CurbScoop
CurbScoopBuildingsLenox Hill177 EAST 77 STREET

177 EAST 77 STREET

Manhattan· Lenox Hill· built 1942class R4BBL 1014127503
Open listing source

177 EAST 77 STREET is a 57-unit building in Lenox Hill, Manhattan, built in 1942.

1 unit is on the market here right now.

City records show 30 DOB permits and 34 open violations on file.

Units (res)
57
Floors
12.0
Lot ft²
10,260 ft²
Bldg ft²
72,438 ft²
Assessed
$8.83M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
177 EAST 77 STREET #PHC
Manhattan · built 1942
Lenox Hill$2.60M$1,9921,305 ft²3 bd · 2 ba-10
1 DOBbedbug
6.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 17, 2025 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 4, 2025 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 3, 2022 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY
    Jun 27, 2017 · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING , 1st STORY
    Jun 27, 2017 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING., 1st STORY
    Jun 27, 2017 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. , 1st STORY
    Jun 27, 2017 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR . FRAME MISSING , 1st STORY
    Jun 27, 2017 · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY
    Jun 27, 2017 · VIOLATION DISMISSED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 25, 2016 · VIOLATION DISMISSED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 1, 2015 · VIOLATION DISMISSED
DOB permits (last 30)
  • MHAug 15, 2017
    J & S METRO CONTRACTING *
  • MHAug 20, 2016
    PMD DEVELOPMENT LLC
  • PL-
    MAGNUM PLBG. & HTG CORP.
  • OT-
    KNS BUILDING REST. INC
  • PL-
    ZEFI MECHANICAL INC
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    LANDMARK HOME IMPROV. INC
  • OT-
    QUALITY BUILDING CONSTRUT
  • EQ-
    SPRING SCAFFOLDING LLC
  • FS-
    RICHARD MORTMAN
  • OT-
    NATIONAL MECHANICAL SERVI
  • PL-
    STUART ISER INC
  • PL-
    EMPIRE PLUMBING INC
  • OT-
    LCO CONSTRUCTION MANAGEME
  • MH-
    LCO CONSTRUCTION MANAGEME
  • EQ-
    METRO CONTRACTING NY, INC
  • OT-
    HUGO CONSTRUCTION CORP
  • OT-
    CATS PAW BUILDERS INC
  • MH-
    CATS PAW BUILDERS INC
  • PL-
    CROSSFIELD P & H CORP
  • OT-
    PIER HEAD ASSOCIATES LTD
  • OT-
    QUALITY BUILDING CONSTRUT
  • PL-
    ZEFI MECHANICAL INC
  • PL-
    ZEFI MECHANICAL INC
  • OT-
    J.A.P EURO REMODELING,INC
  • OT-
    TJ EVERLASTING CONT CORP
  • OT-
    J & S METRO CONTRACTING *
  • MH-
    J & S METRO CONTRACTING *
  • PL-
    ZEFI MECHANICAL INC
  • MH-
    STANLEY RUTH CO INC
DOB violations
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 9, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 2, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 2, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 28, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 29, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Aug 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Mar 10, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 10, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jul 15, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 15, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2007E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1014127503

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 12, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 13, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
70 permits in the current corpus · latest record Aug 15, 2017

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
11 violations in the current corpus · latest record Nov 21, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
23 violations in the current corpus · latest record Dec 7, 2022

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.