CurbScoop
CurbScoopBuildings1091 LEXINGTON AVENUE

1091 LEXINGTON AVENUE

Manhattan· built 1959class D4BBL 1014110053
Open listing source

1091 LEXINGTON AVENUE is a 95-unit building in Manhattan, built in 1959.

1 unit is on the market here right now.

City records show 30 DOB permits and 46 open violations on file.

Units (res)
95
Floors
16.0
Lot ft²
17,368 ft²
Bldg ft²
199,358 ft²
Assessed
$24.3M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
150 EAST 77 STREET #12B
Manhattan · built 1959
-$895K-0 ft²1 bd · 1 ba-31
16 DOBbedbug
20.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 10C, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 31, 2000 · #10C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 10C, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 31, 2000 · #10C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 10C, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 31, 2000 · #10C · NOV SENT OUT
  • B
    SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE AND ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 10C, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 31, 2000 · #10C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING BATHROOM 13 STY SOUTHEASTAPT 14F. , SECTION '' ''
    Jul 31, 1990 · #14F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING BATHROOM 13 STY SOUTHWEST APT 14F. , SECTION '' ''
    Jun 19, 1990 · #14F · NOV SENT OUT
DOB permits (last 30)
  • EQMar 25, 2004
    EMPIRE SCAFF. SYSTEM INC
  • OTFeb 22, 1996
    BARRY FISHELBERG CO INC
  • PLApr 24, 1995
    BOWEN PLG
  • MHFeb 8, 1993
    A B CONTRACTORS & DESIGNERS INC
  • OT-
    BERGEN H.V.A.C CORP.
  • MH-
    BERGEN H.V.A.C. CORP.
  • OT-
    THOMAS MONTEMAGNO
  • AL-
    HOMECREST INC
  • PL-
    M&M PLBG & HTG INC
  • FP-
    MASTER FIRE PREVENTION SYSTEM
  • OT-
    RICHMOND REMODEL&CONSTR
  • OT-
    CW AND SON INC
  • MH-
    CW AND SON INC
  • EQ-
    A B CONTRACTORS & DESIGNERS INC
  • PL-
    PETER MICELI PLUMBING
  • EQ-
    BABEL DESIGN INC
  • MH-
    A B CONTRACTORS & DESIGNERS INC
  • PL-
    LIBERTY PLG & HTG
  • PL-
    BEDROCK PLBG. & HTG., INC
  • PL-
    SUPERB PLUMBING & HEATING
  • OT-
    C C CONTROLLED COMBUSTION
  • PL-
    CC CONTROLLED PLBG CO INC
  • FB-
    CC CONTROLLED PLBG CO INC
  • PL-
    MAGOR PLG AND HTG
  • EQ-
    AMERICAN STORE FRONT CO INC
  • OT-
    AMERICAN STORE FRONT CO INC
  • OT-
    BARRY FISHELBERG CO INC
  • OT-
    FINIX U.S.A. CONSTRUCTION
  • OT-
    REVISION GENERAL CONSTRUCTION
  • OT-
    A B CONTRACTORS & DESIGNERS INC
DOB violations
  • Feb 20, 2024FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Aug 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 22, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jul 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Mar 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 14, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 14, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 14, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2006E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2004LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 13, 2004LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 17, 1999E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 1999E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 1999E-ELEVATOR ELEVATORREQUIRED
  • May 20, 1998ES-ELECTRIC SIGNS NONE
  • May 20, 1998ES-ELECTRIC SIGNS NONE
  • May 20, 1998ES-ELECTRIC SIGNS NONE
  • May 20, 1998C-CONSTRUCTION OTHER OPTIONAL
  • Apr 1, 1996ES-ELECTRIC SIGNS NONE

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1014110053

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jul 7, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
161 permits in the current corpus · latest record Mar 25, 2004

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
6 violations in the current corpus · latest record Sep 10, 2007

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
50 violations in the current corpus · latest record Apr 2, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.