CurbScoop
CurbScoopBuildingsCarnegie Hill11 EAST 87 STREET

11 EAST 87 STREET

Manhattan· Carnegie Hill· built 1954class D4BBL 1014990010
Open listing source

11 EAST 87 STREET is an 85-unit building in Carnegie Hill, Manhattan, built in 1954.

1 unit is on the market here right now.

City records show 30 DOB permits and 39 open violations on file.

Units (res)
85
Floors
12.0
Lot ft²
10,066 ft²
Bldg ft²
78,700 ft²
Assessed
$9.05M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
11 EAST 87 STREET #10A
Manhattan · built 1954
Carnegie Hill$525K-0 ft²1 bd · 1 ba-85
1 HPD-C6 DOBbedbug
10.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING 130 DEGREES FAHRENHEIT AT HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY
    Aug 16, 2016 · #3E · VIOLATION CLOSED
  • B
    SECTION 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 23, 2009 · #3E · NOV CERTIFIED LATE
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND WALLS AT 1st STORAGE ROOM FROM EAST AT NORTH, BASEMENT
    Aug 25, 2004 · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING AT 1st STORAGE ROOM FROM EAST AT NORTH, BASEMENT
    Aug 25, 2004 · NOV SENT OUT
  • B
    D26-10.01, 10.05 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS NORTH WEST FIRE STAIR BULKHEAD TO ROOF.
    Nov 26, 1976 · NOV SENT OUT
  • A
    D26-10.01 ADM CODE REFIT DOOR NORTH WEST FIRE STAIR BULKHEAD TO ROOF.
    Nov 26, 1976 · NOV SENT OUT
DOB permits (last 30)
  • PLJul 2, 2001
    AQUA SYSTEMS MECH. INC
  • MHJan 8, 2001
    JOSEPH CUSUMANO &SON INC
  • OT-
    JOSEPH CUSUMANO &SON INC
  • PL-
    NY PLUMBING & HEATING COR
  • PL-
    N.PAGANO PLUMBING & HEATING CONT
  • EQ-
    ROCKLEDGE SCAFFOLD
  • PL-
    NADKOS, INC
  • PL-
    PRODIGY PLUMBING &HEATING CORP
  • OT-
    VGC NYC INC
  • OT-
    PERSI CONTRACTING CORP
  • PL-
    AQUATECH PLUM CORP
  • PL-
    SJ INDUST CORP
  • OT-
    RATIONAL BUILDING CO., INC.
  • PL-
    RISER PLUMBING & HEATING
  • OT-
    CONEX INTERIORS INC
  • OT-
    NADKOS INC
  • OT-
    RATIONAL BUILDING CO., INC.
  • OT-
    RATIONAL BUILDING CO., INC.
  • OT-
    DIMENSIONAL CONCEPTS INC
  • PL-
    RICHARD MEYER PLUMB HEAT
  • OT-
    VIR CONSTRUCTION INC
  • PL-
    IDEAL PLUMBING CORP
  • OT-
    TUC-MEN CONTRACTING CORP
  • OT-
    MARIO A ZINO CONTR.
  • MH-
    VIR CONSTRUCTION INC
  • OT-
    TUC-MEN CONTRACTING CORP
  • PL-
    BEST PBG HTG & COOL INC
  • OT-
    NEW CENTURY CONSTR CORP
  • OT-
    DIAMOND ERA CONSTR. INC
  • PL-
    MCMANUS MECHANICAL MAINTENANCE
DOB violations
  • Oct 17, 2022FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Sep 11, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 4, 2013C-CONSTRUCTION OTHER OPTIONAL
  • Aug 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Nov 5, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2009E-ELEVATOR ELEVATORREQUIRED
  • Aug 21, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 21, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 14, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 14, 2006E-ELEVATOR ELEVATORREQUIRED
  • Feb 10, 2004E-ELEVATOR ELEVATORREQUIRED
  • Apr 16, 2003E-ELEVATOR ELEVATORREQUIRED
  • Apr 16, 2003E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2002L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Oct 27, 1999E-ELEVATOR ELEVATORREQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Nov 5, 1990C-CONSTRUCTION OTHER OPTIONAL
  • Sep 28, 1989E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 1989E-ELEVATOR ELEVATORREQUIRED

More buildings in Carnegie Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1014990010

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Mar 16, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
126 permits in the current corpus · latest record Oct 19, 2001

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
6 violations in the current corpus · latest record Sep 23, 2016

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
33 violations in the current corpus · latest record Oct 17, 2022

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Carnegie Hill market page.