CurbScoop
CurbScoop›Buildings›Lenox Hill›243 EAST 77 STREET

243 EAST 77 STREET

Manhattan· Lenox Hill· built 1910class D4BBL 1014320017
Open listing source

243 EAST 77 STREET is a 13-unit building in Lenox Hill, Manhattan, built in 1910.

3 units are on the market here right now.

City records show 30 DOB permits and 27 open violations on file.

Units (res)
13
Floors
6.0
Lot ft²
2,554 ft²
Bldg ft²
12,220 ft²
Assessed
$1.58M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
243 EAST 77 STREET #2A
Manhattan · built 1910
Lenox Hill$849K$864983 ft²2 bd · 1 ba-53
1 HPD-C2 DOBbedbugrodent
10.5Source
243 EAST 77 STREET #PHA
Manhattan · built 1910
Lenox Hill$3.75M-0 ft²2 bd · 3 ba-59
1 HPD-C2 DOBbedbugrodent
10.5Source
243 EAST 77 STREET #PHA
Manhattan · built 1910
Lenox Hill$3.75M$1,4022,675 ft²2 bd · 3 ba-59
1 HPD-C2 DOBbedbugrodent
10.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 22, 2024 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORY
    Jun 10, 2019 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jun 10, 2019 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Jun 10, 2019 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    Jun 10, 2019 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Jun 10, 2019 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR SIGN MISSING AT PUBLIC HALL, 1st STORY
    Jun 10, 2019 · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 11, 2019 · #4B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY
    May 11, 2019 · #4B · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 9, 2018 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 25, 2016 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 1, 2015 · VIOLATION DISMISSED
DOB permits (last 30)
  • Suspended ScaffoldOct 7, 2024
  • Sidewalk ShedMar 22, 2022
    J & G CONSTRUCTION SVCS
  • StructuralJan 30, 2022
    EVERLAST SOLUTIONS CORP
  • StructuralJan 30, 2022
    DK BUILDERS INC
  • StructuralJan 30, 2022
    DK BUILDERS INC
  • SprinklersMar 15, 2021
    MASTER FIRE SYSTEMS, INC
  • SprinklersMar 15, 2021
    MASTER FIRE SYSTEMS, INC
  • Sidewalk ShedOct 7, 2019
    TOPLINE NYC CONTRACTING
  • Sidewalk ShedOct 7, 2019
    TOPLINE NYC CONTRACTING
  • PL-
    C &Z MECHANICAL P & H INC
  • OT-
    MAXIMUS FINE INTERIOR DES
  • MH-
    MAXIMUS FINE INTERIOR DES
  • OT-
    ART + 1, INC
  • BL-
    A & E MECHANICAL CORP
  • PL-
    A & E MECHANICAL CORP
  • OT-
    R.D. RICE CONSTR, INC
  • MH-
    R.D. RICE CONSTR, INC
  • MH-
    HOME IMPROV. SPECIAL. LLC
  • OT-
    HOME IMPROV. SPECIAL. LLC
  • PL-
    DC PLUMBING INC.
  • PL-
    GW MECHANICAL CORP
  • PL-
    INFINITI ESC PLUMBING COR
  • EQ-
    POWERS BRIDGING & SCAFF
  • OT-
    ART + 1, INC
  • PL-
    MIKE CATSIMALIS PLUMB HEAT
  • OT-
    ACCURA RESTORATION INC
  • OT-
    TAURUS CONSTRUCTION CORP
  • MH-
    TAURUS CONSTRUCTION CORP
  • EQ-
    ROCKLEDGE SCAFFOLD
  • MH-
    CAPITAL IMPROVEMENT SERVI
DOB violations
  • Oct 27, 2021FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Oct 27, 2021FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Aug 24, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 28, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 1, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 29, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2003E-ELEVATOR ELEVATORREQUIRED
  • Aug 22, 2000E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 1999LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 16, 1990E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 1989E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1014320017

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jul 16, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
51 permits in the current corpus · latest record Oct 7, 2024

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
12 violations in the current corpus · latest record Sep 30, 2025

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
15 violations in the current corpus · latest record Oct 27, 2021

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.