CurbScoop
CurbScoop›Buildings›28 EAST 94 STREET

28 EAST 94 STREET

Manhattan· built 1900class D4BBL 1015050056
Open listing source

Your first look at this property

A free brief from the records below. Start here, then check the evidence.

Building overview

28 EAST 94 STREET is a 40-unit building in Manhattan, built in 1900.

1 unit is on the market here right now.

City records show 30 DOB permits and 22 violation records on file.

Units (res)
40
Floors
7.0
Lot ft²
8,860 ft²
Bldg ft²
51,912 ft²
Assessed
$4.76M
DOF FY2027 final roll
Deeds on this lot · 5 years
Unavailable
Excludes nearby comparable buildings

Official taxes & valuations

$10,568,000.00 · DOF market valueWhole tax lot · BBL 1015050056

FY2026–27 final assessment roll · Extract 2026-05-15

-4.2% change in DOF market value from the prior year.

Land value
$1,890,000.00
Building/improvement value
$8,678,000.00
Actual assessed value
$4,755,600.00
Assessed land
$850,500.00
Transitional assessed value
$4,461,130.00
Actual assessed-value exemptions
$19,870.00
Billable assessment before exemptions
$4,461,130.00
Billable assessed-value exemptions
$19,870.00
Taxable assessment after exemptions
$4,441,260.00
FY2025–26 DOF market value
$11,027,000.00
Prior-year actual assessed value
$4,962,150.00
Prior-year taxable assessment
$4,424,500.00

DOF values are used for property taxation. Condo and co-op tax valuations can differ substantially from sale prices. This is a tax-purpose estimate; comparable sales remain a separate valuation source. Roll exemptions can include STAR under DOF’s published layout.

These values cover the whole tax lot and do not value individual co-op shares.

Official DOF final assessment roll (ZIP) ↗
$473,024.96/yr · $39,418.75/mo equivalentWhole tax lot · BBL 1015050056

FY2026–27 · DOF statement 2026-08-15 · 28 EAST 94 STREET

The printed annual tax already deducts $81,895.00 in abatements and/or STAR.

Billable assessment on this statement
$4,461,130.00
Tax rate on this statement
12.4390%
Annual tax before abatements/STAR
$554,919.96
Monthly equivalent before abatements/STAR
$46,243.33

The before-abatement amount adds the printed deduction back to the annual tax, holding the assessment and rate unchanged. It does not predict benefit expiration, future taxes or a buyer’s eligibility.

DOF tax-purpose market value on this statement: $10,568,000.00.

Named benefits on the statement
Basic Star - School Tax Relief 3 units $807.00
Enhanced Star - School Tax Relief 2 units $1,294.00
Co-op/Condo Abatement 29 units $79,794.00

This covers the whole tax lot. Co-op building taxes cannot be added to an apartment’s maintenance or divided among its units.

Read official DOF tax bill ↗
How we calculate your annual taxes:
Billable assessed value: $4,461,130.00
times the current tax rate: x 12.4390%
minus abatements and/or STAR: – $81,895.00
Annual property tax: $473,024.96

HOA, common charges and maintenance require documented building or unit evidence. Sales and DOB records do not establish these amounts. A zero property-tax bill does not establish zero PILOT or other ownership charges. Bills may change with tax rates or benefits; monthly figures are annual equivalents.

Look up this tax lot at DOF ↗

Public building financial filings

NY Attorney General offering plans and amendments can document budgets, financial statements, reserves and sponsor obligations. These records cover the development, including properties without active listings.

No exact offering-plan match has been collected here yet. Eligible condo and co-op properties are queued when viewed. Missing filings do not establish zero fees, assessments or debt.

Search the official NYAG offering-plan database ↗

Tax-benefit schedules, statement balances, penalties and declared capital work cover the identified tax lot. Condo billing-lot evidence is shown separately from apartment evidence.

