CurbScoop
CurbScoopBuildingsLenox Hill399 1 AVENUE

399 1 AVENUE

Manhattan· Lenox Hill· built 1910class RMBBL 1014737503
Open listing source

399 1 AVENUE is a 35-unit building in Lenox Hill, Manhattan, built in 1910.

1 unit is on the market here right now.

City records show 21 DOB permits and 54 open violations on file.

Units (res)
35
Floors
7.0
Lot ft²
3,339 ft²
Bldg ft²
25,810 ft²
Assessed
$3.71M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
399 EAST 78 STREET #4B
Manhattan · built 1910
Lenox Hill$350K-0 ft²studio · 1 ba-203
17 HPD-C1 DOBbedbug
33.3Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS AT 4TH STORY BALCONY AT BUILDING FRONT SOUTH STACK AT FIRE ESCAPE
    Mar 2, 2026 · NOV CERTIFIED ON TIME
  • B
    § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES BUCKET ON BALCONY AT NORTH AT FIRE ESCAPE, 5th STORY
    Nov 27, 2024 · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Dec 28, 2022 · #1A · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Dec 28, 2022 · #1A · VIOLATION DISMISSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Dec 28, 2022 · #1A · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEDING 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Dec 28, 2022 · #1A · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
    Dec 28, 2022 · VIOLATION DISMISSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Dec 28, 2022 · #1A · VIOLATION CLOSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Dec 28, 2022 · #1A · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 3, 2022 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 6, 2021 · #6E · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE AIR VALVE AT RADIATOR AT UPPER LEVEL ROOM IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 6, 2021 · #6E · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 6, 2021 · #6E · VIOLATION CLOSED
  • C
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 6, 2021 · #6E · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2021 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Apr 1, 2021 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT PUBLIC HALL, 1st STORY
    Dec 3, 2019 · VIOLATION DISMISSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Dec 3, 2019 · #5D · INVALID CERTIFICATION
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Dec 3, 2019 · #5D · INVALID CERTIFICATION
  • C
    § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Dec 1, 2019 · #3D · VIOLATION DISMISSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Dec 1, 2019 · #3D · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL CEILING IN CELLAR LOCATED AT BOILER ROOM
    Oct 9, 2019 · VIOLATION DISMISSED
  • A
    § 27-2081 ADM CODE THOROUGHLY WHITEWASH OR PAINT WITH A LIGHT COLOR THE SURFACES CEILING AND ALL WALLS IN CELLAR LOCATED AT BOILER ROOM
    Oct 9, 2019 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    May 25, 2019 · VIOLATION CLOSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    May 25, 2019 · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    May 25, 2019 · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    May 25, 2019 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    May 25, 2019 · VIOLATION CLOSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    May 25, 2019 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT ENTRANCE DOOR TO BUILDING AT PUBLIC HALL, 1st STORY
    Mar 20, 2019 · VIOLATION CLOSED
  • B
    § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 200 WATT MINIMUM REQUIRED.
    Sep 14, 1999 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM 1 STY VESTIBULE & CELLAR DOOR TO BOILER ROOM.
    Feb 7, 1996 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM CELLAR DOOR TO BOILER ROOM LOCKED.
    Feb 7, 1996 · VIOLATION CLOSED
DOB permits (last 30)
  • EQ-
    SKYWORX CONTRACTING INC
  • OT-
    R C Y CONST.CORP.
  • PL-
    MARIO MORAMARCO INC
  • MH-
    RCY CONSTRUCTION CORP
  • FB-
    T M J PLG AND HTG
  • PL-
    T M J PLG AND HTG
  • FP-
    IDEAL FIRE CONTROL INC
  • OT-
    BO7 CONSTRUCTION CORP
  • MH-
    BO7 CONSTRUCTION CORP
  • PL-
    SO PLUMBING & HEATING INC
  • BL-
    T M J PLG AND HTG
  • OT-
    Z & B CONSTRUCTION INC
  • OT-
    BRIAN GHIELMETTI
  • BL-
    HIGH RISE PLUMBING& HEATING
  • PL-
    HIGH RISE PLUMBING& HEATING
  • BL-
    HIGH RISE PLBG & HTG CORP
  • PL-
    HIGH RISE PLBG & HTG CORP
  • BL-
    HIGH RISE PLBG & HTG CORP
  • PL-
    HIGH RISE PLBG & HTG CORP
  • BL-
    HIGH RISE PLBG & HTG CORP
  • PL-
    HIGH RISE PLBG & HTG CORP
DOB violations
  • Feb 22, 2024FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Oct 4, 2023AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 16, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 31, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 28, 2017E-ELEVATOR ELEVATORREQUIRED
  • Sep 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 14, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 29, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Dec 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 4, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 4, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Nov 3, 2009E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 30, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2006E-ELEVATOR ELEVATORREQUIRED
  • May 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2002L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Mar 15, 1990E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1014737503

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jan 20, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
21 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
33 violations in the current corpus · latest record Mar 17, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
21 violations in the current corpus · latest record Feb 3, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.