CurbScoop
CurbScoopBuildingsLenox Hill304 EAST 65 STREET

304 EAST 65 STREET

Manhattan· Lenox Hill· built 1987class RMBBL 1014397501
Open listing source

304 EAST 65 STREET is a 124-unit building in Lenox Hill, Manhattan, built in 1987.

2 units are on the market here right now.

City records show 30 DOB permits and 58 open violations on file.

Units (res)
124
Floors
39.0
Lot ft²
9,670 ft²
Bldg ft²
126,195 ft²
Assessed
$26.5M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
304 EAST 65 STREET #PHB/D
Manhattan · built 1987
Lenox Hill$3.35M$1,3662,453 ft²4 bd · 3 ba-32
1 HPD-C10 DOBbedbug
12.8Source
304 EAST 65 STREET #PHB
Manhattan · built 1987
Lenox Hill$2.25M$1,2861,750 ft²2 bd · 2 ba-29
1 HPD-C10 DOBbedbug
12.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ....ELECTRICAL OUTLET AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE (AT COLD WATER ) AT WASH BASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ELECTRICAL LIGHT FIXTURE AT THE CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ...ELECTRICAL OUTLET AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 5, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES LIGHT FIXTURE AT SOUTH WALL AND ELETRICAL OUTLET AT EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 8, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING LIGHT FIXTURE AND ALL ELECTRICAL OULETS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 8, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING LIGHT FIXTURE AND ALL ELECTRICAL OULETS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 8, 2023 · #6B · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 8, 2023 · #6B · VIOLATION CLOSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT THE BATHTUB... IN THE 2nd BATHROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 1, 2022 · #6B · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FIXTURE AT CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 1, 2022 · #6B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FIXTURE AT THE CEILING IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 1, 2022 · #6B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FIXTURE AT THE CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 1, 2022 · #6B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 1, 2022 · #6B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FIXTURE AT THE CEILING IN THE 2nd BATHROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Nov 1, 2022 · #6B · VIOLATION CLOSED
DOB permits (last 30)
  • OTJan 5, 2017
    SATO CONSTRUCTION CO.INC
  • OTNov 8, 2010
    INTEGKRAL DESIGN & CONSTR
  • OTAug 6, 2003
    GABE CONSTRUCTION AND DEVELOP CO
  • OT-
    SATO CONSTRUCTION CO.INC
  • MH-
    SATO CONSTRUCTION CO.INC
  • PL-
    ARIANA CONTRACTING INC
  • OT-
    SATO CONSTRUCTION CO.INC
  • PL-
    M & A PLUMBING & HEATING CORP
  • OT-
    SATO CONSTRUCTION CO.INC
  • OT-
    PRO-TONE PAINTING & CONTRACTING
  • OT-
    FARO BLDG CORPORATION
  • MH-
    SATO CONSTRUCTION CO.INC
  • PL-
    BARGAIN PLMBING & HTGING
  • PL-
    MORTON L CHAIT
  • PL-
    SERVICE PLUS PLB AND HTG CO INC
  • OT-
    SATO CONSTRUCTION CO.INC
  • FP-
    NEW YORK BUSINESS FIRE SYSTEM IN
  • OT-
    S. DONADIC INC
  • OT-
    URBAN ARCHITECTURAL INTER
  • OT-
    LARKIN AND MCALLISTER CONST CO
  • PL-
    S AND H PLBG INC
  • OT-
    IN HOUSE GROUP INC
  • PL-
    PAUL QUINN
  • OT-
    MK WOODWORKING INC
  • EQ-
    ROCKLEDGE SCAFFOLD
  • PL-
    GLOBE PLBG & HTG CORP
  • PL-
    AGS MAROSY PLMB & HTNG CO INC
  • EQ-
    NEW CENTURY CONSTRUCTION
  • AL-
    HABILE & SONS,INC.
  • PL-
    C & T PLUMBING & HTG INC
DOB violations
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Feb 18, 2022FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Feb 3, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 3, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 25, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 30, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 4, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 24, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 20, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 15, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 7, 2017FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Aug 26, 2016E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2016E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2014FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Sep 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 16, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 16, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 16, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Aug 15, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 26, 2009E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1014397501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 3, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
114 permits in the current corpus · latest record Jan 5, 2017

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
18 violations in the current corpus · latest record Mar 29, 2024

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
56 violations in the current corpus · latest record Jul 23, 2024

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.