DOF published abatements & termsTax lot 1015050056

Tax benefits & expiration

Reported itemValuePeriod & scope
COOP · Published benefit begin date
Evidence

{"actabtpcyc": "0.00", "actabtpyr": "0.00", "appliedabt": "79793.99", "appseq": "23", "appstat": "A", "caseno": "2535", "extractdt": "2026-08-15T00:00:00.000", "parid": "1015050056", "period": "2Q", "rate_pct": "0.001750", "taxyr": "2027", "tccode": "COOP", "tcsubcode": "C1", "yearabtpct": "0.000000", "yrbegdt": "1996-07-01T00:00:00.000"}

Tax benefit; do not add as a cost

Open official source ↗
1996-07-01As of 2026-08-15
FY2027 2Q
Published schedule · exact tax lot
COOP · Source applied abatement
Evidence

{"actabtpcyc": "0.00", "actabtpyr": "0.00", "appliedabt": "79793.99", "appseq": "23", "appstat": "A", "caseno": "2535", "extractdt": "2026-08-15T00:00:00.000", "parid": "1015050056", "period": "2Q", "rate_pct": "0.001750", "taxyr": "2027", "tccode": "COOP", "tcsubcode": "C1", "yearabtpct": "0.000000", "yrbegdt": "1996-07-01T00:00:00.000"}

Tax benefit; do not add as a cost

Open official source ↗
$79,793.99As of 2026-08-15
FY2027 2Q
Source reported · exact tax lot
COOP · source eligibility / application status
Evidence

{"actabtpcyc": "0.00", "actabtpyr": "0.00", "appliedabt": "79793.99", "appseq": "23", "appstat": "A", "caseno": "2535", "extractdt": "2026-08-15T00:00:00.000", "parid": "1015050056", "period": "2Q", "rate_pct": "0.001750", "taxyr": "2027", "tccode": "COOP", "tcsubcode": "C1", "yearabtpct": "0.000000", "yrbegdt": "1996-07-01T00:00:00.000"}

Tax benefit; do not add as a cost

Open official source ↗
appstat=AAs of 2026-08-15
FY2027 2Q
Source reported · exact tax lot

FY2027 2Q source abatement terms, dated 2026-08-15. Dates and amounts do not guarantee eligibility after purchase. Per-cycle amounts are not annualized; overlapping calculations are not summed.

Published benefit amounts and dates do not guarantee eligibility after a purchase. An end date alone does not establish the future tax bill; assessment, tax rate and other benefits may change.

Source updated 2026-10-05 · collected 2026-10-09.

Open official source ↗
DOF statement balancesTax lot 1015050056

Public balances & charges

Reported itemValuePeriod & scope
Outstanding charges
Evidence

Outstanding charges $0.00

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-08-15
Source reported · exact tax lot
New charges this billing period
Evidence

New charges $118,413.37

Separate dated balance; do not add to annual costs

Open official source ↗
$118,413.37As of 2026-08-15
Source reported · exact tax lot
Statement amount due
Evidence

Amount Due 10/01/26: $118,413.37

Separate dated balance; do not add to annual costs

Due date: 2026-10-01

Open official source ↗
$118,413.37As of 2026-08-15
Source reported · exact tax lot
Department of Finance Total
Evidence

Department of Finance Total $118,413.37

May be in statement balance; do not add twice

Open official source ↗
$118,413.37As of 2026-08-15
Source reported · exact tax lot
Department of Housing Preservation and Development Total
Evidence

Department of Housing Preservation and Development Total $0.00

May be in statement balance; do not add twice

Open official source ↗
$0.00As of 2026-08-15
Source reported · exact tax lot
Tax Commission Total
Evidence

Tax Commission Total $0.00

May be in statement balance; do not add twice

Open official source ↗
$0.00As of 2026-08-15
Source reported · exact tax lot

Source updated 2026-08-15 · collected 2026-10-10.

