CurbScoop
CurbScoopBuildingsLenox Hill404 EAST 76 STREET

404 EAST 76 STREET

Manhattan· Lenox Hill· built 1999class RMBBL 1014707501
Open listing source

404 EAST 76 STREET is a 180-unit building in Lenox Hill, Manhattan, built in 1999.

2 units are on the market here right now.

City records show 30 DOB permits and 49 open violations on file.

Units (res)
180
Floors
31.0
Lot ft²
21,820 ft²
Bldg ft²
186,267 ft²
Assessed
$31.3M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
404 EAST 76 STREET #15B
Manhattan · built 1999
Lenox Hill$835K$1,392600 ft²1 bd · 1 ba-0
1 HPD-C10 DOBbedbug
13.2Source
404 EAST 76 STREET #8C
Manhattan · built 1999
Lenox Hill$1.45M$1,2911,119 ft²2 bd · 2 ba-76
1 HPD-C10 DOBbedbug
13.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY
    Apr 18, 2022 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORY
    Apr 18, 2022 · VIOLATION CLOSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Apr 18, 2022 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REFIT THE CASEWMENT WINDOW AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 28, 2020 · #3K · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 28, 2020 · #3K · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT WEST WALL IN THE KITCHEN LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 28, 2020 · #3K · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT WEST WALL IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 28, 2020 · #3K · VIOLATION CLOSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 4, 2019 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Mar 3, 2015 · VIOLATION DISMISSED
DOB permits (last 30)
  • ALJul 27, 1993
    AMBASSADOR CONST.
  • EQ-
    TISHMAN CONSTR
  • PL-
    ADRIATIC PLUMBING &HEATING CORP
  • EQ-
    TISHMAN CONSTR
  • NB-
    TISHMAN CONST CORP
  • EQ-
    TISHMAN CONSTR
  • NB-
    TISHMAN CONST CORP
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    DONNELLY IDUST
  • OT-
    DEMARCO CONSTRUCTION SERV
  • OT-
    THE GLAZER ORGANIZATION,
  • PL-
    ALL PRO PLBG & HTG
  • PL-
    GALICJA PLBG AND HTG.CORP
  • SD-
    RCI PLUMBING CORP
  • NB-
    TISHMAN CONST CORP
  • SP-
    ASCO SPRINKLER CO.,INC
  • SG-
    TRU-ART SIGN CO., INC.
  • OT-
    LAWRENCE AXIAK
  • EQ-
    TISHMAN CONSTR
  • FO-
    TISHMAN CONST CORP
  • OT-
    IDI CONSTR.
  • OT-
    ARRA ARCHITECTURE
  • AL-
    BARTON CONSTRUCTION LLC
  • NB-
    55 DC LLC C/O RFR REALTY LLC
  • EQ-
    DONNELLY INDUSTRIES
  • OT-
    DONNELLY INDUSTRIES
  • MH-
    DONNELLY INDUSTRIES
  • OT-
    SELBY CONSTRUCTION INC
  • OT-
    RICH COAST CONTRACTING CORP
  • NB-
    TISHMAN CONST CORP
DOB violations
  • Nov 1, 2023FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Feb 15, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Jan 8, 2020C-CONSTRUCTION OTHER OPTIONAL
  • Sep 10, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 10, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 3, 2019LL2604S-SPRINKLER NONE
  • Aug 29, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 29, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 29, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 21, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 21, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Nov 10, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jul 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 7, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 7, 2006E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1014707501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 11, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
101 permits in the current corpus · latest record Jul 27, 1993

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
9 violations in the current corpus · latest record Mar 7, 2024

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
48 violations in the current corpus · latest record Jan 5, 2026

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.