CurbScoop
CurbScoopBuildingsLenox Hill515 EAST 72 STREET

515 EAST 72 STREET

Manhattan· Lenox Hill· built 1985class RMBBL 1014847501
Open listing source

515 EAST 72 STREET is a 323-unit building in Lenox Hill, Manhattan, built in 1985.

4 units are on the market here right now.

City records show 30 DOB permits and 60 open violations on file.

Units (res)
323
Floors
40.0
Lot ft²
43,420 ft²
Bldg ft²
467,115 ft²
Assessed
$83.1M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
515 EAST 72 STREET #10P
Manhattan · built 1985
Lenox Hill$899K$1,312685 ft²1 bd · 1 ba-196
6 HPD-C3 DOBbedbug
17.6Source
515 EAST 72 STREET #4B
Manhattan · built 1985
Lenox Hill$1.60M$1,4261,122 ft²2 bd · 2 ba-404
6 HPD-C3 DOBbedbug
17.6Source
515 EAST 72 STREET #11EE
Manhattan · built 1985
Lenox Hill$699K-0 ft²studio · 1 ba-44
6 HPD-C3 DOBbedbug
17.6Source
515 EAST 72 STREET #11D
Manhattan · built 1985
Lenox Hill$1000K$1,079927 ft²1 bd · 1 ba-141
6 HPD-C3 DOBbedbug
17.6Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 24B, 24th STORY, 4th APARTMENT FROM WEST AT NORTH
    Mar 11, 2021 · #24B · VIOLATION CLOSED
  • I
    § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS 24TH STORY NORTH 4 APARTMENT NUMBER 24B UNDER VACATE ORDER NUMBER #153130
    Feb 6, 2020 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, AT 23RD STORY, PUBLIC HALL
    Jan 15, 2020 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SOOT AT CEILING, WALLS, AND FLOORS IN THE ENTIRE APARTMENT LOCATED AT APT 24J, 24th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 15, 2020 · #24J · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 23A, 23rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jan 15, 2020 · #23A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WALLS IN THE FOYER LOCATED AT APT 23A, 23rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jan 15, 2020 · #23A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 23A, 23rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jan 15, 2020 · #23A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WALLS IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 23A, 23rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jan 15, 2020 · #23A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SOOT AT CEILING, WALLS, AND FLOORS, AT 24TH STORY, PUBLIC HALL
    Jan 15, 2020 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER, AT CEILING, AT 23RD STORY, PUBLIC HALL
    Jan 15, 2020 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT 24B, 24th STORY, 4th APARTMENT FROM WEST AT NORTH
    Jan 15, 2020 · #24B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SHOWER KNOB AT BATHTUB IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 15, 2019 · #4F · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 15, 2019 · #4F · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 15, 2019 · #4F · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK FAUCET IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 15, 2019 · #4F · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 6, 2019 · #4F · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 6, 2019 · #4F · VIOLATION CLOSED
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ...... IN THE ENTRANCE LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 6, 2019 · #4F · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 6, 2019 · #4F · VIOLATION CLOSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT THE SINK IN THE KITCHEN LOCATED AT APT 29D, 29th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 19, 2010 · #29D · VIOLATION CLOSED
DOB permits (last 30)
  • OTNov 26, 2019
    CNSTR CONTRACT OF NY CORP
  • OTFeb 4, 2009
    RIVER TERRACE APARTMENTS
  • PL-
    DONATO INC
  • MH-
    RIVER TERRACE APARTMENTS
  • OT-
    RIVER TERRACE APARTMENTS
  • PL-
    DONATO INC
  • PL-
    DONATO INC
  • PL-
    DONATO INC
  • PL-
    BEDROCK PLBG. & HTG., INC
  • PL-
    DONATO INC
  • OT-
    RIVER TERRACE APARTMENTS
  • OT-
    RIVER TERRACE APARTMENTS
  • MH-
    RIVER TERRACE APARTMENTS
  • EQ-
    EVEREST SCAFFOLDING INC
  • PL-
    DONATO INC
  • OT-
    LEGACY BUILDERS/DEVELOPER
  • PL-
    DONATO INC
  • MH-
    POWER COOLING INC
  • OT-
    POWER COOLING INC
  • SP-
    CAPITOL FIRE SPRINKLER CO
  • SP-
    CAPITOL FIRE SPRINKLER CO
  • OT-
    RIVER TERRACE APARTMENTS
  • OT-
    RIVER TERRACE APARTMENTS
  • OT-
    RIVER TERRACE APARTMENTS
  • OT-
    LEGACY BUILDERS/DEVELOPER
  • OT-
    JNJ BUILDERS LLC
  • EQ-
    OUTDOOR INSTALLATIONS LLC
  • PL-
    DONATO INC
  • PL-
    DONATO INC
  • OT-
    RIVER TERRACE APARTMENTS
DOB violations
  • Feb 16, 2022FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Feb 16, 2022FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Nov 17, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 17, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 17, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 17, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 17, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 17, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 17, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 17, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Sep 14, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 14, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 14, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Oct 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 9, 2012E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1014847501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record May 12, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 13, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
203 permits in the current corpus · latest record Nov 26, 2019

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
20 violations in the current corpus · latest record Apr 12, 2021

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
71 violations in the current corpus · latest record Feb 16, 2022

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.