Open official source ↗
DOB energy disclosureTax lot 1015050056

Penalties, energy & capital work

Reported itemValuePeriod & scope
LL84 reported location-based emissions
Evidence

{"property_id": "2921089", "year_ending": "2024-12-31T00:00:00.000", "nyc_borough_block_and_lot": "1015050056", "number_of_buildings": "1", "metered_areas_energy": "Whole Property", "total_location_based_ghg": "210.64", "property_gfa_self_reported": "53612"}

Reported metric; not a fine

Open official source ↗
210.64 tonnes CO2e2024
Historical actual · reported property / campus
LL84 reported gross floor area
Evidence

{"property_id": "2921089", "year_ending": "2024-12-31T00:00:00.000", "nyc_borough_block_and_lot": "1015050056", "number_of_buildings": "1", "metered_areas_energy": "Whole Property", "total_location_based_ghg": "210.64", "property_gfa_self_reported": "53612"}

Reported metric; not a fine

Open official source ↗
53,612 ft²2024
Historical actual · reported property / campus
LL84 reported location-based emissions
Evidence

{"property_id": "2921089", "year_ending": "2023-12-31T00:00:00.000", "nyc_borough_block_and_lot": "1-01505-0056", "number_of_buildings": "1", "metered_areas_energy": "Whole Property", "total_location_based_ghg": "202.7", "property_gfa_self_reported": "53612"}

Reported metric; not a fine

Open official source ↗
202.7 tonnes CO2e2023
Historical actual · reported property / campus
LL84 reported gross floor area
Evidence

{"property_id": "2921089", "year_ending": "2023-12-31T00:00:00.000", "nyc_borough_block_and_lot": "1-01505-0056", "number_of_buildings": "1", "metered_areas_energy": "Whole Property", "total_location_based_ghg": "202.7", "property_gfa_self_reported": "53612"}

Reported metric; not a fine

Open official source ↗
53,612 ft²2023
Historical actual · reported property / campus
LL84 reported location-based emissions
Evidence

{"property_id": "2921089", "year_ending": "2022-12-31T00:00:00.000", "nyc_borough_block_and_lot": "1-01505-0056", "number_of_buildings": "1", "metered_areas_energy": "Whole Property", "total_location_based_ghg": "207.7", "property_gfa_self_reported": "53612"}

Reported metric; not a fine

Open official source ↗
207.7 tonnes CO2e2022
Historical actual · reported property / campus
LL84 reported gross floor area
Evidence

{"property_id": "2921089", "year_ending": "2022-12-31T00:00:00.000", "nyc_borough_block_and_lot": "1-01505-0056", "number_of_buildings": "1", "metered_areas_energy": "Whole Property", "total_location_based_ghg": "207.7", "property_gfa_self_reported": "53612"}

Reported metric; not a fine

Open official source ↗
53,612 ft²2022
Historical actual · reported property / campus

Complete published 2022–2024 LL84 dataset. Reported property/campus scope can include several buildings and lots; these are not LL97 issued fines.

Reported energy figures may cover several buildings or lots. They are not verified LL97 emissions, a penalty calculation, or this apartment’s utility bill.

Source updated 2025-11-25 · collected 2026-10-09.

Open official source ↗
DOB declared construction workTax lot 1015050056

Penalties, energy & capital work

Reported itemValuePeriod & scope
Declared construction estimate · M01382798-I1-SC#1
Evidence

Installation of suspended scaffold for facade work or inspection.

Estimate; not an apartment assessment

Open official source ↗
$0.00As of 2026-04-21
Declared estimate · exact tax lot
Declared construction estimate · M01383940-I1-SF#1
Evidence

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Estimate; not an apartment assessment

Open official source ↗
$1.00As of 2026-04-20
Declared estimate · exact tax lot
Declared construction estimate · M01386452-I1-SH#1
Evidence

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

Estimate; not an apartment assessment

Open official source ↗
$1,000.00As of 2026-04-17
Declared estimate · exact tax lot
Declared construction estimate · M01364361-I1-GC#1
Evidence

FACADE REPAIRS TO INCLUDE MASONRY, POINTING, LINTELS, TERRACOTTA AS PER PLANS.

