CurbScoop
CurbScoop›Buildings›Lenox Hill›224 EAST 60 STREET

224 EAST 60 STREET

Manhattan· Lenox Hill· built 1965class RMBBL 1014147501
Open listing source

224 EAST 60 STREET is a 137-unit building in Lenox Hill, Manhattan, built in 1965.

3 units are on the market here right now.

City records show 30 DOB permits and 54 open violations on file.

Units (res)
137
Floors
13.0
Lot ft²
13,496 ft²
Bldg ft²
94,371 ft²
Assessed
$17.7M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
220 EAST 60 STREET #6J
Manhattan · built 1965
Lenox Hill$675K$984686 ft²1 bd · 1 ba-78
6 HPD-Cbedbug
15.3Source
220 EAST 60 STREET #10A
Manhattan · built 1965
Lenox Hill$549K$1,236444 ft²studio · 1 ba-59
6 HPD-Cbedbug
15.3Source
220 EAST 60 STREET #14J
Manhattan · built 1965
Lenox Hill$975K$1,393700 ft²1 bd · 1 ba-237
6 HPD-Cbedbug
15.3Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LIGHT FIXTURE AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST AND SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET SEAL AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRING AT NORTH CLOSET WALL IN THE FOYER LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WASH BASIN CABINET IN THE BATHROOM LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SLIDING DOOR AT CLOSET IN THE FOYER LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 11D, 11th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jul 30, 2021 · #11D · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Oct 30, 2017 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 30, 2017 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX - MISSING AT PUBLIC HALL, 1st STORY
    Oct 30, 2017 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Oct 30, 2017 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Aug 3, 2017 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Aug 3, 2017 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Aug 3, 2017 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Aug 3, 2017 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT BOILER ROOM DOOR AND AT PUBLIC HALL, 1st STORY
    Aug 3, 2017 · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 11KN, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Nov 30, 2016 · #11KN · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT SINK IN THE KITCHEN LOCATED AT APT 11KN, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Nov 30, 2016 · #11KN · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 25, 2016 · VIOLATION DISMISSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 11J, 11th STORY, 4th APARTMENT FROM WEST AT NORTH
    Feb 12, 2015 · #11J · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 11J, 11th STORY, 4th APARTMENT FROM WEST AT NORTH
    Feb 12, 2015 · #11J · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT BUILDING ENTRANCE DOOR FROM STREET TO WALKIN BASEMENT PUBLIC HALL
    Oct 20, 2014 · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING 526 CONSISTING OF AN UNACCEPTABLE ELECTOMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING ENTRANCE DOOR FORM STREET TO WALKIN BASEMENT PUBLIC HALL
    Oct 20, 2014 · NOV SENT OUT
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOUBLE KEY OPERATED CYLINDER LOCKS AT BUILDING ENTRANCE DOORS FROM STREET TO WALKIN BASEMENT PUBLIC HALL
    Oct 20, 2014 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMPNESS NORTH WALL BATHROOM 9 STY NORTHWEST APT 9B. , SECTION '' ''
    Jul 1, 1993 · #9B · NOV SENT OUT
DOB permits (last 30)
  • Protection and Mechanical MethodsSep 28, 2026
    INTERSYSTEM CONSTRUCTION
  • Protection and Mechanical MethodsJun 5, 2026
    INTERSYSTEM CONSTRUCTION
  • Sidewalk ShedMay 5, 2026
    INTERSYSTEM CONSTRUCTION
  • Sidewalk ShedMay 5, 2026
    INTERSYSTEM CONSTRUCTION
  • Supported ScaffoldMay 5, 2026
    INTERSYSTEM CONSTRUCTION
  • Suspended ScaffoldApr 29, 2026
    PRAT ENTERPRISES CORP
  • General ConstructionSep 25, 2025
    2MO LLC
  • Suspended ScaffoldApr 15, 2025
    PEDROL CONTRACTING INC
  • Suspended ScaffoldApr 15, 2025
    PEDROL CONTRACTING INC
  • General ConstructionMay 7, 2024
    SHR GROUP INC
  • General ConstructionMay 7, 2024
    SHR GROUP INC
  • General ConstructionMay 7, 2024
    PRAT ENTERPRISES CORP
  • Sidewalk ShedMar 8, 2022
    INTERSYSTEM INSTALLATION
  • Sidewalk ShedMar 8, 2022
    INTERSYSTEM INSTALLATION
  • Sidewalk ShedJun 29, 2021
    INTERSYSTEM INSTALLATION
  • Sidewalk ShedJun 29, 2021
    INTERSYSTEM INSTALLATION
  • General ConstructionJun 21, 2021
    JEPOL CONSTRUCTION INC
  • General ConstructionJun 21, 2021
    JEPOL CONSTRUCTION INC
  • General ConstructionApr 20, 2021
    ABA QUALITY CONSTRUCTION
  • PlumbingApr 20, 2021
    RISER PLBG & HTG CORP
  • PlumbingApr 20, 2021
    RISER PLBG & HTG CORP
  • OT-
    JCT DEVELOPMENT NY INC
  • PL-
    GALICJA PLBG AND HTG.CORP
  • PL-
    BLATT PLUMBING INC
  • PL-
    D.C. PLUMBING INC
  • OT-
    SKYLINE RESTORATION INC
  • MH-
    M.I.M. MECHANICAL INC.
  • EQ-
    ROCKLEDGE SCAFFOLD
  • PL-
    KATAN P & H INC
  • OT-
    SKYLINE RESTORATION INC
DOB violations
  • Oct 11, 2019P-PLUMBING NONE
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 21, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 21, 2016E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 23, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 21, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 25, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 25, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 28, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jun 28, 2004E-ELEVATOR ELEVATORREQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1014147501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Apr 23, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
59 permits in the current corpus · latest record Sep 28, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
29 violations in the current corpus · latest record Aug 2, 2021

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
25 violations in the current corpus · latest record Dec 16, 2022

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.