CurbScoop
CurbScoopBuildingsLenox Hill315 EAST 72 STREET

315 EAST 72 STREET

Manhattan· Lenox Hill· built 1958class D4BBL 1014470009
Open listing source

315 EAST 72 STREET is a 219-unit building in Lenox Hill, Manhattan, built in 1958.

1 unit is on the market here right now.

City records show 30 DOB permits and 57 open violations on file.

Units (res)
219
Floors
20.5
Lot ft²
20,988 ft²
Bldg ft²
276,481 ft²
Assessed
$34.2M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
315 EAST 72 STREET #3A
Manhattan · built 1958
Lenox Hill$675K-0 ft²studio · 1 ba-153
1 HPD-C8 DOBbedbug
11.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 2, 2022 · VIOLATION DISMISSED
  • A
    SECTION 27-2005 ADM CODE REFIT THE DOOR IN THE TERRACE LOCATED AT APT PHH, 1st APARTMENT FROM WEST AT NORTH
    Jul 30, 2015 · #PHH · NOV CERTIFIED LATE
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT PHH, 1st APARTMENT FROM WEST AT NORTH
    Apr 26, 2013 · #PHH · NOV SENT OUT
  • B
    SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT PHH, 1st APARTMENT FROM WEST AT NORTH
    Apr 26, 2013 · #PHH · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT PHH, 1st APARTMENT FROM WEST AT NORTH
    Apr 26, 2013 · #PHH · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT PH, 22nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 1, 2012 · #PH · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT PHH, 22nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 1, 2012 · #PHH · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE FLOOR TILES IN THE TERRACE LOCATED AT APT PH, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 22, 2012 · #PH · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT PH, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 22, 2012 · #PH · NOV SENT OUT
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT PH, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 22, 2012 · #PH · NOV SENT OUT
  • B
    SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT PH, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 22, 2012 · #PH · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTOR AT THE SOUTH WALL IN THE TERRACE LOCATED AT APT PH, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 22, 2012 · #PH · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE SINK CABINETS IN THE KITCHEN LOCATED AT APT 21L, 21st STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 21, 2009 · #21L · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WALL CABINETS IN THE KITCHEN LOCATED AT APT 21L, 21st STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 21, 2009 · #21L · NOV SENT OUT
  • C
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER [TEMP.132F] IN THE ENTIRE APARTMENT LOCATED AT APT 21L, 21st STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 4, 2009 · #21L · NOV CERTIFIED LATE
  • B
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF GAS RANGE WITH LINGERING GAS FUMES AFTER STOVE SHUT OFF. IN THE KITCHEN LOCATED AT APT 21L, 21st STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2009 · #21L · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 21L, 21st STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2009 · #21L · NOV SENT OUT
DOB permits (last 30)
  • OTJun 8, 2018
    QUINN-ONELLI INC
  • OTJan 16, 2013
    QUINTEROS CONSTRUCTION CO
  • OTDec 19, 1990
    ATLAS WELDING & BOILER REPAIR IN
  • OT-
    DINAL EQUITIES INC.
  • PL-
    KATAN P & H INC
  • OT-
    QUINTEROS CONSTRUCTION CO
  • PL-
    POPULAR PLBG & HTG CORP
  • OT-
    NATIVO GENERAL CONTRACTING INC
  • PL-
    M C M PLBG & HTG, INC
  • OT-
    CHATEAU GC LLC
  • OT-
    SIGNATURE AUDIO DESIGN LL
  • MH-
    SIGNATURE AUDIO DESIGN LL
  • OT-
    QUINTEROS CONSTRUCTION CO
  • PL-
    ALAFOGIANNIS PLUMB HEAT
  • OT-
    JWN INTERIORS
  • OT-
    SKILLCRAFT INC
  • PL-
    NEPTUNE MECHANICAL INC.
  • OT-
    WESBUILT CONSTRUCTION MAN
  • OT-
    CAMPBELL DESIGN & CONSTRU
  • OT-
    UPGRADE CONTR. CO. INC
  • OT-
    GLOBE PLBG & HTG CORP
  • MH-
    GLOBE PLBG & HTG CORP
  • PL-
    GLOBE PLBG & HTG CORP
  • PL-
    F&G MECHANICAL, INC
  • OT-
    SIGNATURE AUDIO DESIGN LL
  • OT-
    ORION CONSTRUCTION & PAIN
  • OT-
    ORION CONSTRUCTION & PAIN
  • OT-
    C & M KINGS CONSTRUCTION*
  • OT-
    AM&G WATERPROOFING LLC
  • PL-
    P.S.I. MECHANICAL
DOB violations
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Aug 30, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2019E-ELEVATOR ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 30, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 16, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 16, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 16, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2013AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2012EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 29, 2012C-CONSTRUCTION OTHER OPTIONAL
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 1, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 23, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 23, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 23, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2006E-ELEVATOR ELEVATORREQUIRED
  • Nov 1, 2004C-CONSTRUCTION OTHER OPTIONAL
  • Jul 11, 2002E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2002E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2002E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2001E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2001E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1014470009

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 24, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
257 permits in the current corpus · latest record Jun 8, 2018

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
17 violations in the current corpus · latest record Nov 15, 2022

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
47 violations in the current corpus · latest record Dec 1, 2021

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.