CurbScoop
CurbScoopBuildingsLenox Hill435 EAST 65 STREET

435 EAST 65 STREET

Manhattan· Lenox Hill· built 1963class D4BBL 1014600017
Open listing source

435 EAST 65 STREET is a 120-unit building in Lenox Hill, Manhattan, built in 1963.

3 units are on the market here right now.

City records show 30 DOB permits and 60 open violations on file.

Units (res)
120
Floors
14.0
Lot ft²
11,305 ft²
Bldg ft²
107,780 ft²
Assessed
$11.4M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
435 EAST 65 STREET #11E
Manhattan · built 1963
Lenox Hill$550K-0 ft²1 bd · 1 ba-21
7 DOBbedbug
9.7Source
435 EAST 65 STREET #4E
Manhattan · built 1963
Lenox Hill$599K-0 ft²1 bd · 1 ba-161
7 DOBbedbug
9.7Source
435 EAST 65 STREET #6E
Manhattan · built 1963
Lenox Hill$549K-0 ft²1 bd · 1 ba-44
7 DOBbedbug
9.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WOOD DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 29, 2017 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTER TOP IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 29, 2017 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 29, 2017 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 29, 2017 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 29, 2017 · #5H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC OUTLET ON NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    May 23, 2016 · NOT COMPLIED WITH
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED AT CEILING LIGHT FIXTURE IN THE 4th ROOM FROM NORTH LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE BATHROOM LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC PILOT LIGHTS AT GAS RANGE IN THE KITCHEN LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC-TILES ON NORTH & EAST WALLS IN THE BATHROOM LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 23, 2016 · #5H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE FAUCET FIXTURE AT WASH/BASIN IN THE BATHROOM LOCATED AT APT 5H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2016 · #5H · VIOLATION CLOSED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 1, 2015 · VIOLATION DISMISSED
DOB permits (last 30)
  • EQMar 10, 2004
    COLGATE SCAFFOLDING AND EQUIP CO
  • EQApr 23, 1997
    SPRING SCAFFOLDING INC
  • OT-
    LAK CONSTRUCTION CORP
  • PL-
    JOSEPH O. FERRARA & SONS INC
  • OT-
    TEKTONAS CONTRACTING CORP
  • EQ-
    COLGATE SCAFFOLDING AND EQUIP CO
  • OT-
    ROMO CONSTRUCTION CORP
  • OT-
    ROMO CONSTRUCTION CORP
  • OT-
    BNH CONSTRUCTION NY INC
  • OT-
    ROMO CONSTRUCTION CORP
  • OT-
    ROMO CONSTRUCTION CORP
  • EQ-
    SPRING SCAFFOLDING INC
  • PL-
    GREAT CITY PLUMBING INC
  • PL-
    SENID PL & HTG CORP
  • OT-
    UNITD CONSTR. WHEATHERPROOF.
  • OT-
    SUNRISE RENOVATION INC.
  • EQ-
    BRENMAC CORP
  • OT-
    ROMO CONSTRUCTION CORP
  • PL-
    PFEIFFER P,HTG,SPKL CONT
  • OT-
    SAABI CONSTRUCTION INC
  • OT-
    BEST BUILDING GROUP CORP
  • PL-
    PFEIFFER P,HTG,SPKL CONT
  • OT-
    E & A CONSTRUCTION INC
  • OT-
    ROMO CONSTRUCTION CORP
  • OT-
    ROMO CONSTRUCTION CORP
  • PL-
    ALLOCCA PLMB & HTG CORP
  • OT-
    CHRISTOPHER DALEY
  • OT-
    BNH CONSTRUCTION NY INC
  • OT-
    BNH CONSTRUCTION NY INC
  • OT-
    ROMO CONSTRUCTION CORP
DOB violations
  • Feb 17, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Apr 29, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Oct 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 31, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 30, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 30, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 26, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 26, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2007LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 29, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 29, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2004E-ELEVATOR ELEVATORREQUIRED
  • Apr 21, 2004LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jul 29, 2003E-ELEVATOR ELEVATORREQUIRED
  • Jul 29, 2003E-ELEVATOR ELEVATORREQUIRED
  • Apr 4, 2001E-ELEVATOR ELEVATORREQUIRED
  • Apr 4, 2001E-ELEVATOR ELEVATORREQUIRED
  • Oct 27, 1999E-ELEVATOR ELEVATORREQUIRED
  • Oct 27, 1999E-ELEVATOR ELEVATORREQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Dec 18, 1989E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1014600017

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record May 27, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
44 permits in the current corpus · latest record Mar 10, 2004

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
20 violations in the current corpus · latest record Jun 3, 2022

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
43 violations in the current corpus · latest record Feb 17, 2023

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.