CurbScoop
CurbScoopBuildingsCarnegie Hill108 EAST 87 STREET

108 EAST 87 STREET

Manhattan· Carnegie Hill· built 1939class RMBBL 1015157501

108 EAST 87 STREET is a 64-unit building in Carnegie Hill, Manhattan, built in 1939.

2 units are on the market here right now.

City records show 30 DOB permits and 62 open violations on file.

Units (res)
64
Floors
13.0
Lot ft²
7,520 ft²
Bldg ft²
49,627 ft²
Assessed
$7.94M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
120 EAST 87 STREET #R14K
Manhattan · built 1939
Carnegie Hill$675K$1,350500 ft²studio · 1 ba-131
3 HPD-C12 DOBbedbug
16.7Source
110 EAST 87 STREET #9D
Manhattan · built 1939
Carnegie Hill$850K$1,206705 ft²1 bd · 1 ba-70
3 HPD-C12 DOBbedbug
16.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jun 17, 2023 · #7C · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 14, 2020 · #7A · NOTICE OF ISSUANCE SENT TO TENANT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Sep 11, 2020 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Sep 11, 2020 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Sep 11, 2020 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Sep 11, 2020 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Sep 11, 2020 · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 6, 2017 · VIOLATION DISMISSED
  • C
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS AT UPPER SASH WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 10F, 10th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 7, 2008 · #10F · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 10F, 10th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 7, 2008 · #10F · NOV SENT OUT
  • A
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 10F, 10th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 7, 2008 · #10F · NOV SENT OUT
  • A
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 10F, 10th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 7, 2008 · #10F · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASHBASIN IN THE BATHROOM LOCATED AT APT 10F, 10th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 7, 2008 · #10F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 10F, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Aug 4, 2008 · #10F · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 10F, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Aug 4, 2008 · #10F · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SINK IN THE KITCHEN LOCATED AT APT 10F, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Aug 4, 2008 · #10F · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 10F, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Aug 4, 2008 · #10F · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LUVERS LOWER EAST WINDOW REAR UPPER BULKHEAD WALL AT ROOF.
    Apr 23, 1996 · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT INTERIOR WALLS OF LOWER LEVEL OF ELEVATOR MOTOR ROOM ON ROOF.
    Apr 23, 1996 · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING REAR YARD AND COURT.
    Apr 23, 1996 · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT WALL AT EAST OF REAR YARD.
    Apr 23, 1996 · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE DOOR KNOB OF TERRACE DOOR 11 STY NORTHEAST APT 11A. LOCATED AT APT 11A
    Apr 23, 1996 · #11A · NOV SENT OUT
DOB permits (last 30)
  • EQOct 23, 2000
    TOWER BUILDING RESTOR.
  • OT-
    ALIGN RENOVATION INC
  • MH-
    FEROX INC
  • OT-
    C C CONTROLLED COMBUSTION
  • OT-
    JMK SOLUT. INC.
  • OT-
    FORTE RENOVATIONS LLC
  • PL-
    M.T.H.L. CO.
  • OT-
    ALIGN RENOVATION INC
  • PL-
    HAG PLUMBING & HTG, INC
  • OT-
    FORTE RENOVATIONS LLC
  • OT-
    POLTEAM INC
  • OT-
    MOBILI DE ANGELIS CORP
  • PL-
    NEW AMSTERDAM PLBG & HTG
  • OT-
    FEROX INC
  • FS-
    C C CONTROLLED COMBUSTION
  • PL-
    ALL-BORO SEWER AND DRAIN
  • OT-
    C SQUARED CONSTRACTING INC
  • OT-
    OTTE CONSTRUCTION SVCS IN
  • PL-
    GREGG NY PLUMBING, INC
  • PL-
    ASSOCIATED MECH.
  • PL-
    DONATO INC
  • OT-
    TOWER BUILDING RESTORATION
  • BL-
    MICHEAL BENDOUYA/CONTROLLED COMB
  • FB-
    MICHEAL BENDOUYA/CONTROLLED COMB
  • PL-
    NEW YORK PARK PLBG&HTG CO
  • OT-
    SKYLINE RESTORATION INC
  • OT-
    POLTEAM INC
  • OT-
    W W CORNERSTONE LLC
  • OT-
    FORTE RENOVATIONS LLC
  • OT-
    ALIGN RENOVATION INC
DOB violations
  • Dec 1, 2024EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • May 3, 2024BENCH-FAILURE TO BENCHMARK NONE
  • Dec 1, 2023EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Aug 21, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Feb 20, 2022FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Feb 20, 2022FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Feb 20, 2022FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Apr 29, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Dec 14, 2020E-ELEVATOR ELEVATORREQUIRED
  • Dec 14, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 29, 2020EARCX-FAILURE TO SUBMIT EER NONE
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 13, 2019E-ELEVATOR ELEVATORREQUIRED
  • Oct 10, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Sep 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Mar 27, 2018EARCX-FAILURE TO SUBMIT EER NONE
  • Sep 20, 2017E-ELEVATOR ELEVATORREQUIRED
  • Sep 20, 2017E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 14, 2016EARCX-FAILURE TO SUBMIT EER NONE
  • Oct 7, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 7, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 19, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jan 20, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 20, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 5, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 5, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 30, 2007LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 23, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2006LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Nov 18, 2005E-ELEVATOR ELEVATORREQUIRED

More buildings in Carnegie Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1015157501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 18, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 13, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
61 permits in the current corpus · latest record Oct 23, 2000

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
22 violations in the current corpus · latest record Jun 20, 2023

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
43 violations in the current corpus · latest record Jul 20, 2026

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Carnegie Hill market page.