CurbScoop
CurbScoop›Buildings›Lenox Hill›200 EAST 66 STREET

200 EAST 66 STREET

Manhattan· Lenox Hill· built 1951class RMBBL 1014207501landmark
Open listing source

200 EAST 66 STREET is a 490-unit building in Lenox Hill, Manhattan, built in 1951.

12 units are on the market here right now.

City records show 30 DOB permits and 71 open violations on file.

Units (res)
490
Floors
20.0
Lot ft²
98,108 ft²
Bldg ft²
848,848 ft²
Assessed
$133.0M
DOF total
Comps L5y
0

Active sale listings (12)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
200 East 66th Street #D206
Manhattan · built 1951
Lenox Hill$1.63M$1,4331,134 ft²1 bd · 2 ba-115
9 HPD-C8 DOBbedbug
23.8Source
200 EAST 66 STREET #D2005
Manhattan · built 1951
Lenox Hill$5.25M$2,2992,284 ft²3 bd · 3 ba-82
9 HPD-C8 DOBbedbug
23.8Source
200 East 66th Street #D1102
Manhattan · built 1951
Lenox Hill$2.69M$1,8611,448 ft²3 bd · 2 ba-46
9 HPD-C8 DOBbedbug
23.8Source
200 East 66th Street #PH-E2103
Manhattan · built 1951
Lenox Hill$4.25M$2,4841,711 ft²2 bd · 2 ba-100
9 HPD-C8 DOBbedbug
23.8Source
200 EAST 66 STREET #A304
Manhattan · built 1951
Lenox Hill$820K$1,475556 ft²studio · 1 ba-91
9 HPD-C8 DOBbedbug
23.8Source
200 EAST 66 STREET #D201
Manhattan · built 1951
Lenox Hill$2.39M$1,6341,463 ft²2 bd · 2 ba-30
9 HPD-C8 DOBbedbug
23.8Source
200 EAST 66 STREET #E1801
Manhattan · built 1951
Lenox Hill$1.40M-0 ft²1 bd · 1 ba-249
9 HPD-C8 DOBbedbug
23.8Source
200 EAST 66 STREET #D806
Manhattan · built 1951
Lenox Hill$1.68M$1,4771,134 ft²1 bd · 1 ba-96
9 HPD-C8 DOBbedbug
23.8Source
200 East 66th Street #B1503
Manhattan · built 1951
Lenox Hill$2.50M$1,6711,496 ft²2 bd · 2 ba-194
9 HPD-C8 DOBbedbug
23.8Source
200 East 66th Street #C502
Manhattan · built 1951
Lenox Hill$2.19M$1,6301,347 ft²2 bd · 2 ba-248
9 HPD-C8 DOBbedbug
23.8Source
200 EAST 66 STREET #C402
Manhattan · built 1951
Lenox Hill$2.08M$1,5401,349 ft²2 bd · 2 ba-158
9 HPD-C8 DOBbedbug
23.8Source
200 EAST 66 STREET #D202
Manhattan · built 1951
Lenox Hill$2.35M$1,6031,466 ft²2 bd · 2 ba-29
9 HPD-C8 DOBbedbug
23.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 29, 2026 · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 15, 2023 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2021 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Aug 10, 2020 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Aug 10, 2020 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT 1ST STORY PUBLIC HALL AND OUTSIDE DOOR OF BOILER ROOM
    Aug 10, 2020 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED BOILER ROOM AT BASEMENT
    Feb 14, 2019 · NOV SENT OUT
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT D1104, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 14, 2019 · #D1104 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Jan 7, 2019 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Jan 7, 2019 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jan 7, 2019 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Jan 7, 2019 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR ... AT PUBLIC HALL, 1st STORY
    Aug 24, 2015 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX ... AT PUBLIC HALL, 1st STORY
    Aug 24, 2015 · NOV SENT OUT
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES THROUGHOUT IN THE 1st BATHROOM FROM EAST LOCATED AT APT A201, 2nd STORY, APARTMENT AT EAST , SECTION AT WEST
    Aug 24, 2015 · #A201 · NOV SENT OUT
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES THROUGHOUT IN THE 2nd BATHROOM FROM EAST LOCATED AT APT A201, 2nd STORY, APARTMENT AT EAST , SECTION AT WEST
    Aug 24, 2015 · #A201 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Aug 24, 2015 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Aug 24, 2015 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM ... AT PUBLIC HALL, 1st STORY
    Aug 24, 2015 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Aug 24, 2015 · NOV SENT OUT
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES IN THE BATHROOM LOCATED AT APT A201, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 13, 2015 · #A201 · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT A201, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 13, 2015 · #A201 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT A201, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 13, 2015 · #A201 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACK WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT A201, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Aug 13, 2015 · #A201 · NOV SENT OUT