Estimate; not an apartment assessment

Open official source ↗
$159,250.00As of 2026-03-09
Declared estimate · exact tax lot
Declared construction estimate · M00946324-S1-PL#1
Evidence

PLUMBING FOR THE RENOVATION OF AN EXISTING APARTMENT #34 ON THE 3RD FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.

Estimate; not an apartment assessment

Open official source ↗
$27,700.00As of 2023-12-14
Declared estimate · exact tax lot
Declared construction estimate · M00946324-I1-GC#1
Evidence

GENERAL CONSTRUCTION FOR THE RENOVATION OF AN EXISTING APARTMENT #34 ON THE 3RD FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.

Estimate; not an apartment assessment

Open official source ↗
$78,000.00As of 2023-12-13
Declared estimate · exact tax lot
Declared construction estimate · M00865176-I1-GC#1
Evidence

GENERAL CONSTRUCTION SCOPE OF WORK: ( RENOVATION DIR 14 ALT 2)MINOR NON-STRUCTURAL PARTITION REMOVAL, NEW FINISH FLOORING, NEW PARTITIONS,DROPPED CEILINGS, FINISHES AND CABINETS; NO CHANGE TO USE, OCCUPANCY OR EGRESS.

Estimate; not an apartment assessment

Open official source ↗
$125,000.00As of 2023-10-30
Declared estimate · exact tax lot
Declared construction estimate · M00865184-I1-PL#1
Evidence

GENERAL PLUMBING MODIFICATIONS AS PER PLANS FILED. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION

Estimate; not an apartment assessment

Open official source ↗
$45,000.00As of 2023-10-30
Declared estimate · exact tax lot
Declared construction estimate · M00889218-S2-PL#1
Evidence

Replace plumbing fixtures on existing plumbing roughing at 4th floor apt. 41**[ APT 41 PAA (p3) FILED TO DELETE FROM THIS FILING ALL GAS RELATED WORK SUCH AS GAS COOKING RANGE, TO CAP AND REMOVE THE GAS PIPING]. Cooking equip'mt to be Electric

Estimate; not an apartment assessment

Open official source ↗
$7,000.00As of 2023-10-16
Declared estimate · exact tax lot
Declared construction estimate · M00893834-I1-MS#1
Evidence

INSTALL NEW BATHROOM EXHAUST VENT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

Estimate; not an apartment assessment

Open official source ↗
$5,000.00As of 2023-10-03
Declared estimate · exact tax lot
Declared construction estimate · M00889218-I1-GC#1
Evidence

General construction, interior drywall partition modification, repair and replacement drop ceiling new finish floor work limited to apt 41 4th floor. no change in use egress or occupancy is proposed under this application.

Estimate; not an apartment assessment

Open official source ↗
$45,000.00As of 2023-09-26
Declared estimate · exact tax lot

Up to 30 most recent distinct filings from the past five years; this is not a complete capital-work inventory.

Declared job estimates are not actual spending or approved assessments. Repeated permit rows for the same filing are counted once; separate job filings may still describe related work.

Source publication date not provided.

Open official source ↗
Model annual LL97 emissions exposure

Enter verified LL97 emissions and the applicable annual limit. LL84 location-based emissions above are a different reported metric and are not automatically used here.

Enter both assumptions to calculate exposure.

Before exemptions, adjustments, offsets or penalty mitigation. This scenario does not establish an issued fine or an apartment charge.

Official DOB penalty guidance ↗

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1326 MADISON AVENUE #61A
Manhattan · built 1900
-$895K-0 ft²1 bd · 1 ba-24
8 DOBbedbug
10.6Source

Building activity

Open a record to read the full agency text.

Housing violations (HPD) 0

No records returned.

