CurbScoop
CurbScoopBuildingsLenox Hill240 EAST 76 STREET

240 EAST 76 STREET

Manhattan· Lenox Hill· built 1957class RMBBL 1014307501
Open listing source

240 EAST 76 STREET is a 293-unit building in Lenox Hill, Manhattan, built in 1957.

1 unit is on the market here right now.

City records show 30 DOB permits and 37 open violations on file.

Units (res)
293
Floors
16.0
Lot ft²
21,455 ft²
Bldg ft²
261,701 ft²
Assessed
$34.3M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
240 EAST 76 STREET #17H
Manhattan · built 1957
Lenox Hill$1.15M$1,1361,012 ft²2 bd · 2 ba-18
1 HPD-C9 DOBbedbug
13.6Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Aug 11, 2020 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Aug 11, 2020 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Aug 11, 2020 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Aug 11, 2020 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT 1ST STORY PUBLIC HALL AND OUTSIDE DOOR OF THE BOILER ROOM
    Aug 11, 2020 · NOV SENT OUT
DOB permits (last 30)
  • PLSep 21, 2018
    ARK-POL PLUMBING CORP
  • OT-
    EPC MANAGEMENT INC
  • OT-
    PERSPECTIVE CONST CORP
  • EQ-
    SPRING SCAFFOLDING LLC
  • OT-
    GELCO BUILDERS INC
  • OT-
    ZHONGSHUN
  • OT-
    AM&G WATERPROOFING LLC
  • OT-
    IZZO CONSTRUCTION, CORP
  • EQ-
    COLGATE SCAFFOLDING
  • OT-
    PRIME CONTRACTING INC
  • OT-
    HORIZON FINE INTERIORS
  • EQ-
    RSM MAINTENANCE LLC
  • OT-
    RSM MAINTENANCE LLC
  • MH-
    RSM MAINTENANCE LLC
  • PL-
    SANDY'S PLBG & HTG CO LTD
  • PL-
    UNIC CO. INC.
  • PL-
    BAY RIDGE INC
  • OT-
    PRIME CONTRACTING INC
  • EQ-
    N.B.A CONSTRUCTION INC
  • OT-
    AM&G WATERPROOFING LLC
  • OT-
    SATO CONSTRUCTION CO.INC
  • OT-
    AM&G WATERPROOFING LLC
  • PL-
    APOLLO PL & HTG INC
  • OT-
    GREEN TECH INC
  • EQ-
    GABE CONSTR.
  • OT-
    GABE CONST.
  • PL-
    DOLE PLUMBING & HEATING CORP.
  • MH-
    GREEN TECH INC
  • OT-
    NATIONAL MECHANICAL SERVI
  • FS-
    NEAL M. RUDIKOFF
DOB violations
  • Mar 11, 2024P-PLUMBING NONE
  • Mar 2, 2022AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 5, 2022AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 5, 2022AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 5, 2022AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 10, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2018P-PLUMBING NONE
  • Aug 12, 2018P-PLUMBING NONE
  • Sep 9, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • May 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 16, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 30, 2007LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Jun 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2005E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1014307501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jun 12, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 13, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
124 permits in the current corpus · latest record Sep 21, 2018

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
5 violations in the current corpus · latest record Aug 12, 2020

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
32 violations in the current corpus · latest record Mar 11, 2024

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.