CurbScoop
CurbScoop›Buildings›Lenox Hill›435 EAST 77 STREET

435 EAST 77 STREET

Manhattan· Lenox Hill· built 1962class D4BBL 1014720014
Open listing source

435 EAST 77 STREET is an 87-unit building in Lenox Hill, Manhattan, built in 1962.

3 units are on the market here right now.

City records show 30 DOB permits and 55 open violations on file.

Units (res)
87
Floors
12.0
Lot ft²
8,513 ft²
Bldg ft²
62,920 ft²
Assessed
$7.21M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
435 EAST 77 STREET #8G
Manhattan · built 1962
Lenox Hill$549K-0 ft²1 bd · 1 ba-403
2 HPD-C19 DOBbedbug
19.1Source
435 EAST 77 STREET #7C
Manhattan · built 1962
Lenox Hill$665K$887750 ft²1 bd · 1 ba-63
2 HPD-C19 DOBbedbug
19.1Source
435 EAST 77 STREET #4A
Manhattan · built 1962
Lenox Hill$479K$855560 ft²1 bd · 1 ba-124
2 HPD-C19 DOBbedbug
19.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 15, 2023 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET SAFETY COVERS AT WEST AND SOUTH WALL. AT PUBLIC HALL, 1st STORY
    Nov 27, 2019 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL BUZZER INTECRCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE APT. AT PUBLIC HALL, 1st STORY
    Nov 27, 2019 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Dec 15, 2016 · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Dec 15, 2016 · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES GAS RANGE IN THE KITCHEN LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 15, 2016 · #9H · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Dec 15, 2016 · VIOLATION CLOSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    Dec 15, 2016 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORY
    Dec 15, 2016 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Dec 15, 2016 · NOT COMPLIED WITH
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Dec 15, 2016 · NOT COMPLIED WITH
  • B
    SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 10, 2003 · #1B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING METAL RAILING OF PARAPET WALL NORTH & WEST OF ROOF TERRACE USED IN CONJUNCTION 11 STY NORTHWEST APT 11D. , SECTION '' ''
    Oct 23, 1990 · #11D · NOV CERTIFIED LATE
  • A
    D26-12.03 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT IRON RAILING NORTH TERRACE 12 STY.
    Sep 8, 1986 · NOT COMPLIED WITH
  • B
    D26-11.01, 11.03, 11.05 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE THROUGHOUT PUMP ROOM FRONT CELLAR.
    Sep 8, 1986 · NOT COMPLIED WITH
DOB permits (last 30)
  • Suspended ScaffoldJan 9, 2024
    STRUCTUAL PRESV SYSTEM
  • Sidewalk ShedMar 29, 2019
    POWERS BRIDGING & SCAFFOL
  • Sidewalk ShedMar 29, 2019
    POWERS BRIDGING & SCAFFOL
  • EQNov 9, 1995
    COLGATE SCAFFOLDING
  • FBNov 4, 1994
    STAR INDUSTRIAL SERV.CO.INC
  • EQJun 19, 1990
    WILCOX CONSTRUCTION
  • OT-
    CANIDO BASONAS CONSTRUCTI
  • EQ-
    PANORAMA INTERNATIONAL CONTRACT
  • OT-
    PANORAMA INTERNATIONAL CONTRACTI
  • OT-
    CANIDO BASONAS CONSTRUCTI
  • EQ-
    TWIN SCAFF
  • OT-
    ACCURA REST.& WATERPROOF
  • EQ-
    PANORAMA INTERNATIONAL CONTRACT
  • OT-
    PANORAMA INTERNATIONAL CONTRACTI
  • EQ-
    WILCOX CONSTRUCTION
  • PL-
    L&J PLG & HTG CO OF NY IN
  • MH-
    DESIGN HOME ITER. IN.
  • OT-
    DESIGN HOME ITER.
  • OT-
    RAPHY CUSTOM INTERIORS
  • OT-
    ROSENWACH TANK CO INC
  • PL-
    ROSENWACH TANK CO INC
  • OT-
    ACCURA REST.& WATERPROOF
  • PL-
    MARQUIS PLUMB HEAT. CO
  • EQ-
    ATLANTIC SCAFFOLDING
  • EQ-
    PANORAMA INTERNATIONAL CONTRACT
  • OT-
    PANORAMA INTERNATIONAL CONTRACTI
  • OT-
    C C CONTROLLED COMBUSTION
  • PL-
    CC CONTROLLED PLBG CO INC
  • PL-
    CC CONTROLLED PLBG CO INC
  • EQ-
    COLGATE SCAFFOLDING
DOB violations
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Sep 11, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 5, 2019FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Aug 30, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 26, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 26, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jul 24, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 24, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Mar 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 30, 2007LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Nov 22, 2005E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jul 9, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jul 9, 2004E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2004LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jul 30, 2003E-ELEVATOR ELEVATORREQUIRED
  • Jul 30, 2003E-ELEVATOR ELEVATORREQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1014720014

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jun 24, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
47 permits in the current corpus · latest record Jan 12, 2024

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
15 violations in the current corpus · latest record Mar 23, 2023

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
50 violations in the current corpus · latest record Jul 21, 2026

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.