Work permits (DOB) 30

Suspended ScaffoldApr 21, 2026Permit issued

Installation of suspended scaffold for facade work or inspection.

JUNO CONTRACTING CORP

Issued Apr 23, 2026

DOB filing M01382798-I1-SC#1
Supported ScaffoldApr 20, 2026Permit issued

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

JUNO CONTRACTING CORP

Issued Apr 20, 2026

DOB filing M01383940-I1-SF#1
Sidewalk ShedApr 17, 2026Permit issued

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

ANDAMIO SCAFFOLDING LLC

Issued Apr 17, 2026

DOB filing M01386452-I1-SH#1
Show 27 more records
Sidewalk ShedApr 17, 2026Permit issued

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

ANDAMIO SCAFFOLDING LLC

Issued Oct 7, 2026

DOB filing M01386452-I1-SH#3
Sidewalk ShedApr 17, 2026Permit issued

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

ANDAMIO SCAFFOLDING LLC

Issued Jul 13, 2026

DOB filing M01386452-I1-SH#2
General ConstructionMar 9, 2026Permit issued

FACADE REPAIRS TO INCLUDE MASONRY, POINTING, LINTELS, TERRACOTTA AS PER PLANS.

JUNO CONTRACTING CORP

Issued Apr 13, 2026

DOB filing M01364361-I1-GC#1
PlumbingDec 14, 2023Signed-off

PLUMBING FOR THE RENOVATION OF AN EXISTING APARTMENT #34 ON THE 3RD FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.

NICE PLUMBING CORP

Issued Jan 2, 2024

DOB filing M00946324-S1-PL#1
General ConstructionDec 13, 2023Signed-off

GENERAL CONSTRUCTION FOR THE RENOVATION OF AN EXISTING APARTMENT #34 ON THE 3RD FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.

BALOG CONSTRUCTION LLC

Issued Dec 19, 2023

DOB filing M00946324-I1-GC#1
General ConstructionOct 30, 2023Signed-off

GENERAL CONSTRUCTION SCOPE OF WORK: ( RENOVATION DIR 14 ALT 2)MINOR NON-STRUCTURAL PARTITION REMOVAL, NEW FINISH FLOORING, NEW PARTITIONS,DROPPED CEILINGS, FINISHES AND CABINETS; NO CHANGE TO USE, OCCUPANCY OR EGRESS.

TONED PAINTING & CONSTRUC

Issued Jun 12, 2024

DOB filing M00865176-I1-GC#2
General ConstructionOct 30, 2023Signed-off

GENERAL CONSTRUCTION SCOPE OF WORK: ( RENOVATION DIR 14 ALT 2)MINOR NON-STRUCTURAL PARTITION REMOVAL, NEW FINISH FLOORING, NEW PARTITIONS,DROPPED CEILINGS, FINISHES AND CABINETS; NO CHANGE TO USE, OCCUPANCY OR EGRESS.

TONED PAINTING & CONSTRUC

Issued Nov 15, 2023

DOB filing M00865176-I1-GC#1
PlumbingOct 30, 2023Signed-off

GENERAL PLUMBING MODIFICATIONS AS PER PLANS FILED. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION

MASTER 2 PLBG & HTG INC

Issued Feb 22, 2024

DOB filing M00865184-I1-PL#1
General ConstructionOct 30, 2023Signed-off

GENERAL CONSTRUCTION SCOPE OF WORK: ( RENOVATION DIR 14 ALT 2)MINOR NON-STRUCTURAL PARTITION REMOVAL, NEW FINISH FLOORING, NEW PARTITIONS,DROPPED CEILINGS, FINISHES AND CABINETS; NO CHANGE TO USE, OCCUPANCY OR EGRESS.

