CurbScoop
CurbScoopBuildingsLenox Hill235 EAST 73 STREET

235 EAST 73 STREET

Manhattan· Lenox Hill· built 1936class D4BBL 1014280017
Open listing source

235 EAST 73 STREET is an 84-unit building in Lenox Hill, Manhattan, built in 1936.

3 units are on the market here right now.

City records show 30 DOB permits and 74 open violations on file.

Units (res)
84
Floors
13.0
Lot ft²
10,216 ft²
Bldg ft²
88,955 ft²
Assessed
$10.8M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
235 EAST 73 STREET #PHA
Manhattan · built 1936
Lenox Hill$3.65M$1,6592,200 ft²2 bd · 2 ba-56
3 HPD-C14 DOBbedbug
19.7Source
235 EAST 73 STREET #1G
Manhattan · built 1936
Lenox Hill$515K-0 ft²studio · 1 ba-12
3 HPD-C14 DOBbedbug
19.7Source
235 EAST 73 STREET #6A
Manhattan · built 1936
Lenox Hill$2.45M-0 ft²3 bd · 3 ba-29
3 HPD-C14 DOBbedbug
19.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR INSIDE CLOSET AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 4, 2026 · #3B · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LIGHT FIXTURE AT CEILING IN THE FOYER LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 4, 2026 · #3B · VIOLATION OPEN
  • A
    §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE
    Mar 2, 2026 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT INSTALLED AT WEST WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN NORTH/WEST CLOSET IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Sep 23, 2025 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN NORTH/EAST CLOSET IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICIAL LIGHT FIXTURE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • B
    566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF GNATS IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRES AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT WEST CLOSET IN THE FOYER LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 23, 2025 · #3B · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 6, 2025 · #3B · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING A STOPPER INSTALLED AT BUILDING ENTRANCE DOOR.
    May 28, 2025 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
    May 28, 2025 · INVALID CERTIFICATION
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY
    May 28, 2025 · INVALID CERTIFICATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY
    May 28, 2025 · INVALID CERTIFICATION
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
    May 9, 2025 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
    May 9, 2025 · NOV SENT OUT
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, EAST, AND WEST WALLS IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY
    May 9, 2025 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 9, 2025 · #3B · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
    Apr 2, 2025 · INVALID CERTIFICATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDED MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY
    Apr 2, 2025 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
    Apr 2, 2025 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
    Sep 14, 2024 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY
    Sep 14, 2024 · VIOLATION DISMISSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING PERMANENT DOOR STOPPER INSTALLED AT BUILDING ENTRANCE DOOR.
    Sep 14, 2024 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING. AT PUBLIC HALL, 1st STORY
    Sep 14, 2024 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM - MISSING AT PUBLIC HALL, 1st STORY
    Jul 11, 2017 · VIOLATION CLOSED
DOB permits (last 30)
  • OTMar 18, 1996
    EBRO RESTORATION
  • OTFeb 25, 1991
    PHOENIX COMBUSTION CORP
  • OT-
    S. DONADIC WOODWORKING, INC.
  • OT-
    AMERITECH CONSTRUCTION C
  • OT-
    A&G DESIGN CORPORATION
  • OT-
    A&G DESIGN CORPORATION
  • OT-
    ANTHONY SIMNOWSKI CONSTRUCTION
  • SP-
    NEW MISTY PLUMBING II CORP
  • PL-
    PF PLUMBING & HEATING, INC
  • PL-
    P.S.I. MECHANICAL
  • OT-
    A J INTNL CONSTR. 1 INC
  • PL-
    LANDO & ASSOCIATES, INC
  • OT-
    AMSTERDAM RESTORATION COR
  • OT-
    BELIDA CONSTRUCTION CORP INC
  • OT-
    PHOENIX COMBUSTION CORP
  • PL-
    P.S.I. MECHANICAL
  • PL-
    GOLDS PLUMBING & HEATING
  • EQ-
    AMSTERDAM RESTORATION COR
  • OT-
    A&G DESIGN CORPORATION
  • OT-
    PARKSIDE CONSTRUCTION INC
  • OT-
    PARKSIDE CONSTRUCTION INC
  • PL-
    P.S.I. MECHANICAL
  • OT-
    EBRO RESTORATION
  • EQ-
    AMSTERDAM RESTORATION COR
  • OT-
    AMSTERDAM RESTORATION COR
  • OT-
    AMSTERDAM RESTORATION COR
  • OT-
    AMERITECH CONSTRUCTION C
  • EQ-
    SPRING ENTERPRIES INC.
  • AL-
    PROS FROM DOVER
  • MH-
    S. DONADIC WOODWORKING, INC.
DOB violations
  • Jun 23, 2024EARCX-FAILURE TO SUBMIT EER NONE
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Aug 21, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 19, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 10, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2017BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2017BENCH-FAILURE TO BENCHMARK NONE
  • Sep 4, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jul 19, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 4, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 4, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 29, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 29, 2009E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 13, 2004LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 28, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2004E-ELEVATOR ELEVATORREQUIRED
  • Nov 9, 2000E-ELEVATOR ELEVATORREQUIRED
  • Nov 9, 2000E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 1999LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 19, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1014280017

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jun 19, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 13, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
89 permits in the current corpus · latest record Mar 18, 1996

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
52 violations in the current corpus · latest record Aug 4, 2026

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
34 violations in the current corpus · latest record Jun 23, 2024

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.