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT A0303, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Dec 10, 2014 · #A0303 · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). OR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT A602, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jul 8, 2014 · #A602 · VIOLATION CLOSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 2; ONE WAY SCREWS AND WINDOW STOPS MISSING AT AIR CONDITIONER UNITS IN THE ENTIRE APARTMENT LOCATED AT APT A602, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jul 8, 2014 · #A602 · VIOLATION DISMISSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 10; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT A602, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jul 8, 2014 · #A602 · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR ''MISSING'' IN THE ENTIRE APARTMENT LOCATED AT APT A602, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jul 8, 2014 · #A602 · VIOLATION CLOSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT A602, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jul 8, 2014 · #A602 · VIOLATION CLOSED
DOB permits (last 30)
  • Mechanical SystemsAug 15, 2026
    GOTHAM GENERAL CARPENTRY
  • General ConstructionAug 15, 2026
    GOTHAM GENERAL CARPENTRY
  • General ConstructionJul 15, 2026
    TLD SERVICES INC
  • General ConstructionJun 29, 2026
    TLD SERVICES INC
  • PlumbingMay 13, 2026
    OSSO PLUMBING & HEATING
  • General ConstructionMay 8, 2026
    BLUESTONE CONSTRUCTION AN
  • General ConstructionMar 8, 2026
    PRONOS CONSTRUCTION CORP
  • SignFeb 2, 2026
    NEPTUNE SIGNS&AWNINGS INC
  • PlumbingJan 26, 2026
    ADRIATIC PLBG & HTG CORP
  • Mechanical SystemsJan 23, 2026
    BOBBY J. ENTERPRISE INC
  • General ConstructionJan 5, 2026
    YOUN DESIGN CORP
  • General ConstructionDec 5, 2025
    BOBBY J. ENTERPRISE INC
  • PlumbingDec 5, 2025
    NEW YORK PARK PLBG&HTG CO
  • PlumbingNov 28, 2025
    ALL PRO PLBG & HTG INC
  • Mechanical SystemsNov 25, 2025
    JOHN EVAN CONTRACTING COR
  • Mechanical SystemsNov 25, 2025
    BOBBY J. ENTERPRISE INC
  • General ConstructionNov 24, 2025
    JOHN EVAN CONTRACTING COR
  • PlumbingNov 19, 2025
    NEW YORK PARK PLBG&HTG CO
  • General ConstructionNov 18, 2025
    BOBBY J. ENTERPRISE INC
  • General ConstructionAug 26, 2025
    BOBBY J. ENTERPRISE INC
  • General ConstructionJun 3, 2025
    BOBBY J. ENTERPRISE INC
  • Mechanical SystemsJun 2, 2025
    I & H CONSTRUCTION LLC
  • Mechanical SystemsJun 2, 2025
    I & H CONSTRUCTION LLC
  • PlumbingMay 28, 2025
    ADRIATIC PLBG & HTG CORP
  • General ConstructionMay 27, 2025
    BOBBY J. ENTERPRISE INC
  • Mechanical SystemsMay 19, 2025
    BOBBY J. ENTERPRISE INC
  • PlumbingMay 12, 2025
    NEW YORK PARK PLBG&HTG CO
  • Mechanical SystemsMay 7, 2025
    BOBBY J. ENTERPRISE INC
  • PlumbingMay 2, 2025
    P.S.I. MECHANICAL
  • PlumbingMay 2, 2025
    P.S.I. MECHANICAL
DOB violations
  • Jan 27, 2026LANDMK-LANDMARK NONE
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 1, 2023EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Oct 4, 2023AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 21, 2023C-CONSTRUCTION OTHER OPTIONAL
  • Dec 1, 2022EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Feb 28, 2022LANDMK-LANDMARK NONE
  • Dec 29, 2021E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Sep 16, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 6, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1014207501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
12 active sale listings in the current corpus · latest record Aug 19, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
858 permits in the current corpus · latest record Oct 1, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
31 violations in the current corpus · latest record Apr 29, 2026

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
105 violations in the current corpus · latest record Feb 19, 2026

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.