TONED PAINTING & CONSTRUC

Issued Nov 4, 2024

DOB filing M00865176-I1-GC#3
PlumbingOct 16, 2023Permit issued

Replace plumbing fixtures on existing plumbing roughing at 4th floor apt. 41**[ APT 41 PAA (p3) FILED TO DELETE FROM THIS FILING ALL GAS RELATED WORK SUCH AS GAS COOKING RANGE, TO CAP AND REMOVE THE GAS PIPING]. Cooking equip'mt to be Electric

INFINITI ESC PLUMBING COR

Issued Nov 13, 2023

DOB filing M00889218-S2-PL#1
Mechanical SystemsOct 3, 2023Signed-off

INSTALL NEW BATHROOM EXHAUST VENT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

TONED PAINTING & CONSTRUC

Issued Dec 19, 2024

DOB filing M00893834-I1-MS#1
General ConstructionSep 26, 2023Signed-off

General construction, interior drywall partition modification, repair and replacement drop ceiling new finish floor work limited to apt 41 4th floor. no change in use egress or occupancy is proposed under this application.

JOHN EVAN CONTRACTING COR

Issued Oct 17, 2023

DOB filing M00889218-I1-GC#1
General ConstructionSep 26, 2023Signed-off

General construction, interior drywall partition modification, repair and replacement drop ceiling new finish floor work limited to apt 41 4th floor. no change in use egress or occupancy is proposed under this application.

JOHN EVAN CONTRACTING COR

Issued Mar 29, 2024

DOB filing M00889218-I1-GC#3
Supported ScaffoldJun 13, 2021Signed-off

INSTALLATION OF TEMPORARY 45' HIGH PIPE SCAFFOLD ORIGINATING (OFF 2nd FLOOR) AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.

LEMX CORP

Issued Jun 13, 2021

DOB filing M00538504-I1-SF#1
Sidewalk ShedMar 2, 2021Signed-off

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE

LEMX CORP

Issued Mar 2, 2021

DOB filing M00478607-I1-SH#1
General ConstructionFeb 21, 2021Signed-off

FACADE REPAIRS TO INCLUDE MASONRY, POINTING, LINTELS, TERRACOTTA AS PER PLANS.

LEMX CORP

Issued Apr 15, 2021

DOB filing M00463844-I1-GC#1
General ConstructionFeb 21, 2021Signed-off

FACADE REPAIRS TO INCLUDE MASONRY, POINTING, LINTELS, TERRACOTTA AS PER PLANS.

LEMX CORP

Issued Jun 4, 2021

DOB filing M00463844-I1-GC#2
StructuralSep 25, 2020Signed-off

REPLACEMENT OF APT. #21 FLOOR JOISTS IN THE CEILING OF APT. #1 BATHROOM

H & D MAINTENANCE CO INC

Issued Sep 30, 2020

DOB filing M00402864-I1-ST#1
PlumbingJul 13, 2020Signed-off

PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY

P.H. WORKS INC

Issued Jul 14, 2020

DOB filing M00350350-I1-PL#1
OTJun 5, 2000Issued

OT

VENEZIA INTERIORS INC

Issued Jun 5, 2000

DOB filing 107687
MHSep 23, 1999Issued

MH

TAOCON CONSTRUCTION

Issued Sep 23, 1999

DOB filing 956946
OTFiling date not suppliedIssued

OT

ARCH CONSTRUCTION CO.,INC

DOB filing 3160198
OTFiling date not suppliedIssued

OT

L&Z RESTORATION CORP

DOB filing 1253440
OTFiling date not suppliedIssued

OT

I & H CONSTRUCTION LLC.

DOB filing 97084
EQFiling date not suppliedIssued

SF

BREND CONTR. CORP

DOB filing 1622363
OTFiling date not suppliedIssued

OT

SUNRISE RESATORATION INC

DOB filing 624204
OTFiling date not suppliedIssued

OT

DUTCHMAN CONTRACTING INC

DOB filing 405774

Latest 30 records shown.

