CurbScoop
CurbScoop›Buildings›Lenox Hill›530 EAST 72 STREET

530 EAST 72 STREET

Manhattan· Lenox Hill· built 1962class D4BBL 1014830028
Open listing source

530 EAST 72 STREET is a 135-unit building in Lenox Hill, Manhattan, built in 1962.

5 units are on the market here right now.

City records show 30 DOB permits and 76 open violations on file.

Units (res)
135
Floors
20.0
Lot ft²
13,500 ft²
Bldg ft²
195,000 ft²
Assessed
$22.3M
DOF total
Comps L5y
0

Active sale listings (5)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
530 EAST 72 STREET #17D
Manhattan · built 1962
Lenox Hill$1.20M-0 ft²1 bd · 1 ba-17
4 HPD-C3 DOBbedbug
13.8Source
530 EAST 72 STREET #3C
Manhattan · built 1962
Lenox Hill$695K-0 ft²1 bd · 1 ba-186
4 HPD-C3 DOBbedbug
13.8Source
530 EAST 72 STREET #3F
Manhattan · built 1962
Lenox Hill$1.20M$7051,700 ft²2 bd · 2 ba-151
4 HPD-C3 DOBbedbug
13.8Source
530 EAST 72 STREET #10B
Manhattan · built 1962
Lenox Hill$850K$8501,000 ft²1 bd · 1 ba-178
4 HPD-C3 DOBbedbug
13.8Source
530 EAST 72 STREET #4D
Manhattan · built 1962
Lenox Hill$1.50M$9351,605 ft²2 bd · 2 ba-139
4 HPD-C3 DOBbedbug
13.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''north''
    Sep 2, 2026 · #7B · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''north''
    Sep 2, 2026 · #7B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''north''
    Sep 2, 2026 · #7B · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''north''
    Sep 2, 2026 · #7B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH AND EAST WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 21B, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 18, 2025 · #21B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 21B, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 18, 2025 · #21B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT EXTERIOR OF TERRACE LOCATED AT APT 21B, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 18, 2025 · #21B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 21B, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 18, 2025 · #21B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH AND EAST WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 21B, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 18, 2025 · #21B · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE NORTH WALL (10 SQFT) IN THE 3rd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 19, 2021 · #7B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Dec 19, 2021 · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
    Dec 19, 2021 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, WEST AND SOUTH WALLS IN THE 3rd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 19, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE NORTH AND WEST WALL ( 10 SQ FT) IN THE 2nd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 19, 2021 · #7B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 19, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 19, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE KITCHEN LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 19, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 19, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · NOV SENT OUT
  • C
    § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · VIOLATION DISMISSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APPROX 25 SQ.FT IN THE 2nd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APPROX 20 SQ.FT IN THE 3rd ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 7, 2021 · #7B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 26, 2021 · #3D · VIOLATION DISMISSED
  • B
    § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Sep 2, 2017 · #3D · FALSE CERTIFICATION
  • C
    SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 18C, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 14, 2015 · #18C · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 18C, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 14, 2015 · #18C · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 18C, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 5, 2014 · #18C · VIOLATION CLOSED
  • B
    SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 18C, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 5, 2014 · #18C · VIOLATION CLOSED
  • B
    SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 18C, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 5, 2014 · #18C · VIOLATION CLOSED
  • C
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Nov 27, 2013 · #3D · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE ENTIRE APARTMENT LOCATED AT APT ST4, 3rd APARTMENT FROM EAST AT SOUTH
    May 31, 2012 · #ST4 · VIOLATION DISMISSED
  • B
    SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT ST4, 3rd APARTMENT FROM EAST AT SOUTH
    May 31, 2012 · #ST4 · VIOLATION DISMISSED
  • B
    SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY
    Jul 31, 2002 · #3D · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMP CEILING IN THE KITCHEN LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 15, 2000 · #18F · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 18F, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 15, 2000 · #18F · VIOLATION CLOSED
DOB permits (last 30)
  • StructuralMar 13, 2026
    TRIBUTE RESTORATION INC
  • Sidewalk ShedJan 9, 2026
    ANDAMIO SCAFFOLDING LLC
  • General ConstructionDec 17, 2025
    EFP CONSTRUCTION LLC
  • General ConstructionDec 17, 2025
    EFP CONSTRUCTION LLC
  • Sidewalk ShedSep 25, 2025
    KINGS GROUP NY CORP
  • Suspended ScaffoldJul 16, 2025
    SKY RISE RESTORATION INC
  • Suspended ScaffoldJul 16, 2025
    SKY RISE RESTORATION INC
  • StructuralMay 13, 2025
    SKY RISE RESTORATION INC
  • General ConstructionMar 18, 2025
    SKY RISE RESTORATION INC
  • General ConstructionDec 19, 2024
    VBS ASSOCIATES LLC
  • General ConstructionJun 14, 2024
    TONYS CONTRACTING GROUP C
  • General ConstructionApr 22, 2024
    SWE DEVELOPMENT CORP
  • Sidewalk ShedApr 12, 2024
    KINGS GROUP NY CORP
  • Sidewalk ShedApr 12, 2024
    KINGS GROUP NY CORP
  • Sidewalk ShedApr 12, 2024
    KINGS GROUP NY CORP
  • Sidewalk ShedApr 12, 2024
    KINGS GROUP NY CORP
  • Sidewalk ShedApr 12, 2024
    KINGS GROUP NY CORP
  • Suspended ScaffoldJan 12, 2024
  • PlumbingJan 24, 2023
    ASTORIA P & H CORP
  • PlumbingJan 24, 2023
    ASTORIA P & H CORP
  • General ConstructionJan 24, 2023
    TONYS CONTRACTING GROUP C
  • General ConstructionJan 24, 2023
    TONYS CONTRACTING GROUP C
  • General ConstructionJan 6, 2023
    HAP CONSTRUCTION LLC
  • PlumbingNov 9, 2022
    AURA PLUMBING INC
  • General ConstructionNov 7, 2022
    VAN GOGH PAINTERS LLC
  • PlumbingOct 31, 2022
    AQUEDUCT MECHANICAL CORP
  • General ConstructionOct 28, 2022
    FLAIR NYC INC
  • General ConstructionJun 2, 2022
    NON LIMITE INC
  • PlumbingMay 13, 2022
    MES CONSTRUCTION CORP
  • General ConstructionApr 26, 2022
    ARCHLINK DESIGN CORP
DOB violations
  • Apr 12, 2024C-CONSTRUCTION OTHER OPTIONAL
  • Feb 21, 2024FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Aug 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 13, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Dec 13, 2013P-PLUMBING NONE
  • Dec 13, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Apr 3, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 3, 2010E-ELEVATOR ELEVATORREQUIRED
  • Nov 4, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 4, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 4, 2009E-ELEVATOR ELEVATORREQUIRED
  • Dec 18, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 18, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 18, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2005E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2005E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 28, 2002E-ELEVATOR ELEVATORREQUIRED
  • Jul 20, 1988E-ELEVATOR ELEVATORREQUIRED
  • Jul 20, 1988E-ELEVATOR ELEVATORREQUIRED
  • Jul 20, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1014830028

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
5 active sale listings in the current corpus · latest record Aug 14, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
236 permits in the current corpus · latest record Sep 21, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
47 violations in the current corpus · latest record Sep 4, 2026

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
36 violations in the current corpus · latest record Apr 12, 2024

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.