkville market page.