CurbScoop
CurbScoopBuildings233 EAST 62 STREET

233 EAST 62 STREET

Manhattan· built 1875class A4BBL 1014170015

233 EAST 62 STREET is a 1-unit building in Manhattan, built in 1875.

1 unit is on the market here right now.

City records show 9 DOB permits and 48 open violations on file.

Units (res)
1
Floors
4.0
Lot ft²
1,674 ft²
Bldg ft²
4,376 ft²
Assessed
$454K
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
233 EAST 62 STREET
Manhattan · built 1875
-$8.25M$1,3756,000 ft²6 bd · 6 ba-67
3 HPD-C1 DOB
5.0Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN 3RD FLOOR IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN 2ND FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN 2ND FLOOR IN THE BATHROOM LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN 3RD FLOOR IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN 3RD FLOOR IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN 3RD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR SOUTH WALL IN BOILER ROOM AT CELLAR
    Jul 30, 2025 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK BEHIND SOUTH WALL IN BOILER ROOM AT CELLAR
    Jul 30, 2025 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE FLOOR TILES AT TERRACE IN 4TH FLOOR LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN 3RD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
    Jul 30, 2025 · #1 · VIOLATION CLOSED
  • B
    866 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF FLIES IN THE ENTIRE APARTMENT LOCATED AT APT TOWNHO, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 1, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT TOWNHO, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 1, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT TOWNHO, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 1, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT TOWNHO, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 1, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT CELLAR IN THE 1st ROOM FROM NORTH LOCATED AT APT 1 LOWER LEVEL, 1st APARTMENT FROM WEST AT NORTH
    Jun 27, 2025 · #1 · VIOLATION CLOSED
  • A
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING 4TH STORY IN THE BATHROOM LOCATED AT APT 1 UPPER LEVEL, 1st APARTMENT FROM WEST AT NORTH
    Jun 27, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT UNDERNEATH THE COUNTERTOP AT NORTH WALL AT 4TH STORY IN THE 1st ROOM FROM NORTH LOCATED AT APT 1 UPPER LEVEL, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 18069301 ISSUED 27-JUN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b).
    Jun 27, 2025 · #1 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER GASKET AT FREEZER DOOR AT BASEMENT IN THE KITCHEN LOCATED AT APT 1 LOWER LEVEL, 1st APARTMENT FROM WEST AT NORTH
    Jun 27, 2025 · #1 · VIOLATION CLOSED
  • A
    § 27-2005 ADMIN. CODE: REFIT GLASS DOOR LEADING TO ROOF DECK AT SOUTH AT THE 4TH STORY IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1 UPPER LEVEL, 1st APARTMENT FROM WEST AT NORTH
    Jun 27, 2025 · #1 · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT UNDERNEATH THE COUNTERTOP AT NORTH WALL AT 4TH STORY IN THE 1st ROOM FROM NORTH LOCATED AT APT 1 UPPER LEVEL, 1st APARTMENT FROM WEST AT NORTH
    Jun 27, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST AND SOUTH WALLS AT CELLAR IN THE 4th ROOM FROM NORTH LOCATED AT APT 1 LOWER LEVEL, 1st APARTMENT FROM WEST AT NORTH
    Jun 27, 2025 · #1 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AT CELLAR
    Jun 24, 2025 · VIOLATION CLOSED
  • B
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT TOWNHO, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 24, 2025 · #TOWNHO · VIOLATION CLOSED
  • A
    § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT TOWNHO UPPER LEVEL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 24, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT TOWNHO UPPER LEVEL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 24, 2025 · #TOWNHO · VIOLATION CLOSED
  • A
    § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL AT CELLAR
    Jun 24, 2025 · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILLING, 3RD FLOOR IN THE 1st BATHROOM FROM NORTH LOCATED AT APT TOWNHO UPPER LEVEL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILLING, IN THE 1st BATHROOM FROM NORTH LOCATED AT APT TOWNHO UPPER LEVEL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILLING, IN THE 1st ROOM FROM NORTH LOCATED AT APT TOWNHO LOWER LEVEL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • C
    867 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CONDUCIVE TO PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAPS OR CRACKS IN WALLS,CEILINGS, FLOORS, FIXING LEAKS AND MANAGE GARBAGE IN PUBLIC AREAS. EVIDENCE FOUND AT EVIDENCE OF RATS IN THE ENTIRE APARTMENT LOCATED AT APT TOWNHO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT, AT CEILLING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT TOWNHO UPPER LEVEL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17854833 ISSUED 27-APR-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b).
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT TOWNHO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT TOWNHO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT, AT CEILLING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT TOWNHO UPPER LEVEL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILLING, IN THE 1st BATHROOM FROM NORTH LOCATED AT APT TOWNHO UPPER LEVEL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILLING, 3RD FLOOR IN THE 1st BATHROOM FROM NORTH LOCATED AT APT TOWNHO UPPER LEVEL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT WEST WALL, IN THE BATHROOM LOCATED AT APT TOWNHO MID LEVEL, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 27, 2025 · #TOWNHO · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH, EAST WALLS AT CELLAR AT PUBLIC HALL
    Apr 27, 2025 · VIOLATION CLOSED
  • A
    § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILLING, CELLAR AT PUBLIC HALL
    Apr 27, 2025 · VIOLATION CLOSED
DOB permits (last 30)
  • PLAug 17, 2006
    C2 PLUMBING CORP
  • OT-
    BAC CONSTRUCTION
  • AL-
    APICAL SERVICES INC
  • AL-
    B.A.C. CONSTRUCTION
  • MH-
    APICAL SERVICES INC
  • PL-
    C2 PLUMBING CORP
  • AL-
    APICAL SERVICES INC
  • AL-
    APICAL SERVICES INC
  • OT-
    BAC CONSTRUCTION
DOB violations
  • Sep 6, 2019ACJ1-(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACJ1-(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACJ1-(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Oct 1, 2012JVIOS-PRIVATE RESIDENTIAL ELEVATOR ELEVATOROPTIONAL
  • Sep 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 15, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2008LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 25, 2008E-ELEVATOR ELEVATORREQUIRED

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1014170015

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jun 25, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
9 permits in the current corpus · latest record Aug 17, 2006

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
79 violations in the current corpus · latest record May 19, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
8 violations in the current corpus · latest record Sep 6, 2019

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.