Building violations (DOB) 22

E-ELEVATOR ELEVATORREQUIREDSep 25, 2018Disposition recorded Oct 3, 2022

Agency description not supplied.

DOB record 2315594
LBLVIO-LOW PRESSURE BOILER BOILER REQUIREDApr 6, 2018No disposition date supplied

VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT

DOB record 2272509
LBLVIO-LOW PRESSURE BOILER BOILER REQUIREDApr 6, 2018No disposition date supplied

VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT

DOB record 2260749
Show 19 more records
E-ELEVATOR ELEVATORREQUIREDOct 1, 2015No disposition date supplied

Agency description not supplied.

DOB record 2021398
E-ELEVATOR ELEVATORREQUIREDOct 8, 2012Disposition recorded May 10, 2013

Agency description not supplied.

DOB record 1714097
E-ELEVATOR ELEVATORREQUIREDAug 24, 2011Disposition recorded May 10, 2013

Agency description not supplied.

DOB record 1599488
E-ELEVATOR ELEVATORREQUIREDSep 27, 2010Disposition recorded Aug 11, 2011

Agency description not supplied.

DOB record 1589611
E-ELEVATOR ELEVATORREQUIREDMar 22, 2010No disposition date supplied

Agency description not supplied.

DOB record 1589608
E-ELEVATOR ELEVATORREQUIREDNov 13, 2009Disposition recorded May 26, 2010

Agency description not supplied.

DOB record 1442061
E-ELEVATOR ELEVATORREQUIREDDec 22, 2008Disposition recorded Jun 10, 2009

Agency description not supplied.

DOB record 1366674
E-ELEVATOR ELEVATORREQUIREDJan 21, 2008Disposition recorded Feb 23, 2009

Agency description not supplied.

DOB record 1262359
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIREDJan 6, 2006Disposition recorded Sep 27, 2006

Agency description not supplied.

DOB record 1129335
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIREDJan 6, 2006Disposition recorded Sep 27, 2006

Agency description not supplied.

DOB record 1129334
E-ELEVATOR ELEVATORREQUIREDJan 18, 2002Disposition recorded Nov 26, 2002

Agency description not supplied.

DOB record 809578
E-ELEVATOR ELEVATORREQUIREDNov 10, 1999Disposition recorded Jun 27, 2000

1P7876

DOB record 673826
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIREDAug 29, 1995Disposition recorded Sep 6, 1996

Agency description not supplied.

DOB record 382450
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIREDMar 18, 1993Disposition recorded Jul 29, 1994

Agency description not supplied.

DOB record 272205
C-CONSTRUCTION OTHER OPTIONALApr 11, 1989No disposition date supplied

Agency description not supplied.

DOB record 47045
C-CONSTRUCTION OTHER OPTIONALApr 11, 1989Disposition recorded Nov 6, 1996

Agency description not supplied.

DOB record 104123
C-CONSTRUCTION OTHER OPTIONALApr 11, 1989No disposition date supplied

Agency description not supplied.

DOB record 38286
C-CONSTRUCTION OTHER OPTIONALApr 11, 1989No disposition date supplied

Agency description not supplied.

DOB record 103899
E-ELEVATOR ELEVATORREQUIREDJul 13, 1988No disposition date supplied

Agency description not supplied.

DOB record 2385
Transaction history · 0 deeds

Recorded consideration. A $0 deed is not a sale price.

No recorded transactions for this BBL yet.

More buildings on this block

Sources, coverage & freshness

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Nov 6, 2026

Stable property ID: nyc:bbl:1015050056

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Nov 1, 2026

Pipeline completed Nov 1, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Aug 7, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Nov 6, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
96 permits in the current corpus · latest record Oct 7, 2026

Pipeline completed Nov 6, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Nov 6, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
22 violations in the current corpus · latest record Oct 3, 2022

Pipeline completed Nov 6, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

How to read these records

Deed amounts are recorded consideration, not asking prices or a unit valuation. A blank record is not proof that an issue does not exist.