CurbScoop
CurbScoopBuildingsLenox Hill1461 1 AVENUE

1461 1 AVENUE

Manhattan· Lenox Hill· built 1963class D4BBL 1014510023

1461 1 AVENUE is a 215-unit building in Lenox Hill, Manhattan, built in 1963.

5 units are on the market here right now.

City records show 30 DOB permits and 72 open violations on file.

Units (res)
215
Floors
20.0
Lot ft²
19,754 ft²
Bldg ft²
217,143 ft²
Assessed
$28.8M
DOF total
Comps L5y
0

Active sale listings (5)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
363 EAST 76 STREET #14E
Manhattan · built 1963
Lenox Hill$565K-0 ft²studio · 1 ba-150
3 HPD-C16 DOBbedbug
19.8Source
363 EAST 76 STREET #3B
Manhattan · built 1963
Lenox Hill$929K$953975 ft²1 bd · 1 ba-22
3 HPD-C16 DOBbedbug
19.8Source
363 EAST 76 STREET #14K
Manhattan · built 1963
Lenox Hill$450K-0 ft²studio · 1 ba-90
3 HPD-C16 DOBbedbug
19.8Source
363 EAST 76 STREET #2A
Manhattan · built 1963
Lenox Hill$649K-0 ft²1 bd · 1 ba-178
3 HPD-C16 DOBbedbug
19.8Source
363 EAST 76 STREET #8K
Manhattan · built 1963
Lenox Hill$399K-0 ft²studio · 1 ba-122
3 HPD-C16 DOBbedbug
19.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 10, 2021 · #7M · NOV SENT OUT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 10, 2021 · #7M · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 10, 2021 · #7M · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''west''
    Feb 8, 2021 · #4A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR DRAFT AROUND HEATING UNIT AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''west''
    Feb 8, 2021 · #4A · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REFIT LOWER SASH AT WINDOW AT SOUTH IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''west''
    Feb 8, 2021 · #4A · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''west''
    Feb 8, 2021 · #4A · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Oct 5, 2020 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT OR NEAR MAILBOX AT PUBLIC HALL, 1st STORY
    Oct 5, 2020 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Oct 5, 2020 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT OR NEAR MAILBOX AT PUBLIC HALL, 1st STORY
    Oct 5, 2020 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4A, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Oct 5, 2020 · #4A · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX .. AT PUBLIC HALL, 1st STORY
    Oct 5, 2020 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 5, 2020 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 7, 2018 · #7M · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 7, 2018 · #7M · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE DIVERTER AT BATHTUB IN THE BATHROOM LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 7, 2018 · #7M · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 7, 2018 · #7M · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE FAUCET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 7, 2018 · #7M · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 7M, 7th STORY, 12th APARTMENT FROM SOUTH AT WEST
    Nov 7, 2018 · #7M · NOV SENT OUT
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING AND ALL WALLS APPROXIMATE 20 SQ. FT. IN THE BATHROOM LOCATED AT APT 7M, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 7, 2018 · #7M · NOV SENT OUT
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT THE RANGE IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 22, 2017 · #2B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR TO THE OVEN IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 22, 2017 · #2B · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 20, 2016 · #2B · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 1, 2014 · #2E · NOV SENT OUT
  • B
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2009 · #2B · VIOLATION CLOSED
  • B
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... SOUTH AND WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2009 · #2B · VIOLATION CLOSED
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2009 · #2B · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTHAND WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2009 · #2B · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 9, 2009 · #2B · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WATER DAMAGED CEILING AT BATHROOM 2 STY NORTHEAST APT 2L. , SECTION '' ''
    Mar 29, 1994 · #2L · NOT COMPLIED WITH
  • B
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMPNESS PENETRATING WALL & CEILING BATHROOM AT 2 STY NORTHWEST APT 2L. , SECTION '' ''
    Mar 29, 1994 · #2L · VIOLATION CLOSED
DOB permits (last 30)
  • OTAug 2, 2005
    SENAN CLANCY CONTR.
  • OTOct 5, 2000
    DABOCO INC._& DUANE READ INC.
  • ALDec 26, 1996
    AAR-ZEE SERVICES INC
  • MHJul 19, 1993
    AARC TEAM INC
  • PL-
    C & T PLUMBING & HTG INC
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    BCI CONTRACTOR INC
  • OT-
    ZACK'S CONSTRUCTION CORP.
  • EQ-
    JERRICK ASSOCIATES INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    ALL CITY REMODELING, INC
  • OT-
    WONDER WORKS CONSTR CORP
  • EQ-
    JERRICK ASSOCIATES INC
  • PL-
    TOMKAT PLUMBING HEATING L
  • MH-
    EUDA CONSTRUCTION & DESIG
  • OT-
    DI MARTINI INC
  • PL-
    PREFERRED MECHANICAL
  • OT-
    EUDA CONSTRUCTION & DESIG
  • OT-
    EUDA CONSTRUCTION & DESIG
  • EQ-
    JERRICK ASSOCIATES INC
  • PL-
    ORBIT PLG AND HTG INC
  • PL-
    QMB PLUMBING & HEATING IN
  • MH-
    ADR CONSTR INC
  • OT-
    A N Z CONSTRUCTION SERVICES INC
  • PL-
    QMB PLUMBING & HEATING IN
  • OT-
    ADELPHI RESTORATION CORP.
  • PL-
    WAGNER ZIV PLUMB HEAT.
  • PL-
    SMB PLUMBING & HEATING CO
  • OT-
    ARC INTER
  • PL-
    KISHAN PLBG & HEATING INC
DOB violations
  • Sep 23, 2024LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 4, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Dec 2, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 2, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 2, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 2, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 26, 2013E-ELEVATOR ELEVATORREQUIRED
  • Feb 19, 2013LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Aug 8, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2011E-ELEVATOR ELEVATORREQUIRED
  • Mar 10, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 10, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 30, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 30, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 30, 2009E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2007L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Aug 9, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2006E-ELEVATOR ELEVATORREQUIRED
  • Dec 7, 2005E-ELEVATOR ELEVATORREQUIRED
  • Dec 7, 2005E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2002L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1014510023

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
5 active sale listings in the current corpus · latest record Aug 24, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
164 permits in the current corpus · latest record Aug 2, 2005

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
32 violations in the current corpus · latest record Aug 11, 2021

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
54 violations in the current corpus · latest record Sep 23, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.